Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 67 New channel letters with company logo to match existing channel letters for other businesses already in the building. Permit id: Mulcom20111316 | |||||
SCORE 89 Red mango. Interior restaurant tenant finish- misc wiring for tenant bld out (tenant work) Date: March 23, 2011 Contractor: Colver, Robert Client: Hornick, Paul | Permit id: Elect20111051 | |||||
SCORE 100 New illuminated, channel letters Date: October 27, 2008 Contractor: Doyle Signs, Inc Client: First Rockford Group | Permit id: Mulcom20081025 | |||||
SCORE 89 (electrical) "josephs pearl" suite #136. Expansion into next tenant space. (1) 1 amp feeder, (1) cooler, (1) rtu. Per plan review #09-0301. Expansion of existing restaurant. Date: April 15, 2009 Contractor: Colver, Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20091106 | |||||
SCORE 93 6 x 8 self-contained walk-in coolerfluid cooler on roof Client: Hornick, Paul | Permit id: Mech20111263 | |||||
Installation of 3 11 3/4" by 12 5 1/4" = square feet wall sign for pearl restaurant Date: October 27, 2008 Permit id: Mulcom20081027 | |||||
New illuminated, channel letters Date: October 27, 2008 Client: First Rockford Group | Permit id: Mulcom20081025 | |||||
New business identification sign to front elevation, illuminated flat letter Date: December 18, 2008 Permit id: Mulcom20081116 | |||||
Plan review #09-0301. Expansion of existing restaurant. Date: March 17, 2009 Value: $27,000 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20091112 | |||||
Plan review #09-0301. Expansion of existing restaurant. Gas piping Date: April 1, 2009 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20091258 | |||||
Plan review #09-0301. Expansion of existing restaurant. 1 wc, 1 lav, 2 fd Date: April 1, 2009 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20091125 | |||||
(electrical) "josephs pearl" suite #136. Expansion into next tenant space. (1) 1 amp feeder, (1) cooler, (1) rtu. Per plan review #09-0301. Expansion of existing restaurant. Date: April 15, 2009 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20091106 | |||||
4 ton rtu, 75 cfm exhaust fan, misc ductwork Date: April 20, 2009 Value: $10,500 Client: Josephs Pearl | Permit id: Mech20091462 | |||||
Office buildout - suite 114. Office space buildout. Plan review #09-1002. 2 wc, 2 lav, 1 ks,1 msink, 3 flr drains, 1 rpz Date: October 15, 2009 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20091749 | |||||
Office buildout - suite 114. Office space buildout. Plan review #09-1002. Gas piping Date: October 15, 2009 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20092251 | |||||
Office buildout - suite 114. Office space buildout. Plan review #09-1002. Date: October 20, 2009 Value: $72,000 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20091715 | |||||
(electrical) "office buildout - suite 114" - (2) rtus. Plan review #09-1002. Date: November 3, 2009 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20091757 | |||||
Installation of (1) set of illuminated channel letters and logo to be installed on the front building elevation Date: May 7, 2010 Value: $5,000 Client: United Capitol | Permit id: Mulcom20101284 | |||||
Brichi coiffure. Hair and nail salon buildout. Building plan review 10-0518. Date: June 11, 2010 Value: $48,500 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20101338 | |||||
(electrical) "brichi coiffure" - hair/nail salon buildout. (1) 2 amp feeder and t lights. Ref plan review #10-0518. Date: June 28, 2010 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20101386 | |||||
115 btu Date: June 29, 2010 Value: $1,900 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20101671 | |||||
(1) wc, (1) lav, (1) wb, (1) 1" rpz, (3) hs, (1) ms, (3) fd, (1) gal elec wh, (4) hair sink, (2) pedi tubswsfu # - 17 Date: June 29, 2010 Value: $15,700 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20101498 | |||||
