Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior renovation of existing place of worship. Renovate basment including new interior walls, bathrooms and baptisery. Renovate first floor and mezz level with new paint, hardwood floors, lighting. Renovate altar. Repaint trim. Remove and replace existing conrcrete or brick walkways in kind w/ same material. Existing hvac to remain. Date: March 2, 2012 Client: World Mission Society Inc | Applicant: World Mission Society Inc; Gerald Roper | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1205033 | |||||
Install two new beams and three new columns per plan. Date: April 18, 2012 Client: World Mission Society Inc | Applicant: World Mission Society Inc; Gerald Roper | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1207702 | |||||
Brick re-pointing. All mortar will be removed by hand. Mortar to be replaced with brick-lok standard light grey/beige mortar. Replace basement windows only. Windows will be replaced in kind with like material clear glass windows. Date: August 3, 2012 Client: World Mission Society Inc | Applicant: World Mission Society Inc; Gerald Roper | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1212288 | |||||
Interior demolition of non structural entities including: partitions, finishes, drywall, cabinetry, kitchen and bathroom fixtures, carpet, tile and interior doors. No structural demo or structural work. Repair existing roof. No sturctural changes to roof, repair only. Re-use existing slate shingles. No exterior door/window changes as per hpo stamped plans. Date: January 5, 2012 Client: Alex Post | Applicant: Alex Post; Gerald Roper | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200243 | |||||
Electrical Date: March 14, 2012 Client: World Mission Society, Inc | Permit status: Completed | Permit id: E1204275 | |||||
Replace 3 existing full glass double doors on the front and side of building. The old doors are in poor shape and have broken glass, leaking, etc. The new doors will be the same style as the old ones with one difference: the new doors might be white or bronze color aluminum instead of silver aluminum. Besides the color of the frame, the new doors are the same as the existing doors in style, location, size, opening, glass. Date: May 8, 2013 Client: World Mission Society Church Of God | Applicant: Alex Post | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1306617 | |||||
Replace broken portions of two stained-glass rose windows in church. One will have only the central oculus replaced to match the original. The other will have the central oculus, two lobes and two wedge pieces reproduced to match the original and one lobe repaired and reinstalled. No modifications or alterations of other windows. Existing windows. Date: May 6, 2014 Client: World Mission Society, Inc, Church Of God | Applicant: John Power | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1407085 | |||||
Flat roof repair some areas are leaking non- structural Date: October 28, 2014 Client: Michael Harris | Applicant: Michael Harris | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1500975 | |||||
Hang an outdoor vinyl advertising banner using a rope to attach it to the building structure. Will not drill or alter building for mounting, but will use a non-altering or damaging method by tying ropes to the banner. Date: May 8, 2014 Client: World Mission Society Church Of God | Applicant: Power; None | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400263 | |||||
Electrical Date: March 14, 2012 Client: World Mission Society, Inc | Permit status: Completed | Permit id: E1204275 | |||||
SCORE 59 Plumbing and gas Date: March 14, 2012 Client: World Mission Society, Inc | Permit status: Completed | Permit id: P1203775 | |||||
SCORE 100 Electrical Date: August 13, 2015 Contractor: Ralph Threatt Client: Henry P Van Dyck | Permit status: Permit issued | Permit id: E1508382 | |||||
Plumbing and gas Date: September 11, 2015 Client: Henry P Van Dyck | Permit status: Permit issued | Permit id: P1508992 | |||||
SCORE 56 Hang an outdoor vinyl advertising banner using a rope to attach it to the building structure. Will not drill or alter building for mounting, but will use a non-altering or damaging method by tying ropes to the banner. Date: May 8, 2014 Contractor: Power None Client: World Mission Society Church Of God | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400263 | |||||
SCORE 56 Plumbing and gas Date: March 14, 2012 Contractor: Talbert Dowling Talbert Dowling Ralph E Jackson Client: World Mission Society, Inc | Permit status: Completed | Permit id: P1203775 | |||||
SCORE 61 Brick re-pointing. All mortar will be removed by hand. Mortar to be replaced with brick-lok standard light grey/beige mortar. Replace basement windows only. Windows will be replaced in kind with like material clear glass windows. Date: August 3, 2012 Contractor: World Mission Society Inc Gerald Roper Client: World Mission Society Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1212288 | |||||
SCORE 61 Interior renovation of existing place of worship. Renovate basment including new interior walls, bathrooms and baptisery. Renovate first floor and mezz level with new paint, hardwood floors, lighting. Renovate altar. Repaint trim. Remove and replace existing conrcrete or brick walkways in kind w/ same material. Existing hvac to remain. Date: March 2, 2012 Contractor: World Mission Society Inc Gerald Roper Client: World Mission Society Inc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1205033 | |||||
