Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Tenant finish out adminbusprof office Applicant Phone: (512) 848-4158 | Permit type: Building permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2014-093065 Bp | |||||
SCORE 93 Tenant finish out adminbusprof office Date: October 4, 2014 Contractor: Jesse J Navejas Permit type: Electrical permit | Permit status: Final | Completion date: November 25, 2014 | Expiration date: November 25, 2014 | Permit id: 2014-093065 Ep | |||||
SCORE 100 Tenant finish out adminbusprof office Date: October 9, 2014 Contractor: Richard Chapman Permit type: Plumbing permit | Permit status: Final | Completion date: December 3, 2014 | Expiration date: December 3, 2014 | Permit id: 2014-093065 Pp | |||||
SCORE 100 Tenant finish out adminbusprof office Date: September 15, 2014 Contractor: Robert A. Fabrizio Permit type: Mechanical permit | Permit status: Final | Completion date: November 24, 2014 | Expiration date: November 24, 2014 | Permit id: 2014-093065 Mp | |||||
SCORE 72 Tenant finishout for admnbusprof offices Applicant Phone: (512) 275-0881 | Permit type: Building permit | Permit status: Final | Completion date: December 3, 2015 | Expiration date: December 3, 2015 | Permit id: 2015-095146 Bp | |||||
SCORE 100 Tenant finishout for admnbusprof offices Date: August 21, 2015 Contractor: Bobby Sanford Permit type: Electrical permit | Permit status: Final | Completion date: November 10, 2015 | Expiration date: November 10, 2015 | Permit id: 2015-095146 Ep | |||||
SCORE 93 Tenant finishout for admnbusprof offices Date: September 15, 2015 Contractor: Tu Huynh Permit type: Mechanical permit | Permit status: Final | Completion date: November 17, 2015 | Expiration date: November 17, 2015 | Permit id: 2015-095146 Mp | |||||
SCORE 100 Tenant finishout for admnbusprof offices Date: August 27, 2015 Contractor: Richard Chapman Permit type: Plumbing permit | Permit status: Final | Completion date: November 13, 2015 | Expiration date: November 13, 2015 | Permit id: 2015-095146 Pp | |||||
SCORE 93 Tenant finishout for admnbusprof offices Date: September 15, 2015 Contractor: Tu Huynh Permit type: Mechanical permit | Permit status: Final | Completion date: November 17, 2015 | Expiration date: November 17, 2015 | Permit id: 2015-095146 Mp | |||||
SCORE 100 Tenant finishout for admnbusprof offices Date: August 27, 2015 Contractor: Richard G Chapman Permit type: Plumbing permit | Permit status: Final | Completion date: November 13, 2015 | Expiration date: November 13, 2015 | Permit id: 2015-095146 Pp | |||||
SCORE 100 Tenant finishout for admnbusprof offices Date: August 21, 2015 Contractor: Bobby Sanford Permit type: Electrical permit | Permit status: Final | Completion date: November 10, 2015 | Expiration date: November 10, 2015 | Permit id: 2015-095146 Ep | |||||
SCORE 100 Tenant finish out adminbusprof office Date: October 9, 2014 Contractor: Richard G Chapman Permit type: Plumbing permit | Permit status: Final | Completion date: December 3, 2014 | Expiration date: December 3, 2014 | Permit id: 2014-093065 Pp | |||||
SCORE 96 Tenant finish out adminbusprof office Date: October 4, 2014 Contractor: Jesse Joe Navejas Permit type: Electrical permit | Permit status: Final | Completion date: November 25, 2014 | Expiration date: November 25, 2014 | Permit id: 2014-093065 Ep | |||||
SCORE 100 Tenant finishout for admnbusprof offices Date: August 21, 2015 Contractor: Bobby Sanford Permit type: Electrical permit | Permit status: Final | Completion date: November 10, 2015 | Expiration date: November 10, 2015 | Permit id: 2015-095146 Ep | |||||
SCORE 65 Install 2 40amp circuits for electric vehical charging stations only Date: April 1, 2015 Contractor: Joe G Martin Permit type: Electrical permit | Permit status: Final | Completion date: April 14, 2015 | Expiration date: April 14, 2015 | Permit id: 2015-036658 Ep | |||||
SCORE 96 Interior remodel to shell building remove slab on grade 1st floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: April 22, 2016 | Expiration date: April 22, 2016 | Permit id: 2015-095403 Bp | |||||
SCORE 96 Interior remodel to shell building remove slab on grade 2nd floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: April 21, 2016 | Expiration date: April 21, 2016 | Permit id: 2015-095404 Bp | |||||
SCORE 96 Interior remodel to shell building remove slab on grade 3rd floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: April 21, 2016 | Expiration date: April 21, 2016 | Permit id: 2015-095405 Bp | |||||