SCORE 89 Brichi coiffure. Hair and nail salon buildout. Building plan review 10-0518. Date: July 19, 2010 Contractor: Nelson Fire Protection Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20101499 | |||||
5 ton, 1 btu rtuductowrk, 6 cfm ex 24 hour notice not provided by contractor Date: July 27, 2010 Value: $7,000 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20101672 | |||||
30" x 140" wall mounted banner Date: August 6, 2010 Permit id: Mulcom20101582 | |||||
SCORE 89 Install (1) set of led 18" channel letters on wall front above awnings - electrical required Permit id: Elect20101660 | |||||
SCORE 89 Install (1) set of led 18" channel letters on wall front above awnings - electrical required Permit id: Mulcom20101636 | |||||
Install conc. Floor slab, steel studs from slab to underside of roof deck and install pair 30" x70" aluminum doors. Tenant to finish out balance of space. Suite 118. Pr#11-0104 Date: February 3, 2011 Value: $9,300 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111032 | |||||
(2) wc, (1) urinal, (2) lav, (4) ksink, (1) 3 comp, (1) handsink, (1) mopsink, (8) fd, (1) gal 24 kw wtrhtr Date: March 14, 2011 Value: $31,300 Client: Hornick, Paul | Permit id: Plum20111102 | |||||
SCORE 95 Plan rev. 11-02-04. Red mango. Interior restaurant tenant finish-out including partitions, electrical, plumbing, mechanical, finishes, equipment, etc. Client: Hornick, Paul | Permit id: Mulcom20111081 | |||||
1 1/4" backflowinstall water line from riser rooom to ste 118 Date: March 14, 2011 Value: $2,620 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111030 | |||||
(2) wc, (2) lav, (1) ksink, (1) msink, (2) fd, 1" backflow Date: March 15, 2011 Value: $11,000 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111204 | |||||
First step mortgage. Building plan review #11-0304 new office build-out in shell building. Work includes: office space, 2 restrooms with one lav and one water closet each, a break area with sink, a service sink, new lighting & ductwork. Date: March 15, 2011 Value: $89,000 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111132 | |||||
2 btu to (1) rtu Date: March 18, 2011 Value: $900 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20111348 | |||||
2 ton, 13 seer, 24 btu split system Date: March 21, 2011 Value: $12,300 Client: Hornick, Paul | Permit id: Mech20111170 | |||||
Red mango. Interior restaurant tenant finish- misc wiring for tenant bld out (tenant work) Date: March 23, 2011 Client: Hornick, Paul | Permit id: Elect20111051 | |||||
Red mango - landlord work - 2 panels and service Date: March 23, 2011 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111011 | |||||
First step mortgage. New office build-out in shell building. Misc wiring for tenant build out - existing panel Date: March 23, 2011 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111103 | |||||
8. 5 ton, 2 btu - rtuductwork(5) cfm ex Date: March 28, 2011 Value: $25,000 Permit id: Mech20111532 | |||||
6 x 8 self-contained walk-in coolerfluid cooler on roof Date: April 13, 2011 Value: $4,500 Client: Hornick, Paul | Permit id: Mech20111263 | |||||
2 x 12 illuminated business identification wall mounted sign Date: April 29, 2011 Value: $1,500 Permit id: Mulcom20111255 | |||||
New channel letters with company logo to match existing channel letters for other businesses already in the building. Date: May 19, 2011 Value: $5,700 Permit id: Mulcom20111316 | |||||
SCORE 89 First step mortgage. Fire sprinkler system 33 heads Date: May 25, 2011 Contractor: Nelson Fire Protection Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111205 | |||||
SCORE 89 Red mango. Sprinkler system 11 heads Date: May 25, 2011 Contractor: Nelson Fire Protection Client: Hornick, Paul | Permit id: Plum20111213 | |||||
Temporary banner (now open) Date: June 6, 2011 Value: $400 Permit id: Mulcom20111349 | |||||
Landlord work for a new cosmetic retail store to sell skin care products. Buildout in existing building shell. Permit by appointment. Building plan review #11-1001. Work includes... Bathroom, gas piping, plumbing, electrical and building. Date: October 12, 2011 Value: $35,000 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111925 | |||||
