Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 69 Int remodel of main floor, new slurry floor, new doors & windows (no change in openings), re-roof, strip to deck, replace per code w metal roofing, elec plmbg mech permits reqd, r-2 sfd, not historic wp, pu stamp provided j. U. Date: July 2, 2012 Contractor: Jaden Hibler And Ian Gustavesonm Permit status: Inspections | Current use: Residential | Permit id: Bld2012-02851 | |||||
SCORE 91 Install furnace and a c. Date: October 4, 2012 Contractor: Climate Rite Inc Permit type: Mechanical | Permit status: Inspections | Current use: Residential | Permit id: Bld2012-07357 | |||||
SCORE 100 Electrical Date: December 17, 2012 Contractor: Servelco Llc Permit status: Closed | Current use: Residential | Permit id: Bld2012-09193 | |||||
SCORE 69 6 fixtures, 1 water heater, 2 drains for remodel Date: December 31, 2012 Contractor: Jaden Hibler And Ian Gustavesonm Permit type: Plumbing | Permit status: Inspections | Current use: Residential | Permit id: Bld2012-09381 | |||||
SCORE 100 Date: October 25, 2012 Contractor: Na Permit id: Bld2012-02851 | |||||
SCORE 100 Date: October 4, 2012 Contractor: Na Permit id: Bld2012-07357 | |||||
SCORE 100 Date: December 17, 2012 Contractor: Na Permit id: Bld2012-09193 | |||||
SCORE 100 Date: December 31, 2012 Contractor: Na Permit id: Bld2012-09381 |