Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Master bath remodel on 2nd floor, including new tile, plumbing, and electrical fixtures. No exterior work Parcel: 630 0003a | |||||
SCORE 96 Remove existing roofing and install certainteed lifetime asphalt shingle with all required accessories. Parcel: 630 0003a |