Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Solar photo voltaic - 28 module 2 inverter 4. 3 kw roof mounted pv system. Pv system is not to extend more than 5 above the highest point of existing roof. Date: April 21, 2005 Contractor: Heliopower Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 183-082-44-00 | |||||
SCORE 88 Septic to sewer connection for (e) sfd Date: July 8, 2016 Contractor: Draves Pipeline Incorporated Permit type: Plumbing only | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 1, 2016 Contractor: Solarscape Artistry Inc Permit type: Res roof mt solar pv | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Solar photo voltaic - 28 module 2 inverter 4. 3 kw roof mounted pv system. Pv system is not to extend more than 5 above the highest point of existing roof. Date: April 21, 2005 Contractor: Heliopower Inc Permit type: Electrical only | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 1830824400 |