SCORE 61 Install two new beams and three new columns per plan. Date: April 18, 2012 Contractor: World Mission Society Inc Gerald Roper Client: World Mission Society Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1207702 | |||||
SCORE 56 Interior demolition of non structural entities including: partitions, finishes, drywall, cabinetry, kitchen and bathroom fixtures, carpet, tile and interior doors. No structural demo or structural work. Repair existing roof. No sturctural changes to roof, repair only. Re-use existing slate shingles. No exterior door/window changes as per hpo stamped plans. Date: January 5, 2012 Contractor: Alex Post Gerald Roper Client: Alex Post | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200243 | |||||
Electrical Date: March 14, 2012 Client: World Mission Society, Inc | Permit status: Completed | Permit id: E1204275 | |||||
SCORE 100 Plumbing and gas Date: September 11, 2015 Contractor: Jerone Scott Client: Henry P Van Dyck | Permit status: Permit issued | Permit id: P1508992 | |||||
SCORE 69 Replace 3 existing full glass double doors on the front and side of building. The old doors are in poor shape and have broken glass, leaking, etc. The new doors will be the same style as the old ones with one difference: the new doors might be white or bronze color aluminum instead of silver aluminum. Besides the color of the frame, the new doors are the same as the existing doors in style, location, size, opening, glass. Date: May 8, 2013 Contractor: Alex Post Client: World Mission Society Church Of God | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1306617 | |||||
SCORE 98 Replace broken portions of two stained-glass rose windows in church. One will have only the central oculus replaced to match the original. The other will have the central oculus, two lobes and two wedge pieces reproduced to match the original and one lobe repaired and reinstalled. No modifications or alterations of other windows. Existing windows. Date: May 6, 2014 Contractor: John Power Client: World Mission Society, Inc, Church Of God | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1407085 | |||||
SCORE 56 Hang an outdoor vinyl advertising banner using a rope to attach it to the building structure. Will not drill or alter building for mounting, but will use a non-altering or damaging method by tying ropes to the banner. Date: May 8, 2014 Contractor: Power; None Client: World Mission Society Church Of God | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1400263 | |||||
SCORE 99 Flat roof repair some areas are leaking non- structural Date: October 28, 2014 Contractor: Michael Harris Client: Michael Harris | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1500975 | |||||
SCORE 61 Install two new beams and three new columns per plan. Date: April 18, 2012 Contractor: World Mission Society Inc; Gerald Roper Client: World Mission Society Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1207702 | |||||
Electrical Date: March 14, 2012 Client: World Mission Society, Inc | Permit status: Completed | Permit id: E1204275 | |||||
SCORE 59 Plumbing and gas Date: March 14, 2012 Client: World Mission Society, Inc | Permit status: Completed | Permit id: P1203775 | |||||
SCORE 56 Hanging sign Date: August 12, 2015 Contractor: Phillip World Mission Society; Adams Client: World Mission Society, Inc, Church Of God | Permit type: Sign | Permit status: Permit issued | Permit id: Sg1500389 | |||||
SCORE 93 Build a 2nd floor bedroom ontop of existing 1 story structure Date: August 5, 2015 Contractor: Gay Hardwick Client: Henry Van Dyck | Permit type: Addition | Permit status: Permit issued | Permit id: B1507867 | |||||
SCORE 100 Electrical Date: August 13, 2015 Contractor: Ralph Threatt Client: Henry P Van Dyck | Permit status: Permit issued | Permit id: E1508382 | |||||
SCORE 100 Plumbing and gas Date: September 11, 2015 Contractor: Jerone Scott Client: Henry P Van Dyck | Permit status: Permit issued | Permit id: P1508992 | |||||
SCORE 61 Interior renovation of existing place of worship. Renovate basment including new interior walls, bathrooms and baptisery. Renovate first floor and mezz level with new paint, hardwood floors, lighting. Renovate altar. Repaint trim. Remove and replace existing conrcrete or brick walkways in kind w/ same material. Existing hvac to remain. Date: March 2, 2012 Contractor: World Mission Society Inc; Gerald Roper Client: World Mission Society Inc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1205033 | |||||
SCORE 61 Brick re-pointing. All mortar will be removed by hand. Mortar to be replaced with brick-lok standard light grey/beige mortar. Replace basement windows only. Windows will be replaced in kind with like material clear glass windows. Date: August 3, 2012 Contractor: World Mission Society Inc; Gerald Roper Client: World Mission Society Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1212288 | |||||
SCORE 56 Interior demolition of non structural entities including: partitions, finishes, drywall, cabinetry, kitchen and bathroom fixtures, carpet, tile and interior doors. No structural demo or structural work. Repair existing roof. No sturctural changes to roof, repair only. Re-use existing slate shingles. No exterior door/window changes as per hpo stamped plans. Date: January 5, 2012 Contractor: Alex Post; Gerald Roper Client: Alex Post | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200243 |