Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning permit Date: August 22, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 358554 | |||||
Mechanical permit Date: August 24, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 423671 | |||||
Electrical permit Date: August 23, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 423776 | |||||
Plumbing permit Date: June 6, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 404358 | |||||
Alteration permit Date: January 3, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 379756 | |||||
Zoning/use permit Date: September 23, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 358555 | |||||
New construction permit Date: January 3, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 362337 | |||||
Zoning permit Date: August 22, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 340941 | |||||
Suppression permit Date: May 11, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 400266 | |||||
Plumbing permit Date: July 6, 2015 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 622453 | |||||
Zoning admin review Date: December 16, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 377797 | |||||
Permit for the relocation of lot lines to create one (1) lot from two (2) lots (6027-29 germantown avenue and 6033 germantown avenue); for the erection of a two story stair tower addition on building 6027; for the erection of a one story basement stair enclosure addition and a three story stair tower addition on building 6029; for the erection of a one story enclosure addition above the one story portion of building 6033; for the erection of a new one/three story detached structure (nte 35 high) and the creation of a new concrete ramp, stair and retaining wall on the same lot with an existing two story detached structure (6031- no change), for all of the following uses: -three story rear building (6027) for use as a three(3) family dwelling (one on each floor); -three story front building (6029) for use as a four(4) family dwelling (one on the first and third floors and two on the second floor) in the same building with an administrative office on a portion of the first floor; -two sto Date: June 27, 2011 Client: Women Against Abuse Inc | Applicant: Laura J. Schwartz, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: August 16, 2011 | Permit id: 15498 | |||||
Mechanical permit Date: December 6, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 441938 | |||||
Plumbing permit Date: June 6, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 403164 | |||||
Alteration permit Date: January 3, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 379732 | |||||
Electrical permit Date: August 23, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 423777 | |||||
Zoning admin review Date: December 16, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 377797 | |||||
Suppression permit Date: May 11, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 400266 | |||||
Zoning use permit Date: September 23, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 358555 | |||||
New construction permit Date: January 3, 2012 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 362337 | |||||
Plumbing permit Date: July 6, 2015 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 622453 | |||||
Zoning permit Date: August 22, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 340941 | |||||
Permit for the relocation of lot lines to create one (1) lot from two (2) lots (6027-29 germantown avenue and 6033 germantown avenue); for the erection of a two story stair tower addition on building 6027; for the erection of a one story basement stair enclosure addition and a three story stair tower addition on building 6029; for the erection of a one story enclosure addition above the one story portion of building 6033; for the erection of a new one three story detached structure (nte 35 high) and the creation of a new concrete ramp, stair and retaining wall on the same lot with an existing two story detached structure (6031- no change), for all of the following uses: -three story rear building (6027) for use as a three(3) family dwelling (one on each floor); -three story front building (6029) for use as a four(4) family dwelling (one on the first and third floors and two on the second floor) in the same building with an administrative office on a portion of the first floor; -two sto Date: June 27, 2011 Client: Women Against Abuse Inc | Applicant: Laura J. Schwartz, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: August 16, 2011 | Permit id: 15498 | |||||
SCORE 100 New construction throughout building all new receptacles, switches, lighting,350amp service complete and phone cable per 2008 nec (residential complex) Date: September 19, 2012 Contractor: Bruce Dagostino Jr Client: Women Against Abuse Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: February 21, 2013 | Permit id: 426057 | |||||
SCORE 100 Install complete fire alarm system in accordance with nfpa-72(residential complex) Date: October 1, 2012 Contractor: Bruce Dagostino Jr Client: Women Against Abuse Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: January 8, 2013 | Permit id: 429315 | |||||
SCORE 100 Install (3) hvac units including ductwork (multi-family) Date: December 6, 2012 Contractor: Dillon Heating And Air Client: Women Against Abuse Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 441938 | |||||
