Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 Extend breakfast and living room and extend master bedroom on the 2nd floor 2story addition outside of design standards area Permit type: Building permit | Permit status: Final | Completion date: June 12, 2009 | Expiration date: June 12, 2009 | Permit id: 2008-080446 Bp | |||||
SCORE 61 New 14 sf swimming pool and 917 sf of wood decking uncovered decking requires an enclosure device for all singlefamily residences the fence must be at least 4 in height with a maximum gate opening of 4 as well the gate must be equipped with both selfclosing and selflocking mechanisms Permit type: Building permit | Permit status: Expired | Expiration date: December 1, 2009 | Permit id: 2008-080478 Bp | |||||
SCORE 98 New 14 sf swimming pool and 917 sf of wood decking uncovered decking requires an enclosure device for all singlefamily residences the fence must be at least 4 in height with a maximum gate opening of 4 as well the gate must be equipped with both selfclosing and selflocking mechanisms Date: June 3, 2009 Contractor: Michael Parsons Permit type: Electrical permit | Permit status: Expired | Expiration date: December 1, 2009 | Permit id: 2008-080478 Ep | |||||
SCORE 100 Extend breakfast and living room and extend master bedroom on the 2nd floor 2story addition outside of design standards area Date: December 11, 2008 Contractor: Bryan Neal Permit type: Electrical permit | Permit status: Final | Completion date: April 29, 2009 | Expiration date: April 29, 2009 | Permit id: 2008-080446 Ep | |||||
SCORE 98 Extend breakfast and living room and extend master bedroom on the 2nd floor 2story addition outside of design standards area Date: January 30, 2009 Contractor: Gary Bramblett Permit type: Mechanical permit | Permit status: Final | Completion date: May 27, 2009 | Expiration date: May 27, 2009 | Permit id: 2008-080446 Mp | |||||
Two stry frm res wbrk ven att garage Date: June 11, 1986 Value: $147,420 Permit type: Building permit | Permit status: Final | Completion date: November 26, 1986 | Expiration date: November 26, 1986 | Permit id: 1986-009907 Bp | |||||
SCORE 100 Extend breakfast and living room and extend master bedroom on the 2nd floor 2story addition outside of design standards area Date: November 21, 2008 Contractor: John Zerr Permit type: Plumbing permit | Permit status: Final | Completion date: May 27, 2009 | Expiration date: May 27, 2009 | Permit id: 2008-080446 Pp | |||||
Add 2nd story over garage for bedroom bath Date: March 24, 1998 Value: $64,000 Permit type: Mechanical permit | Permit status: Final | Completion date: August 6, 1998 | Expiration date: August 6, 1998 | Permit id: 1998-008967 Mp | |||||
SCORE 100 Replacement of complete duct system only Date: March 7, 2017 Contractor: Wayne Harrel Permit type: Mechanical permit | Permit status: Final | Completion date: March 22, 2017 | Expiration date: March 22, 2017 | Permit id: 2017-025248 Mp |