SCORE 96 Interior remodel to shell building remove slab on grade 4th floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: April 21, 2016 | Expiration date: April 21, 2016 | Permit id: 2015-095406 Bp | |||||
SCORE 96 Interior nonstructural demolition Permit type: Building permit | Permit status: Void | Expiration date: August 31, 2016 | Permit id: 2016-024301 Bp | |||||
SCORE 96 Shade structure and landscape upgrades Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: May 18, 2016 | Expiration date: May 18, 2016 | Permit id: 2016-041151 Bp | |||||
SCORE 96 Interior demo nonstructural Permit type: Building permit | Permit status: Final | Completion date: April 19, 2016 | Expiration date: April 19, 2016 | Permit id: 2015-094402 Bp | |||||
SCORE 96 Interior demo nonstructural Permit type: Building permit | Permit status: Final | Completion date: April 19, 2016 | Expiration date: April 19, 2016 | Permit id: 2015-094404 Bp | |||||
SCORE 96 Interior demo nonstructural Permit type: Building permit | Permit status: Final | Completion date: April 21, 2016 | Expiration date: April 21, 2016 | Permit id: 2015-094407 Bp | |||||
SCORE 96 Finishout employee kitchencafe for admnbusprof offices Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: March 31, 2016 | Expiration date: March 31, 2016 | Permit id: 2015-112926 Bp | |||||
SCORE 99 Finishout employee kitchencafe for admnbusprof offices first floor Date: September 21, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: January 26, 2016 | Expiration date: January 26, 2016 | Permit id: 2015-112926 Ep | |||||
SCORE 93 Finishout employee kitchencafe for admnbusprof offices see attachements for amoc for grease duct Date: October 6, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2016 | Expiration date: January 19, 2016 | Permit id: 2015-112926 Mp | |||||
SCORE 98 Finishout employee kitchencafe for admnbusprof offices Date: September 25, 2015 Contractor: Charles Wilson Permit type: Plumbing permit | Permit status: Final | Completion date: January 26, 2016 | Expiration date: January 26, 2016 | Permit id: 2015-112926 Pp | |||||
SCORE 96 Tenant finish out to create admin office phase ii 1st floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: February 10, 2016 | Expiration date: February 10, 2016 | Permit id: 2015-117135 Bp | |||||
SCORE 96 Tenant finish out to create admin office phase ii 2nd floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: February 10, 2016 | Expiration date: February 10, 2016 | Permit id: 2015-117137 Bp | |||||
SCORE 96 Tenant finish out to create admin office phase ii 3rd floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: February 12, 2016 | Expiration date: February 12, 2016 | Permit id: 2015-117138 Bp | |||||
SCORE 96 Tenant finish out to create admin office phase ii 4th floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: February 12, 2016 | Expiration date: February 12, 2016 | Permit id: 2015-117139 Bp | |||||
SCORE 99 Tenant finish out to create admin office phase ii 1st floor Date: October 2, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117135 Ep | |||||
SCORE 93 Tenant finish out to create admin office phase ii 1st floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2016 | Expiration date: January 19, 2016 | Permit id: 2015-117135 Mp | |||||
SCORE 98 Tenant finish out to create admin office phase ii 1st floor Date: October 2, 2015 Contractor: Charles Wilson Permit type: Plumbing permit | Permit status: Final | Completion date: January 26, 2016 | Expiration date: January 26, 2016 | Permit id: 2015-117135 Pp | |||||
SCORE 99 Tenant finish out to create admin office phase ii 2nd floor Date: October 2, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117137 Ep | |||||
SCORE 93 Tenant finish out to create admin office phase ii 2nd floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2016 | Expiration date: January 19, 2016 | Permit id: 2015-117137 Mp | |||||
SCORE 98 Tenant finish out to create admin office phase ii 2nd floor Date: October 2, 2015 Contractor: Charles Wilson Permit type: Plumbing permit | Permit status: Final | Completion date: December 31, 2015 | Expiration date: December 31, 2015 | Permit id: 2015-117137 Pp | |||||
SCORE 99 Tenant finish out to create admin office phase ii 3rd floor Date: October 2, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117138 Ep | |||||
SCORE 93 Tenant finish out to create admin office phase ii 3rd floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117138 Mp | |||||
SCORE 98 Tenant finish out to create admin office phase ii 3rd floor Date: October 2, 2015 Contractor: Charles Wilson Permit type: Plumbing permit | Permit status: Final | Completion date: December 22, 2015 | Expiration date: December 22, 2015 | Permit id: 2015-117138 Pp | |||||
