Content |
---|
SCORE 95 Installation of a flush mount 6. 5 kw photovoltaic system array to be parallel to roof plane, and remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and or drawing(s) for specific information. ![]() ![]() Client: Scott Starsky | Applicant: Rec Solar Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 11, 2013 | Current use: Single family d |
SCORE 95 Installation of a flush mount 6. 5 kw photovoltaic system array to be parallel to roof plane, and remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Scott Starsky | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 11, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-01611 |
SCORE 88 Tear-off & reroof of sfd, squares on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: Scott Starsky | Permit type: Roofing | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04801 |
SCORE 76 Tear-off & reroof of sfd, squares on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. ![]() ![]() Client: Scott Starsky | Applicant: Colorado Exteriors, Llc | Permit type: Roofing | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Single family d |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 100 | John Mclaughlin | 6,734 Projects | $132,014 Avg. Project Cost | 10 Years in Business | ![]() |
SCORE 100 | Renewal By Andersen | 2,766 Projects | $7,573 Avg. Project Cost | 12 Years in Business | ![]() |
SCORE 99 | Richard Taylor | 238 Projects | $51,490 Avg. Project Cost | 18 Years in Business | ![]() |
SCORE 99 | Brian Field | 161 Projects | $73,354 Avg. Project Cost | 16 Years in Business | ![]() |
SCORE 99 | John Ryan | 1,271 Projects | $37,669 Avg. Project Cost | 21 Years in Business | ![]() |