Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
For an administrative permit for modification of previously approved attached building per zoning use registration permit# 553598, zba cal# 22377 to increase building height from 33-6"(+ -) to 38-0" & number of stories from three (3) to four (4). Date: August 14, 2015 Client: Thompson St Holdings Llc | Permit type: Zoning admin review | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 602141 | |||||
For the erection of a four story structure with cellar, steps and egress, rear perimeter fence, three story rear portion with roof deck at the fourth floor and a three story portion in the front as shown in application drawings, to be used as a two family dwelling. Date: May 15, 2014 Client: Thompson St Holdings Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 15, 2014 | Permit id: 512903 | |||||
New construction of a four (4) story two (2) family dwelling with a roof deck and pilot house (access to roof deck only) as per approved plans. Building to be fully sprinklered with nfpa 13r minimum. See a p 651766 for plans separate permits required for mep & fire suppression work Date: February 11, 2016 Client: Thompson St Holdings Llc | Permit type: New construction permit | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 656888 | |||||
SCORE 100 For the installation of a two (2) inch fire service line w. Backflow preventor (bfp) assembly and for installation of a fire suppression system as per nfpa 13r. All work shall be in accordance with approved plans. See ap# 725693 for approved plans, calculations, and supplemental documents. Date: October 3, 2016 Contractor: B. M. Consulting Services Inc Client: Thompson St Holdings Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 725694 | |||||
SCORE 100 Install (2) hvac systems with ductwork. (2-family) Date: October 12, 2016 Contractor: Talgar Inc Client: Thompson St Holdings Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 28, 2017 | Permit id: 728440 | |||||
SCORE 100 2 kitchen sinks, 2 dishwasher, 2 garbage disposals, 6 toilets, 6 vanitys, 6 bathtub, 2 washer, curb trap,lateral,1" water service pa20162667451 (two family)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: November 4, 2016 Contractor: Tommys Plumbing Client: Thompson St Holdings Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 728816 | |||||
SCORE 96 New construction: installation of 3- gang service, 1 outlets, 40- switches, light fixtures, 120v inter-connected smoke detectors... All work in accordance with 2008 nec for a two family building Date: October 25, 2016 Contractor: Sfb Wiring Systems Llc Client: Thompson St Holdings Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 730034 |