SCORE 100 Install outside underground plumbing www utilities and fireline Date: August 28, 2013 Contractor: Morris Ray Permit type: Plumbing permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2013-090689 Pp | |||||
SCORE 100 Install new irrigation system to new commercial property Date: October 7, 2014 Contractor: Austin Commercial Lp Permit type: Plumbing permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2014-107547 Pp | |||||
SCORE 99 Tenant finish out to create admin office phase ii 4th floor Date: October 2, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117139 Ep | |||||
SCORE 93 Tenant finish out to create admin office phase ii 4th floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117139 Mp | |||||
SCORE 98 Tenant finish out to create admin office phase ii 4th floor Date: October 2, 2015 Contractor: Charles Wilson Permit type: Plumbing permit | Permit status: Final | Completion date: December 18, 2015 | Expiration date: December 18, 2015 | Permit id: 2015-117139 Pp | |||||
SCORE 100 Finishout employee kitchencafe for admnbusprof offices number walkin cooler installed 1 number walkin freezer installed 1 Date: December 22, 2015 Contractor: Boyd Krcha Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2016 | Expiration date: January 19, 2016 | Permit id: 2015-151742 Mp | |||||
SCORE 100 New shell admnbusprof office bldg Applicant Phone: (512) 306-9880 | Permit type: Building permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2013-0557 Bp | |||||
SCORE 100 New shell admnbusprof office bldg Date: October 21, 2013 Contractor: Mike Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: October 6, 2014 | Expiration date: October 6, 2014 | Permit id: 2013-0557 Ep | |||||
SCORE 100 New shell admnbusprof office bldg Date: August 29, 2013 Contractor: Khanh Pham Permit type: Mechanical permit | Permit status: Final | Completion date: December 1, 2014 | Expiration date: December 1, 2014 | Permit id: 2013-0557 Mp | |||||
SCORE 100 New shell admnbusprof office bldg Date: November 5, 2013 Contractor: William Thomas Biggs Permit type: Plumbing permit | Permit status: Final | Completion date: October 6, 2014 | Expiration date: October 6, 2014 | Permit id: 2013-0557 Pp | |||||
SCORE 100 Temp meter loop for pmt 2013055710 Date: September 20, 2013 Contractor: Mike Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: December 19, 2013 | Expiration date: December 19, 2013 | Permit id: 2013-098365 Ep | |||||
SCORE 93 Tenant finish out to create admin office phase ii 3rd floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117138 Mp | |||||
SCORE 100 Temp meter loop for pmt 2013055710 Date: September 20, 2013 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: December 19, 2013 | Expiration date: December 19, 2013 | Permit id: 2013-098365 Ep | |||||
SCORE 93 Finishout employee kitchencafe for admnbusprof offices see attachements for amoc for grease duct Date: October 6, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2016 | Expiration date: January 19, 2016 | Permit id: 2015-112926 Mp | |||||
SCORE 93 Tenant finish out to create admin office phase ii 1st floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2016 | Expiration date: January 19, 2016 | Permit id: 2015-117135 Mp | |||||
SCORE 100 Install outside underground plumbing www utilities and fireline Date: August 28, 2013 Contractor: Morris Ray Permit type: Plumbing permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2013-090689 Pp | |||||
SCORE 93 Tenant finish out to create admin office phase ii 2nd floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 19, 2016 | Expiration date: January 19, 2016 | Permit id: 2015-117137 Mp | |||||
SCORE 93 Tenant finish out to create admin office phase ii 4th floor Date: October 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-117139 Mp | |||||
SCORE 100 New shell admnbusprof office bldg Date: October 21, 2013 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: October 6, 2014 | Expiration date: October 6, 2014 | Permit id: 2013-0557 Ep | |||||
SCORE 100 New shell admnbusprof office bldg Date: August 29, 2013 Contractor: Khanh Pham Permit type: Mechanical permit | Permit status: Final | Completion date: December 1, 2014 | Expiration date: December 1, 2014 | Permit id: 2013-0557 Mp | |||||
SCORE 100 New shell admnbusprof office bldg Date: October 21, 2013 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: October 6, 2014 | Expiration date: October 6, 2014 | Permit id: 2013-0557 Ep | |||||