Landlord work for a new cosmetic retail store to sell skin care products. 1 electric water heater - 6 gal. - 1 water closet - 1 lavatory - 1 hand sink - 1 mop sink - 1 floor drains child permit Date: October 13, 2011 Value: $7,450 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111987 | |||||
SCORE 100 New 41" x 156" illuminated wall mounted letters for business identification on the south wall. Permit id: Mulcom20111968 | |||||
42 soace 2 amp panel. Rooftop for a/clandlord work for a new cosmetic retail store to sell skin care products. Buildout in existing building shell. Permit by appointment. Building plan review #11-1001. Work includes... Bathroom, gas piping, plumbing, electrical and building. Date: October 27, 2011 Value: $7,000 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111656 | |||||
Landlord work for a new cosmetic retail store to sell skin care products. Ductwork - exhaust 75 cfm child permit Date: November 1, 2011 Value: $4,830 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20112388 | |||||
SCORE 89 Plan review #09-0301. Expansion of existing restaurant. Gas piping Date: April 1, 2009 Contractor: Ferro, Daniel Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20091258 | |||||
SCORE 89 (electrical) "office buildout - suite 114" - (2) rtus. Plan review #09-1002. Date: November 3, 2009 Contractor: Colver Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20091757 | |||||
SCORE 89 Red mango - landlord work - 2 panels and service Date: March 23, 2011 Contractor: Colver Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111011 | |||||
SCORE 56 (electrical) "brichi coiffure" - hair/nail salon buildout. (1) 2 amp feeder and t lights. Ref plan review #10-0518. Date: June 28, 2010 Contractor: Manrod Richard Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20101386 | |||||
SCORE 89 42 soace 2 amp panel. Rooftop for a/clandlord work for a new cosmetic retail store to sell skin care products. Buildout in existing building shell. Permit by appointment. Building plan review #11-1001. Work includes... Bathroom, gas piping, plumbing, electrical and building. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111656 | |||||
SCORE 89 115 btu Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20101671 | |||||
SCORE 89 (electrical) "josephs pearl" suite #136. Expansion into next tenant space. (1) 1 amp feeder, (1) cooler, (1) rtu. Per plan review #09-0301. Expansion of existing restaurant. Date: April 15, 2009 Contractor: Colver Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20091106 | |||||
SCORE 96 Office buildout - suite 114. Office space buildout. Plan review #09-1002. Gas piping Date: October 15, 2009 Contractor: Buckner Mark Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20092251 | |||||
SCORE 96 4 ton rtu, 75 cfm exhaust fan, misc ductwork Client: Josephs Pearl | Permit id: Mech20091462 | |||||
SCORE 93 5 ton, 1 btu rtuductowrk, 6 cfm ex 24 hour notice not provided by contractor Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20101672 | |||||
SCORE 93 8. 5 ton, 2 btu - rtuductwork(5) cfm ex Permit id: Mech20111532 | |||||
SCORE 96 2 ton, 13 seer, 24 btu split system Client: Hornick, Paul | Permit id: Mech20111170 | |||||
SCORE 89 Plan review #09-0301. Expansion of existing restaurant. Gas piping Date: April 1, 2009 Contractor: Ferro Daniel Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20091258 | |||||
SCORE 89 2 btu to (1) rtu Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20111348 | |||||
SCORE 88 Installation of 3 11 3/4" by 12 5 1/4" = square feet wall sign for pearl restaurant Date: October 27, 2008 Contractor: Doyle Signs Inc. Lisa Neal Permit id: Mulcom20081027 | |||||
SCORE 93 Plan review #09-0301. Expansion of existing restaurant. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20091112 | |||||
