Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 Building renovations single-family dwelling Date: April 30, 2001 Contractor: Catherine Martinez Client: Martinez J, Ronald S | Permit id: B01002221 | |||||
SCORE 59 Building addition (less than 50% new) single-family dwelling addition to existing 22 sfd home 8 sf,kitchen,den to the first floor,bath, bedroom to the second level as per plans . Date: May 8, 2001 Contractor: Catherine Martinez Client: Martinez J, Ronald S | Permit id: B01002224 | |||||
SCORE 98 Electrical construction loop single-family dwelling elbred malone Date: June 15, 2001 Contractor: Elbred Malone Client: Martinez J, Ronald S | Permit id: E01004496 | |||||
SCORE 98 Electrical rewiring single-family dwelling elbred malone Date: October 24, 2001 Contractor: Elbred Malone Client: Martinez J, Ronald S | Permit id: E01007964 | |||||
SCORE 72 Install mechanical equipment single-family dwelling install 4-ton ,3-ton system and 2-gas warm air furnace. Kenneth zimmer - 279-56 Date: December 26, 2001 Contractor: Express Ac And Heat Client: Martinez J, Ronald S | Permit id: M01008174 | |||||
SCORE 86 Install mechanical equipment single-family dwelling install gas line, meter location and gas water heater. David clay - 283-9050 Date: August 5, 2002 Contractor: David Clays Plumbing Client: Martinez J, Ronald S | Permit id: M02004936 | |||||
SCORE 72 Install mechanical equipment single-family dwelling install 4-ton ,3-ton system and 2-gas warm air furnace. Kenneth zimmer - 279-5660 Date: December 21, 2001 Contractor: Express A C And Heat Client: Martinez J, Ronald S | Permit id: M01008174 |