Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Total tear-off & reroof of sfd, squares of asphalt shingles on a pitch represented as 6 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Sophie Reuben | Permit type: Roofing | Permit status: Cmp | Completion date: March 22, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-00967 |