SCORE 100 New illuminated, channel letters Date: October 27, 2008 Contractor: Doyle Signs Inc Client: First Rockford Group | Permit id: Mulcom20081025 | |||||
SCORE 93 Brichi coiffure. Hair and nail salon buildout. Building plan review 10-0518. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20101338 | |||||
SCORE 93 30" x 140" wall mounted banner Date: August 6, 2010 Contractor: Image Signs Tony Stanley Permit id: Mulcom20101582 | |||||
SCORE 93 Install conc. Floor slab, steel studs from slab to underside of roof deck and install pair 30" x70" aluminum doors. Tenant to finish out balance of space. Suite 118. Pr#11-0104 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111032 | |||||
SCORE 93 Office buildout - suite 114. Office space buildout. Plan review #09-1002. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20091715 | |||||
SCORE 67 New channel letters with company logo to match existing channel letters for other businesses already in the building. Permit id: Mulcom20111316 | |||||
SCORE 93 2 x 12 illuminated business identification wall mounted sign Permit id: Mulcom20111255 | |||||
SCORE 93 Landlord work for a new cosmetic retail store to sell skin care products. Buildout in existing building shell. Permit by appointment. Building plan review #11-1001. Work includes... Bathroom, gas piping, plumbing, electrical and building. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111925 | |||||
SCORE 96 Plan review #09-0301. Expansion of existing restaurant. 1 wc, 1 lav, 2 fd Date: April 1, 2009 Contractor: Johnson Paul Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20091125 | |||||
SCORE 96 Office buildout - suite 114. Office space buildout. Plan review #09-1002. 2 wc, 2 lav, 1 ks,1 msink, 3 flr drains, 1 rpz Date: October 15, 2009 Contractor: Johnson Paul Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20091749 | |||||
SCORE 93 (2) wc, (1) urinal, (2) lav, (4) ksink, (1) 3 comp, (1) handsink, (1) mopsink, (8) fd, (1) gal 24 kw wtrhtr Client: Hornick, Paul | Permit id: Plum20111102 | |||||
SCORE 96 (2) wc, (2) lav, (1) ksink, (1) msink, (2) fd, 1" backflow Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111204 | |||||
SCORE 96 1 1/4" backflowinstall water line from riser rooom to ste 118 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111030 | |||||
SCORE 96 (1) wc, (1) lav, (1) wb, (1) 1" rpz, (3) hs, (1) ms, (3) fd, (1) gal elec wh, (4) hair sink, (2) pedi tubswsfu # - 17 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20101498 | |||||
SCORE 96 Landlord work for a new cosmetic retail store to sell skin care products. 1 electric water heater - 6 gal. - 1 water closet - 1 lavatory - 1 hand sink - 1 mop sink - 1 floor drains child permit Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111987 | |||||
SCORE 88 Installation of (1) set of illuminated channel letters and logo to be installed on the front building elevation Client: United Capitol | Permit id: Mulcom20101284 | |||||
SCORE 89 First step mortgage. New office build-out in shell building. Misc wiring for tenant build out - existing panel Date: March 23, 2011 Contractor: Colver Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111103 | |||||
SCORE 93 First step mortgage. Building plan review #11-0304 new office build-out in shell building. Work includes: office space, 2 restrooms with one lav and one water closet each, a break area with sink, a service sink, new lighting & ductwork. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111132 | |||||
SCORE 93 6 x 8 self-contained walk-in coolerfluid cooler on roof Client: Hornick, Paul | Permit id: Mech20111263 | |||||
SCORE 96 Landlord work for a new cosmetic retail store to sell skin care products. Ductwork - exhaust 75 cfm child permit Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20112388 | |||||
SCORE 89 Red mango. Interior restaurant tenant finish- misc wiring for tenant bld out (tenant work) Date: March 23, 2011 Contractor: Colver Robert Client: Hornick, Paul | Permit id: Elect20111051 | |||||
