Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: September 17, 2010 Client: Johnson Eric Johnson Gilpin Hw | Permit status: Completed | Permit id: 301917 | |||||
Alteration permit Date: September 17, 2010 Client: Johnson Eric Johnson Gilpin Hw | Permit status: Completed | Permit id: 298486 | |||||
Alteration permit Date: September 17, 2010 Client: Johnson Eric Johnson Gilpin H W | Permit status: Completed | Permit id: 298486 | |||||
Electrical permit Date: September 17, 2010 Client: Johnson Eric Johnson Gilpin H W | Permit status: Completed | Permit id: 301917 | |||||
SCORE 89 For the installation of roof top 6. 72kw solar photovoltaic system to an existing structure. Building pmt 298486 Date: September 17, 2010 Contractor: Mercury Solar Systems Inc Client: Kelly Brenna Ellerbe William | Permit type: Electrical permit | Permit status: Completed | Completion date: January 19, 2011 | Permit id: 301917 | |||||
For the lot adjustment to create two lots from two existing lots (6100-02 and 61 ardleigh st.), size and location as shown on the plan. See ap#776327 for plans. Date: June 16, 2017 Client: Kelly Brenna Ellerbe William | Permit type: Zoning permit | Permit status: Completed | Completion date: June 16, 2017 | Permit id: 790894 | |||||
SCORE 82 For the installation of roof top solar photovoltaic system to an existing structure. Date: September 17, 2010 Contractor: Eos Energy Solutions Llc Client: Kelly Brenna Ellerbe William | Permit type: Alteration permit | Permit status: Completed | Completion date: February 7, 2012 | Permit id: 298486 |