SCORE 95 Replace a forced air furnace Date: October 28, 2004 Contractor: Welzig Mechanical Client: Authority Housing | Applicant: Welzig Mechanical | Permit type: Mechanical | Permit status: Cmp | Current use: Multifamily dwe | |||||
SCORE 95 Replace a forced air furnace Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Current use: Multifamily dwellings, existing | Permit id: Pmt2004-04199 | |||||
SCORE 98 Replacement forced-air furnace unit #201 Date: January 16, 2008 Contractor: Boulder Housing Partners Client: Authority Housing | Applicant: Boulder Housing Partners | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 98 Replace hot water heater in unit #202 Date: February 15, 2008 Contractor: Boulder Housing Partners Client: Authority Housing | Applicant: Boulder Housing Partners | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Multifamily dwe | |||||
SCORE 95 Replacement of four, second story decks, two types as and two type bs. Client: Authority Housing | Applicant: Palace Construction Co Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 24, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 Electrical service change for amp service on duplex and replace existing panel. Date: April 14, 2011 Contractor: Crystal Electric Inc Client: Authority Housing | Applicant: Crystal Electric Inc | Permit type: Electrical | Permit status: Iss | Current use: Single family a | |||||
SCORE 82 Building 7 -- installation of eight standard replacement forced-air furnaces in this multi-family building. And eight new a c units. (13 seer minimum) (building 7 of the bridgewalk complex) each furnace to be 60,0 btu. Units 101, 102, 103,104, 201, 202, 203 and 204. Electrical work by separate permit. Date: October 26, 2011 Contractor: Peak Refrigeration Client: Authority Housing | Applicant: Peak Refrigeration | Permit type: Mechanical | Permit status: Cmp | Completion date: January 20, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 Building 7 -- on an existing multi-family dwelling unit, removal of existing exterior stairway components (railing, treads and risers) -- stringers to remain. Install replacement perforated metal treads, compliant guardrails and compliant handrails. Dimensions of stairway (riser hight, tread run,and width) to remain unchanged. Applicant: Palace Construction Co Inc | Permit type: Building | Permit status: Cmp | Completion date: January 17, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 Installation of a 3. 24 kw solar array flush mounted and grid tied Date: November 10, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 16, 2011 | Current use: Multifamily dwe | |||||
SCORE 79 Building seven at the bridgewalk complex -- installation of eight disconnects, associated wiring and circuit breakers for proposed a c units in this eight-plex. Installation of eight a c units by separate mechanical permit. Date: December 8, 2011 Contractor: Colorado Mountain Electric Applicant: Colorado Mountain Electric | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwe | |||||
SCORE 95 New backflow preventor for building 7 1. 5inch wilkens backflow Date: January 24, 2012 Contractor: Integrated Safety Services Client: Authority Housing | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwe | |||||
SCORE 82 Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch. Date: April 3, 2012 Contractor: L H L Contractors Client: Authority Housing | Applicant: L H L Contractors | Permit type: Roofing | Permit status: Cmp | Completion date: April 13, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 New backflow preventor for building 7 1. 5inch wilkens backflow Client: Authority Housing | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00278 | |||||
SCORE 82 Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch. Client: Authority Housing | Permit type: Roofing | Permit status: Cmp | Completion date: April 13, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-01490 | |||||
SCORE 95 Replacement of four, second story decks, two types as and two type bs. Client: Authority Housing | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 24, 2010 | Current use: Multifamily dwellings, existing, deck, n | Permit id: Pmt2010-02280 | |||||
SCORE 98 Replace hot water heater in unit #202 Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2008-00549 | |||||
SCORE 100 Electrical service change for amp service on duplex and replace existing panel. Client: Authority Housing | Permit type: Electrical | Permit status: Cmp | Completion date: November 29, 2016 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-01442 | |||||
SCORE 82 Building 7 -- installation of eight standard replacement forced-air furnaces in this multi-family building. And eight new a c units. (13 seer minimum) (building 7 of the bridgewalk complex) each furnace to be 60,0 btu. Units 101, 102, 103,104, 201, 202, 203 and 204. Electrical work by separate permit. Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: January 20, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04656 | |||||
SCORE 100 Installation of a 3. 24 kw solar array flush mounted and grid tied Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 16, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04946 | |||||
SCORE 79 Building seven at the bridgewalk complex -- installation of eight disconnects, associated wiring and circuit breakers for proposed a c units in this eight-plex. Installation of eight a c units by separate mechanical permit. Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05344 | |||||