SCORE 100 Temp meter loop for pmt 2013055710 Date: September 20, 2013 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: December 19, 2013 | Expiration date: December 19, 2013 | Permit id: 2013-098365 Ep | |||||
SCORE 96 Tenant finishout for accessory use personal improvement services for admnbusprof offices Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: February 26, 2016 | Expiration date: February 26, 2016 | Permit id: 2015-1491 Bp | |||||
SCORE 100 Tenant finishout for accessory use personal improvement services for admnbusprof offices Date: December 18, 2015 Contractor: Blake Combs Permit type: Electrical permit | Permit status: Final | Completion date: February 25, 2016 | Expiration date: February 25, 2016 | Permit id: 2015-1491 Ep | |||||
SCORE 100 Tenant finishout for accessory use personal improvement services for admnbusprof offices Date: December 28, 2015 Contractor: Charles Paxton Permit type: Mechanical permit | Permit status: Final | Completion date: February 18, 2016 | Expiration date: February 18, 2016 | Permit id: 2015-1491 Mp | |||||
SCORE 96 Tenant finish out to create admin office 3rd floor phase 1 Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: February 16, 2016 | Expiration date: February 16, 2016 | Permit id: 2015-126733 Bp | |||||
SCORE 99 Tenant finish out to create admin office 3rd floor phase 1 Date: November 3, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: January 15, 2016 | Expiration date: January 15, 2016 | Permit id: 2015-126733 Ep | |||||
SCORE 93 Tenant finish out to create admin office 3rd floor phase 1 Date: November 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 12, 2016 | Expiration date: January 12, 2016 | Permit id: 2015-126733 Mp | |||||
SCORE 96 Tenant finish out to create admnbusprof office 4th floor Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: July 7, 2016 | Expiration date: July 7, 2016 | Permit id: 2016-030558 Bp | |||||
SCORE 99 Tenant finish out to create admnbusprof office 4th floor Date: March 25, 2016 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: June 28, 2016 | Expiration date: June 28, 2016 | Permit id: 2016-030558 Ep | |||||
SCORE 100 Tenant finish out to create admnbusprof office 4th floor Date: April 4, 2016 Contractor: Charles Paxton Permit type: Mechanical permit | Permit status: Final | Completion date: June 22, 2016 | Expiration date: June 22, 2016 | Permit id: 2016-030558 Mp | |||||
SCORE 100 Tenant finish out to create admnbusprof office 4th floor Date: April 4, 2016 Contractor: Charles Paxton Permit type: Plumbing permit | Permit status: Final | Completion date: June 29, 2016 | Expiration date: June 29, 2016 | Permit id: 2016-030558 Pp | |||||
SCORE 96 Tenant finishout for admbusprof office Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Active | Expiration date: February 22, 2017 | Permit id: 2016-102238 Bp | |||||
SCORE 98 Tenant finish out to create admin office 3rd floor phase 1 Date: November 2, 2015 Contractor: Charles Wilson Permit type: Plumbing permit | Permit status: Final | Completion date: January 4, 2016 | Expiration date: January 4, 2016 | Permit id: 2015-126733 Pp | |||||
SCORE 100 Tenant finishout for accessory use personal improvement services for admnbusprof offices Date: December 28, 2015 Contractor: Richard Chapman Permit type: Plumbing permit | Permit status: Final | Completion date: February 18, 2016 | Expiration date: February 18, 2016 | Permit id: 2015-1491 Pp | |||||
SCORE 100 New shell admnbusprof office bldg Applicant Phone: (512) 306-9880 | Permit type: Building permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2013-055711 Bp | |||||
SCORE 100 New shell admnbusprof office bldg Date: October 21, 2013 Contractor: Mike Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: November 7, 2014 | Expiration date: November 7, 2014 | Permit id: 2013-055711 Ep | |||||
SCORE 100 New shell admnbusprof office bldg Date: August 29, 2013 Contractor: Khanh Pham Permit type: Mechanical permit | Permit status: Final | Completion date: November 26, 2014 | Expiration date: November 26, 2014 | Permit id: 2013-055711 Mp | |||||
SCORE 100 New shell admnbusprof office bldg Date: November 5, 2013 Contractor: William Thomas Biggs Permit type: Plumbing permit | Permit status: Final | Completion date: November 26, 2014 | Expiration date: November 26, 2014 | Permit id: 2013-055711 Pp | |||||
SCORE 100 Tenant finishout for accessory use personal improvement services for admnbusprof offices Date: December 28, 2015 Contractor: Richard G Chapman Permit type: Plumbing permit | Permit status: Final | Completion date: February 18, 2016 | Expiration date: February 18, 2016 | Permit id: 2015-1491 Pp | |||||