SCORE 78 Temporary banner (now open) Permit id: Mulcom20111349 | |||||
SCORE 100 New business identification sign to front elevation, illuminated flat letter Date: December 18, 2008 Contractor: Doyle Signs Inc Permit id: Mulcom20081116 | |||||
SCORE 96 Landlord work for a new cosmetic retail store to sell skin care products. Ductwork - exhaust 75 cfm child permit Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20112388 | |||||
SCORE 93 (2) wc, (1) urinal, (2) lav, (4) ksink, (1) 3 comp, (1) handsink, (1) mopsink, (8) fd, (1) gal 24 kw wtrhtr Client: Hornick, Paul | Permit id: Plum20111102 | |||||
SCORE 93 Office buildout - suite 114. Office space buildout. Plan review #09-1002. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20091715 | |||||
SCORE 93 Plan review #09-0301. Expansion of existing restaurant. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20091112 | |||||
SCORE 89 Install (1) set of led 18" channel letters on wall front above awnings - electrical required Permit id: Mulcom20101636 | |||||
SCORE 89 Red mango. Sprinkler system 11 heads Date: May 25, 2011 Contractor: Nelson Fire Protection Client: Hornick, Paul | Permit id: Plum20111213 | |||||
SCORE 100 New business identification sign to front elevation, illuminated flat letter Date: December 18, 2008 Contractor: Doyle Signs, Inc Permit id: Mulcom20081116 | |||||
SCORE 89 Brichi coiffure. Hair and nail salon buildout. Building plan review 10-0518. Date: July 19, 2010 Contractor: Nelson Fire Protection Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20101499 | |||||
SCORE 93 Brichi coiffure. Hair and nail salon buildout. Building plan review 10-0518. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20101338 | |||||
SCORE 93 30" x 140" wall mounted banner Date: August 6, 2010 Contractor: Image Signs, Tony Stanley Permit id: Mulcom20101582 | |||||
SCORE 99 (1) wc, (1) lav, (1) wb, (1) 1" rpz, (3) hs, (1) ms, (3) fd, (1) gal elec wh, (4) hair sink, (2) pedi tubswsfu # - 17 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20101498 | |||||
SCORE 89 (electrical) "office buildout - suite 114" - (2) rtus. Plan review #09-1002. Date: November 3, 2009 Contractor: Colver, Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20091757 | |||||
SCORE 96 Office buildout - suite 114. Office space buildout. Plan review #09-1002. Gas piping Date: October 15, 2009 Contractor: Buckner, Mark Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20092251 | |||||
SCORE 96 4 ton rtu, 75 cfm exhaust fan, misc ductwork Client: Josephs Pearl | Permit id: Mech20091462 | |||||
SCORE 93 2 x 12 illuminated business identification wall mounted sign Permit id: Mulcom20111255 | |||||
SCORE 93 Landlord work for a new cosmetic retail store to sell skin care products. Buildout in existing building shell. Permit by appointment. Building plan review #11-1001. Work includes... Bathroom, gas piping, plumbing, electrical and building. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111925 | |||||
SCORE 89 First step mortgage. New office build-out in shell building. Misc wiring for tenant build out - existing panel Date: March 23, 2011 Contractor: Colver, Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111103 | |||||
SCORE 99 Office buildout - suite 114. Office space buildout. Plan review #09-1002. 2 wc, 2 lav, 1 ks,1 msink, 3 flr drains, 1 rpz Date: October 15, 2009 Contractor: Johnson, Paul Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20091749 | |||||
SCORE 99 1 1 4" backflowinstall water line from riser rooom to ste 118 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111030 | |||||
SCORE 89 115 btu Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20101671 | |||||
SCORE 93 First step mortgage. Building plan review #11-0304 new office build-out in shell building. Work includes: office space, 2 restrooms with one lav and one water closet each, a break area with sink, a service sink, new lighting & ductwork. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111132 | |||||
