Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Repair sewer service from house to main. In easement Date: December 2, 2009 Contractor: Pipeline Industries Inc Client: Authority Housing | Applicant: Pipeline Industries, Inc | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 59 Electrical permit for installation of outlets for radon mitigation fans. Date: March 16, 2010 Contractor: Singletrack Electric Client: Authority Housing | Applicant: Singletrack Electric | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwe | |||||
SCORE 95 Replacement of four, second story decks, two types as and two type bs. Client: Authority Housing | Applicant: Palace Construction Co Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 10, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 Electrical service change for amp service on duplex and replace existing panel. Date: April 14, 2011 Contractor: Crystal Electric Inc Client: Authority Housing | Applicant: Crystal Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family a | |||||
SCORE 95 Replacement forced air furnace and 1. 5 ton a c in unit 104 Date: June 17, 2011 Contractor: Welzig Mechanical Client: Authority Housing | Applicant: Welzig Mechanical | Permit type: Mechanical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Multifamily dwe | |||||
SCORE 95 Building 18 -- on an existing multi-family dwelling unit, removal of existing exterior stairway components (railing, treads and risers) -- stringers to remain. Install replacement perforated metal treads, compliant guardrails and compliant handrails. Dimensions of stairway (riser hight, tread run,and width) to remain unchanged. Applicant: Palace Construction Co Inc | Permit type: Building | Permit status: Cmp | Completion date: April 18, 2012 | Current use: Multifamily dwe | |||||
SCORE 79 Building eighteen at the bridgewalk complex -- installation of eight disconnects, associated wiring and circuit breakers for proposed a c units in this eight-plex. Installation of eight a c units by separate mechanical permit. Date: December 8, 2011 Contractor: Colorado Mountain Electric Applicant: Colorado Mountain Electric | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwe | |||||
SCORE 100 Install new 3. 24 kw solar array on an existing structure. Panels to be flush mount. Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 New 1. 5inch wilkenfoots backflow preventor for walden cir building 18 Date: February 13, 2012 Contractor: Integrated Safety Services Client: Authority Housing | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwe | |||||
SCORE 82 Building eighteen -- installation of seven standard replacement forced-air furnaces in this building and seven new a c units (13 seer minimum) (building eighteen of the bridgewalk complex) each furnace to be 60,000. Units 101, 102, 103, 201, 202, 203 and 204. Electrical by separate permit. Date: March 7, 2012 Contractor: Golden Way Mechanical Inc Client: Authority Housing | Applicant: Golden Way Mechanical Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2012 | Current use: Multifamily dwe | |||||
SCORE 82 Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch. Date: April 3, 2012 Contractor: L H L Contractors Applicant: L H L Contractors | Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Multifamily dwe | |||||
SCORE 95 Repair sewer service from house to main. In easement Date: December 2, 2009 Contractor: Pipeline Industries, Inc Client: Authority Housing | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2009-04912 | |||||
SCORE 95 New 1. 5inch wilkenfoots backflow preventor for walden cir building 18 Client: Authority Housing | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00539 | |||||
SCORE 82 Building eighteen -- installation of seven standard replacement forced-air furnaces in this building and seven new a c units (13 seer minimum) (building eighteen of the bridgewalk complex) each furnace to be 60,000. Units 101, 102, 103, 201, 202, 203 and 204. Electrical by separate permit. Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00945 | |||||
SCORE 82 Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch. Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-01499 | |||||
SCORE 59 Electrical permit for installation of outlets for radon mitigation fans. Client: Authority Housing | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-00951 | |||||
SCORE 95 Replacement of four, second story decks, two types as and two type bs. Client: Authority Housing | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 10, 2010 | Current use: Multifamily dwellings, existing, deck, n | Permit id: Pmt2010-02285 | |||||
SCORE 100 Electrical service change for amp service on duplex and replace existing panel. Client: Authority Housing | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-01445 | |||||
SCORE 95 Replacement forced air furnace and 1. 5 ton a c in unit 104 Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-02533 | |||||
SCORE 95 Building 18 -- on an existing multi-family dwelling unit, removal of existing exterior stairway components (railing, treads and risers) -- stringers to remain. Install replacement perforated metal treads, compliant guardrails and compliant handrails. Dimensions of stairway (riser hight, tread run,and width) to remain unchanged. Permit type: Building | Permit status: Cmp | Completion date: April 18, 2012 | Current use: Multifamily dwellings, repair | Permit id: Pmt2011-04674 | |||||
SCORE 79 Building eighteen at the bridgewalk complex -- installation of eight disconnects, associated wiring and circuit breakers for proposed a c units in this eight-plex. Installation of eight a c units by separate mechanical permit. Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05354 | |||||
SCORE 100 Install new 3. 24 kw solar array on an existing structure. Panels to be flush mount. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05540 |