Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 New construction project single-family dwelling new construction of a 2-story single family dwelling as per plans Date: January 25, 2002 Contractor: Billy Goliwas Client: Limited Llc, Laurel Street | Permit id: B02000153 | |||||
SCORE 98 Electrical construction loop single-family dwelling elbred malone Date: March 11, 2002 Contractor: Elbred Malone Client: Limited Llc, Laurel Street | Permit id: E02001850 | |||||
SCORE 98 Electrical rewiring single-family dwelling elbred malone Date: April 18, 2002 Contractor: Elbred Malone Client: Limited Llc, Laurel Street | Permit id: E02002937 | |||||
SCORE 89 Install mechanical equipment single-family dwelling install two-4-ton a c and 2- gas warm air furnace. Dean scott - 464-1972 Date: June 27, 2002 Contractor: Scott Refrigeration Client: Limited Llc, Laurel Street | Permit id: M02004125 | |||||
SCORE 98 Install mechanical equipment single-family dwelling install new gas line and 2- gas water heater. E. T. Malbrough 465-9887 Date: August 21, 2002 Contractor: Lakeside Plumbing Client: Limited Llc, Laurel Street | Permit id: M02005312 |