SCORE 93 Install conc. Floor slab, steel studs from slab to underside of roof deck and install pair 30" x70" aluminum doors. Tenant to finish out balance of space. Suite 118. Pr#11-0104 Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mulcom20111032 | |||||
SCORE 89 Install (1) set of led 18" channel letters on wall front above awnings - electrical required Permit id: Elect20101660 | |||||
SCORE 99 Landlord work for a new cosmetic retail store to sell skin care products. 1 electric water heater - 6 gal. - 1 water closet - 1 lavatory - 1 hand sink - 1 mop sink - 1 floor drains child permit Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111987 | |||||
SCORE 88 Installation of 3 11 3 4" by 12 5 1 4" = square feet wall sign for pearl restaurant Date: October 27, 2008 Contractor: Doyle Signs Inc., Lisa Neal Permit id: Mulcom20081027 | |||||
SCORE 78 Temporary banner (now open) Permit id: Mulcom20111349 | |||||
SCORE 93 5 ton, 1 btu rtuductowrk, 6 cfm ex 24 hour notice not provided by contractor Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20101672 | |||||
SCORE 93 8. 5 ton, 2 btu - rtuductwork(5) cfm ex Permit id: Mech20111532 | |||||
SCORE 96 2 ton, 13 seer, 24 btu split system Client: Hornick, Paul | Permit id: Mech20111170 | |||||
SCORE 89 2 btu to (1) rtu Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Mech20111348 | |||||
SCORE 89 42 soace 2 amp panel. Rooftop for a clandlord work for a new cosmetic retail store to sell skin care products. Buildout in existing building shell. Permit by appointment. Building plan review #11-1001. Work includes... Bathroom, gas piping, plumbing, electrical and building. Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111656 | |||||
SCORE 89 First step mortgage. Fire sprinkler system 33 heads Date: May 25, 2011 Contractor: Nelson Fire Protection Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111205 | |||||
SCORE 99 Plan review #09-0301. Expansion of existing restaurant. 1 wc, 1 lav, 2 fd Date: April 1, 2009 Contractor: Johnson, Paul Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20091125 | |||||
SCORE 89 Red mango - landlord work - 2 panels and service Date: March 23, 2011 Contractor: Colver, Robert Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20111011 | |||||
SCORE 56 (electrical) "brichi coiffure" - hair nail salon buildout. (1) 2 amp feeder and t lights. Ref plan review #10-0518. Date: June 28, 2010 Contractor: Manrod, Richard Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Elect20101386 | |||||
SCORE 88 Installation of (1) set of illuminated channel letters and logo to be installed on the front building elevation Client: United Capitol | Permit id: Mulcom20101284 | |||||
SCORE 99 (2) wc, (2) lav, (1) ksink, (1) msink, (2) fd, 1" backflow Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111204 | |||||
SCORE 89 Install (1) set of led 18" channel letters on wall front above awnings - electrical required Permit id: Elect20101660 | |||||
SCORE 100 New illuminated, channel letters Date: October 27, 2008 Contractor: Doyle Signs, Inc Client: First Rockford Group | Permit id: Mulcom20081025 | |||||
SCORE 89 Red mango. Sprinkler system 11 heads Date: May 25, 2011 Contractor: Nelson Fire Protection Client: Hornick, Paul | Permit id: Plum20111213 | |||||
SCORE 89 Install (1) set of led 18" channel letters on wall front above awnings - electrical required Permit id: Mulcom20101636 | |||||
SCORE 89 First step mortgage. Fire sprinkler system 33 heads Date: May 25, 2011 Contractor: Nelson Fire Protection Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20111205 | |||||
SCORE 89 Brichi coiffure. Hair and nail salon buildout. Building plan review 10-0518. Date: July 19, 2010 Contractor: Nelson Fire Protection Client: Sunil Federal, Llc, Sunil Federal, Llc | Permit id: Plum20101499 | |||||
SCORE 100 New business identification sign to front elevation, illuminated flat letter Date: December 18, 2008 Contractor: Doyle Signs, Inc Permit id: Mulcom20081116 |