SCORE 100 Tenant finishout for accessory use personal improvement services for admnbusprof offices Date: December 28, 2015 Contractor: Chuck Paxton Permit type: Mechanical permit | Permit status: Final | Completion date: February 18, 2016 | Expiration date: February 18, 2016 | Permit id: 2015-1491 Mp | |||||
SCORE 93 Tenant finish out to create admin office 3rd floor phase 1 Date: November 2, 2015 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: January 12, 2016 | Expiration date: January 12, 2016 | Permit id: 2015-126733 Mp | |||||
SCORE 100 Tenant finishout for accessory use personal improvement services for admnbusprof offices Date: December 18, 2015 Contractor: Blake Combs Permit type: Electrical permit | Permit status: Final | Completion date: February 25, 2016 | Expiration date: February 25, 2016 | Permit id: 2015-1491 Ep | |||||
SCORE 100 Tenant finish out to create admnbusprof office 4th floor Date: April 4, 2016 Contractor: Charles Paxton Permit type: Plumbing permit | Permit status: Final | Completion date: June 29, 2016 | Expiration date: June 29, 2016 | Permit id: 2016-030558 Pp | |||||
SCORE 100 New shell admnbusprof office bldg Date: August 29, 2013 Contractor: Khanh Pham Permit type: Mechanical permit | Permit status: Final | Completion date: November 26, 2014 | Expiration date: November 26, 2014 | Permit id: 2013-055711 Mp | |||||
SCORE 100 New shell admnbusprof office bldg Date: October 21, 2013 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: November 7, 2014 | Expiration date: November 7, 2014 | Permit id: 2013-055711 Ep | |||||
SCORE 100 Tenant finish out to create admnbusprof office 4th floor Date: April 4, 2016 Contractor: Chuck Paxton Permit type: Mechanical permit | Permit status: Final | Completion date: June 22, 2016 | Expiration date: June 22, 2016 | Permit id: 2016-030558 Mp | |||||
SCORE 100 New shell admnbusprof office bldg Date: October 21, 2013 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: November 7, 2014 | Expiration date: November 7, 2014 | Permit id: 2013-055711 Ep | |||||
SCORE 100 New parking garage Applicant Phone: (512) 306-9880 | Permit type: Building permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2013-066912 Bp | |||||
SCORE 100 New parking garage Date: April 3, 2014 Contractor: Mike Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: December 3, 2014 | Expiration date: December 3, 2014 | Permit id: 2013-066912 Ep | |||||
SCORE 100 New parking garage Date: December 2, 2014 Contractor: Khanh Pham Permit type: Mechanical permit | Permit status: Final | Completion date: December 2, 2014 | Expiration date: December 2, 2014 | Permit id: 2013-066912 Mp | |||||
SCORE 100 New parking garage Date: February 27, 2014 Contractor: William Thomas Biggs Permit type: Plumbing permit | Permit status: Final | Completion date: December 3, 2014 | Expiration date: December 3, 2014 | Permit id: 2013-066912 Pp | |||||
SCORE 100 New parking garage Date: April 3, 2014 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: December 3, 2014 | Expiration date: December 3, 2014 | Permit id: 2013-066912 Ep | |||||
SCORE 100 New parking garage Date: December 2, 2014 Contractor: Khanh Pham Permit type: Mechanical permit | Permit status: Final | Completion date: December 2, 2014 | Expiration date: December 2, 2014 | Permit id: 2013-066912 Mp | |||||
SCORE 100 New parking garage Date: April 3, 2014 Contractor: Mike E Kanetzky Permit type: Electrical permit | Permit status: Final | Completion date: December 3, 2014 | Expiration date: December 3, 2014 | Permit id: 2013-066912 Ep | |||||
SCORE 100 Tenant finishout for admbusprof office Date: October 21, 2016 Contractor: Charles Paxton Permit type: Plumbing permit | Permit status: Final | Completion date: February 1, 2017 | Expiration date: February 1, 2017 | Permit id: 2016-102238 Pp | |||||
SCORE 96 Tenant finishout for admbusprof office Applicant Phone: (650) 380-8574 | Permit type: Building permit | Permit status: Final | Completion date: February 15, 2017 | Expiration date: February 15, 2017 | Permit id: 2016-102238 Bp | |||||
SCORE 99 Tenant finishout for admbusprof office Date: October 12, 2016 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: January 30, 2017 | Expiration date: January 30, 2017 | Permit id: 2016-102238 Ep | |||||
SCORE 100 Tenant finishout for admbusprof office Date: October 21, 2016 Contractor: Chuck Paxton Permit type: Mechanical permit | Permit status: Final | Completion date: January 18, 2017 | Expiration date: January 18, 2017 | Permit id: 2016-102238 Mp |