Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 28, 2016 Contractor: M H S Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Res electrical panel upgrade to 125amp; existing location Date: December 21, 2016 Contractor: Jamar Electric San Diego Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Final Date: February 13, 2017 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: September 2, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 28, 2016 Contractor: M H S Heating And Air Conditioning Inc Permit type: Mechanical - hvac change out | Permit status: Completed | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Res electrical panel upgrade to 125amp; existing location Date: December 21, 2016 Contractor: Jamar Electric San Diego Inc Permit type: Electrical only | Permit status: Issued | Permit id: Pds2016-Resalt- | Parcel: 5791531400 |