Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: January 9, 2008 Client: Xu Ru Gang | Permit status: Completed | Permit id: 119648 | |||||
Alteration permit Date: November 18, 2015 Client: Xu Ru Gang | Permit status: Completed | Permit id: 652164 | |||||
Zoning/use permit Date: March 9, 2016 Client: Xu Ru Gang | Permit status: Completed | Permit id: 654717 | |||||
Electrical permit Date: November 27, 2015 Client: Xu Ru Gang | Permit status: Expired | Permit id: 654712 | |||||
Plumbing permit Date: September 22, 2008 Client: Xu Ru Gang | Permit status: Completed | Permit id: 177398 | |||||
Plumbing permit Date: April 8, 2011 Client: Erik H Murer Esther G | Permit status: Completed | Permit id: 334723 | |||||
Permit for the removal of a fence wall and garage doors (no permits on file for current configuration) along the 7th street frontage. For the erection of a rear addition with roof deck and trellis above. For the creation of two (2), interior surface parking spaces, accessory to a single-family dwelling in an attached structure. Sizes and locations of parking and addition as shown in application / plan Date: December 28, 2015 Client: Xu Ru Gang | Applicant: Adam Laver | Permit type: Appeal | Permit status: Granted | Permit id: 26702 | |||||
Plumbing permit Date: September 22, 2008 Client: Xu Ru Gang | Permit status: Completed | Permit id: 177398 | |||||
Alteration permit Date: January 9, 2008 Client: Xu Ru Gang | Permit status: Completed | Permit id: 119648 | |||||
Alteration permit Date: November 18, 2015 Client: Xu Ru Gang | Permit status: Completed | Permit id: 652164 | |||||
Zoning use permit Date: March 9, 2016 Client: Xu Ru Gang | Permit status: Completed | Permit id: 654717 | |||||
Electrical permit Date: November 27, 2015 Client: Xu Ru Gang | Permit status: Expired | Permit id: 654712 | |||||
Plumbing permit Date: April 8, 2011 Client: Erik H Murer Esther G | Permit status: Completed | Permit id: 334723 | |||||
Permit for the removal of a fence wall and garage doors (no permits on file for current configuration) along the 7th street frontage. For the erection of a rear addition with roof deck and trellis above. For the creation of two (2), interior surface parking spaces, accessory to a single-family dwelling in an attached structure. Sizes and locations of parking and addition as shown in application plan Date: December 28, 2015 Client: Xu Ru Gang | Applicant: Adam Laver | Permit type: Appeal | Permit status: Granted | Permit id: 26702 | |||||
SCORE 89 Rewire existing kitchen with switches, lights, appliance recepts as per 2008 nec (cc district) Date: November 27, 2015 Contractor: Alba Electric And Remodeling Inc Client: Xu Ru Gang | Permit type: Electrical permit | Permit status: Expired | Completion date: November 27, 2015 | Permit id: 654712 | |||||
SCORE 86 Proposed 2 story rear addition and roof deck with proposed 2-car accessory garage. Proposed roof deck to have trellis and parapet walls with railing. Please see plans for additional info Date: March 9, 2016 Contractor: Campbell Thomas And Co Architect Client: Xu Ru Gang | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 9, 2016 | Permit id: 654717 | |||||
For the erection of a two (2) story rear addition and roof deck with including a two (2) car accessory garage as per plans. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: July 7, 2017 Client: Xu Ru Gang | Permit type: Addition permit | Permit status: Active | Completion date: July 7, 2017 | Permit id: 709170 | |||||
SCORE 100 For the exterior alteration to an existing historicall registered property as approved by the philadelphia historical commission. Scope of work includes the installation of 16 sash replacements as shown on the approved sketches. Date: January 9, 2008 Contractor: Emerald Windows Inc Client: Xu Ru Gang | Permit type: Alteration permit | Permit status: Completed | Completion date: February 28, 2008 | Permit id: 119648 | |||||
SCORE 100 1st floor: powder room replacing water closet and lav. Kitchen- replace sink. 2nd floor: (2) bathrooms: replacing water closet, lav and tub. (no additional piping on 1st and 2nd floors). 3rd floor: master bath rough-in and install water closet, (2) lavs, shower, tub. Date: September 22, 2008 Contractor: William Gruber Jr Client: Xu Ru Gang | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 22, 2009 | Permit id: 177398 | |||||
SCORE 99 Ez permit stadard alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: November 18, 2015 Contractor: Dremodeling Llc Client: Xu Ru Gang | Permit type: Alteration permit | Permit status: Completed | Completion date: March 29, 2016 | Permit id: 652164 | |||||
Remove and replace existing stairs from roof to grade as per plans. Date: November 6, 2008 Client: Erik H Murer Esther G | Permit type: Alteration permit | Permit status: Completed | Completion date: September 18, 2009 | Permit id: 182458 | |||||
SCORE 99 Replace rain leader Date: April 8, 2011 Contractor: Keith Oberholtzer Client: Erik H Murer Esther G | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 18, 2011 | Permit id: 334723 |