Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Septic to sewer connection for (e) sfd Date: July 8, 2016 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 1, 2016 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 88 Septic to sewer connection for (e) sfd Date: July 8, 2016 Contractor: Draves Pipeline Incorporated Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: March 1, 2016 Contractor: Solarscape Artistry Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Final Date: April 11, 2016 Permit status: Cancel | Permit id: Pds2016-Resalt- | |||||
Final Date: April 22, 2005 Permit status: Pass | Permit id: Pds2005-1030-20 |