SCORE 82 Replace curb box for water service pa20151871606 (sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: July 6, 2015 Contractor: Personal Plumbing And Drain Cl Client: Women Against Abuse Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 20, 2015 | Permit id: 622453 | |||||
SCORE 100 Replace 150amp panel box and connection replace 19 lights & 3 new lights (multi family) replace permit #395319 Date: August 23, 2012 Contractor: Bruce Dagostino Jr Client: Women Against Abuse Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: November 22, 2013 | Permit id: 423776 | |||||
SCORE 100 Replace exisitng 100amp & 150amp panels boxes & connection replaces 19 light add 3 new lights (multi family) replace permit #395319 Date: August 23, 2012 Contractor: Bruce Dagostino Jr Client: Women Against Abuse Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: April 22, 2014 | Permit id: 423775 | |||||
SCORE 100 Run sanitary and water to 3 sinks, 4 toilets, 4 basinsm and 3 tubs(mixed use) Date: June 6, 2012 Contractor: Nagellavin Inc Client: Women Against Abuse Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 403164 | |||||
SCORE 100 Replace fixt only-basement-1 lt, 1 washer, 1st fl-2 sinks, 2 toilets, 2 lavs, 1 tub, 2nd fl-2 sinks, 2 toilets, 2 basins, 2 tubs, 3rd fl- 1 sink, 1 toilet, 1 basin, 1 tub (mixed use) Date: June 6, 2012 Contractor: Nagellavin Inc Client: Women Against Abuse Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 404358 | |||||
SCORE 99 Interior and exterior alterations modifications to create improved residential space. Construction to be in accordance with permit#362337. Building to be fully sprinklered Date: January 3, 2012 Contractor: Columbus Construction Llc Client: Women Against Abuse Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 10, 2012 | Permit id: 379756 | |||||
SCORE 99 Alterations to existing building to create improved residential space with accessory office. Includes related exterior improvements. Construction to be in accordance with permit#362337. Building to be fully sprinklered Date: January 3, 2012 Contractor: Columbus Construction Llc Client: Women Against Abuse Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 10, 2012 | Permit id: 377732 | |||||
SCORE 100 Installation of fire suppression system, 13r, 4 Date: May 11, 2012 Contractor: B. M. Consulting Services Inc Client: Women Against Abuse Inc | Permit type: Suppression permit | Permit status: Completed | Completion date: March 1, 2013 | Permit id: 400266 | |||||
SCORE 100 Install two 2-ton condensers with two 2-ton air handlers (2-family) Date: August 24, 2012 Contractor: Dillon Heating And Air Client: Women Against Abuse Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 4, 2014 | Permit id: 423671 | |||||
SCORE 100 Replacing fixtures only 1st floor 1 toilet 1 tub 1 lav 1 sink 2nd floor 1 sink 3rd floor 1 toilet 1 basin 1 tub 2 fd Date: June 6, 2012 Contractor: Nagellavin Inc Client: Women Against Abuse Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 409505 | |||||
SCORE 99 Construction of a 3 story building for use as dwelling units and community room. Building to be fully sprinklered Date: January 3, 2012 Contractor: Columbus Construction Llc Client: Women Against Abuse Inc | Permit type: New construction permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 362337 | |||||
SCORE 99 Interior and exterior modifications to create improved space for existing residential building. Construction to be in accordance with permit#362337. Building to be fully sprinklered Date: January 3, 2012 Contractor: Columbus Construction Llc Client: Women Against Abuse Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: March 1, 2013 | Permit id: 377723 | |||||
SCORE 99 Alterations to existing building to create improved residential space with accessory office. Includes related exterior improvements. Construction to be in accordance with permit#362337. Building to be fully sprinklered. Date: January 3, 2012 Contractor: Columbus Construction Llc Client: Women Against Abuse Inc | Permit type: Alteration permit | Permit status: Completed | Completion date: December 10, 2012 | Permit id: 379732 | |||||
SCORE 100 Total rewire of units 200amp service complete per 2008 nec (two family) replace permit #395319 Date: August 23, 2012 Contractor: Bruce Dagostino Jr Client: Women Against Abuse Inc | Permit type: Electrical permit | Permit status: Completed | Completion date: January 8, 2013 | Permit id: 423766 | |||||
SCORE 100 6" sewer connectiona nd piping in to serve three bldg. Stops within 5ft of bldg(mixed use) Date: March 6, 2012 Contractor: Nagellavin Inc Client: Women Against Abuse Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 20, 2013 | Permit id: 391665 | |||||
SCORE 100 Replace fixtures only 1st floor 1-toilet 1-basin 1-tub 1-sink 2nd floor 1-toilet 1-basin 1-tub 1-sink 2 fd Date: June 6, 2012 Contractor: Nagellavin Inc Client: Women Against Abuse Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 409504 | |||||
SCORE 100 Replace fixt only-basement- 1st fl-3 toilets, 5 lavs, 2 sinks, 1 washer, 1 tub, 2nd fl-2 sinks, 2 toilets, 2 basins, 2 tubs, 3rd fl- 1 sink, 1 toilet, 1 basin, 1 tub (mixed use) Date: June 6, 2012 Contractor: Nagellavin Inc Client: Women Against Abuse Inc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 2, 2013 | Permit id: 404359 | |||||
Zoning permit Date: August 22, 2011 Client: Women Against Abuse Inc | Permit status: Completed | Permit id: 358554 |