Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: October 24, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 184513 | |||||
Plumbing permit Date: October 15, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 181459 | |||||
Alteration permit Date: October 22, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 183936 | |||||
Demolition permit Date: September 30, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 180036 | |||||
Demolition permit Date: September 30, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 180036 | |||||
Alteration permit Date: October 22, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 183936 | |||||
Electrical permit Date: October 24, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 184513 | |||||
Plumbing permit Date: October 15, 2008 Client: Phung Thuy Le | Permit status: Completed | Permit id: 181459 | |||||
SCORE 59 Interior alterations to include sheetrock and wall board where needed, new cabinets and tile. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated february 2007. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Date: October 22, 2008 Contractor: Matra Inc Client: Liescu Ross Iliescu Myra | Permit type: Alteration permit | Permit status: Completed | Completion date: December 22, 2008 | Permit id: 183936 | |||||
SCORE 99 Install two receptacles, three switches and three lights.... In accordance with 2005 nec Date: October 16, 2008 Contractor: Current Electric Client: Liescu Ross Iliescu Myra | Permit type: Electrical permit | Permit status: Completed | Completion date: January 8, 2009 | Permit id: 182960 | |||||
SCORE 59 Interior non-bearing demolition (sfd) Date: September 30, 2008 Contractor: Matra Inc Client: Liescu Ross Iliescu Myra | Permit type: Demolition permit | Permit status: Completed | Completion date: November 4, 2008 | Permit id: 180036 | |||||
SCORE 86 Replace soil stack from basement to 2nd floor bahtroom, replace sanitary tee, drain for water closet, basin and bathtub with pvc pipe & fittings. Repla 1 2 copper from basement to each fixture, install new bathtub, pedestal lavatory and water closet. Date: October 15, 2008 Contractor: Pileggi Thomas J Client: Liescu Ross Iliescu Myra | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 29, 2009 | Permit id: 181459 | |||||
SCORE 99 Install (7) receptacles, (3) switches, (4) lights, wire dishwasher.... In accordance with 2005 nec Date: October 24, 2008 Contractor: Current Electric Client: Liescu Ross Iliescu Myra | Permit type: Electrical permit | Permit status: Completed | Completion date: January 8, 2009 | Permit id: 184513 |