Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: March 28, 2014 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 512589 | |||||
Electrical permit Date: April 7, 2014 Client: Congregation Rodeph Shalom | Permit status: Expired | Permit id: 523809 | |||||
Electrical permit Date: April 10, 2013 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 458047 | |||||
Mechanical permit Date: April 21, 2014 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 523608 | |||||
Administrative permit Date: June 15, 2015 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 617699 | |||||
Suppression permit Date: September 22, 2014 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 553105 | |||||
Administrative permit Date: June 27, 2013 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 474815 | |||||
Addition permit Date: November 13, 2013 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 493948 | |||||
Zoning/use permit Date: November 21, 2012 Client: Congregation Rodeph Shalom | Permit status: Completed | Permit id: 438101 | |||||
Zoning use permit Date: November 21, 2012 Client: Congregation Rodeph Shalom C O Tom Perloff | Permit status: Completed | Permit id: 438101 | |||||
SCORE 100 Install (1)5inch sanitary sewer and install (1)12inch storm lateral pa20140920007 (place of worship) no water permit Date: May 6, 2014 Contractor: Albert J Sgro Mechanical Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: November 13, 2014 | Permit id: 528108 | |||||
SCORE 100 Fa,lighting,lighting controls,branch wiring,power to hvac equip,phone and data work,distribution equipment,400amp service,temp power and lighting,power to job trailers,electrical demo per 2008 nec & nfpa (place of worship) Date: April 7, 2014 Contractor: Shelly Electric Co Inc Permit type: Electrical permit | Permit status: Expired | Completion date: April 7, 2014 | Permit id: 523809 | |||||
SCORE 96 Temporary certificate of occupancy in association with a p # 493948 Date: June 15, 2015 Contractor: Intech Construction Llc Permit type: Administrative permit | Permit status: Completed | Completion date: June 19, 2015 | Permit id: 617699 | |||||
SCORE 100 For the alterations of an existing hvac system, to include ductwork and refrigerant piping to include registers grilles diffusers, air handling units, fan coil units, and exhaust fans as per approved plans. Separate permit required for the installation of kitchen exhaust hoods. Date: April 21, 2014 Contractor: Devine Brothers Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: June 25, 2015 | Permit id: 523608 | |||||
SCORE 100 Install wiremold with circuitry for 4 at locations & 2 recptacles for window a c units. Date: August 19, 2013 Contractor: Palman Electric Inc Permit type: Electrical permit | Permit status: Completed | Completion date: October 3, 2013 | Permit id: 489183 | |||||
For partial site & interior demolition to exist. Building, site excavation to create open parking lot, & the erection of a four (4) story addition of conventional steel & concrete frame w. Shallow foundation construction for conference, office, & lobby spaces, & for level ii alterations w. No change of occupancy classification throughout an exist. Five (5) story mixed-use religous assembly building to include installation of new exit stairways; work areas & existing building to be partially sprinklered. All permitted work in accordance with plans approved by phc dated 08. 28. 13. Asbestos abatement to be completed prior to commencement of permitted work. Date: November 13, 2013 Permit type: Addition permit | Permit status: Completed | Completion date: August 11, 2015 | Permit id: 493948 | |||||
SCORE 100 New plumbing for addition (house of worship) Date: March 28, 2014 Contractor: Bofinger And Breslin Permit type: Plumbing permit | Permit status: Completed | Completion date: June 25, 2015 | Permit id: 512589 | |||||
For the erection of a four, two and one story addition (618" high) to an existing detached building and for the erection of an exterior egress stair at the fourth floor roof of the existing building, (size and location as shown in the application). For the extension of an existing synagogue with an existing school and accessory facilities and services with three interior bicycle parking spaces; for the reconfiguration of the parking lot to create a total of 108 accessory parking spaces (including 6 handicap accessible spaces) with landscaped buffer areas along green street, 13th street and mount vernon street, (size and location as shown in the application). Date: November 21, 2012 Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 22, 2013 | Permit id: 438101 | |||||
SCORE 100 Install of 20-4 strip lgt fixtures on interior of new stair tower, 3-wall pack exterior of new stair tower, 3-strobes lgts, 3-exit sign & pull station as per nec 2008 & nfpa 72 Date: April 10, 2013 Contractor: Precision Electric Permit type: Electrical permit | Permit status: Completed | Completion date: May 29, 2013 | Permit id: 458047 | |||||
Partial change of occupancy to include certificate of occupancy for two (2) daycare classrooms on the third floor level of an existing structure as per approved plans. Date: June 27, 2013 Permit type: Administrative permit | Permit status: Completed | Completion date: July 1, 2013 | Permit id: 474815 | |||||
SCORE 95 Route new bulk standpipe main through existing bldg to new addition; new standpipe at addition. New standpipe at existing center stair, new sprinkler protection per nfpa 13 throughout new addition, new partial sprinkler protection within existing building Date: September 22, 2014 Contractor: Preferred Fire Protection Inc Permit type: Suppression permit | Permit status: Completed | Completion date: June 25, 2015 | Permit id: 553105 | |||||
Zoning permit Date: November 15, 2012 Client: Congregation Rodeph Shalo | Permit status: Completed | Permit id: 438097 | |||||
Alteration permit Date: July 15, 2008 Client: Congregation Rodeph Shalo | Permit status: Completed | Permit id: 154898 | |||||
Suppression permit Date: April 16, 2013 Client: Congregation Rodeph Shalo | Permit status: Completed | Permit id: 463059 | |||||
Alteration permit Date: August 3, 2007 Client: Congregation Rodeph Shalo | Permit status: Completed | Permit id: 92125 |