Content |
---|
SCORE 82 Equipment work ![]() ![]() Permit status: Permit issued | Permit id: 34020447902 |
SCORE 86 Equipment work ![]() ![]() Permit status: Permit issued | Permit id: 34020447901 |
SCORE 100 Plumbing ![]() ![]() Permit status: Permit issued | Permit id: 34020447901 |
As per rc # 2012143636408 (newyork environmental systems), perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules ![]() Permit type: Asbest | Permit id: Ee17460 |
Adjust the drop ladders to the front and rear fire escapes and make necessary repairs so that both will slide easily in the guide rails. Ensure that b ![]() Permit type: Gc | Permit id: Ee19976 |
Perform asbestos project monitoring, air sampling and analysis in accordance with hpd specification for the above address in the basement; 34 l. Ft. O ![]() Permit type: Asbest | Permit id: Ee17468 |
As per mini rc # 2014000129203 (eas) and hpd specification, perform transmission electron microscopy (tem) analysis of 02 samples for asbestos content ![]() Permit type: Asbest | Permit id: Ee18595 |
Note: 1. Job to commence only after a sidewalk bridge is installed. 2. Vendor must have a riggers license. 1) demo parapet wall on east exterior wa ![]() Permit type: Gc | Permit id: Ee14377 |
As per mini rc # 2014000129203 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 5 samples for asbestos content util ![]() Permit type: Asbest | Permit id: Ee16859 |
As per mini rc # 2014000129203 (eas), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification of 2 n ![]() Permit type: Asbest | Permit id: Ee16862 |