Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Using hollow stem auger method, we will drill a geotechnical soil boring for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Date: January 3, 2017 Contractor: Geoconcepts Engineering, Inc Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 30, 2017 | |||||
SCORE 96 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Date: January 3, 2017 Contractor: Geoconcepts Engineering, Inc Permit type: Excavation; boring test pit (single) | Permit status: Resubmitted | Expiration date: April 30, 2017 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: July 8, 2012 | Permit id: 0 | |||||
SCORE 96 Excavation; boring test pit (single) Contractor: Geoconcepts Engineering, Inc Permit status: 1 | Expiration date: August 14, 2017 | Permit id: 0 | |||||
SCORE 95 Manhole access 11 days Date: February 9, 2011 Contractor: Pepco Phi Holdings, Inc Permit status: Expired | Expiration date: February 19, 2011 | Permit id: Pa10020711 | |||||
SCORE 96 Excavation; boring test pit (single) Date: April 21, 2017 Contractor: Geoconcepts Engineering, Inc Permit status: 8 | Expiration date: June 15, 2017 | Permit id: Pa198736 | |||||
SCORE 100 Enp for ddot contractors Date: August 9, 2016 Contractor: Fort Myer Construction Corp Permit status: Expired | Expiration date: August 11, 2016 | Permit id: Pa10330238 | |||||
SCORE 80 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Date: April 21, 2017 Contractor: Katherine Fordney Permit status: Permit expired | Expiration date: June 15, 2017 | Permit id: Pa198736 | |||||
SCORE 80 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Contractor: Katherine Fordney Permit status: Approved (pending payment | Expiration date: August 14, 2017 | Permit id: 0 | |||||
SCORE 96 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Date: June 12, 2017 Contractor: Geoconcepts Engineering, Inc Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 14, 2017 | Permit id: Pa198736-R1 | |||||
SCORE 95 Manhole access 11 days Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: July 8, 2012 | Permit id: 0 | |||||
SCORE 79 Construction staging area Date: May 15, 2017 Contractor: Geoconcepts Engineering Permit status: Permit expired | Expiration date: June 30, 2017 | Permit id: Pa10395089 | |||||
SCORE 56 Moving storage container Date: May 3, 2017 Contractor: Stacey Fitzgerald Permit status: Permit expired | Expiration date: May 9, 2017 | Permit id: Pa10397971 |