Content |
---|
SCORE 96 Elevator mod alteration ![]() ![]() Client: Hrt Of La Methodist Health System, Methodist Healthsystem Foundation Inc | Permit type: Moving equipment | Permit status: Certificate of completion | Current use: Unknown |
SCORE 78 Interior demolition of suite 3 in order to prepare for renovation. No use and occupancy, renovation plans to follow. Client: Hrt Of La Methodist Health System, Methodist Healthsystem Foundation Inc | Permit type: Interior demolition | Permit status: Permit issued | Current use: Business use |
SCORE 96 Remove and replace light fixtures in third floor restrooms Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Current use: Business use |
SCORE 61 Renovations to suite 1 as per plans. Permit type: Renovation (non-structural) | Permit status: Permit issued | Current use: Business use |
SCORE 96 Interior demolition of suite 3 to prepare for renovation ![]() ![]() Client: Hrt Of La Methodist Health System, Methodist Healthsystem Foundation Inc | Permit type: Interior demolition | Permit status: Permit issued | Current use: Business use |
SCORE 96 Suite 2 rework existing circuits for walls being moved. No circuits added. Permit type: Electrical repair / replacement / addition | Permit status: Certificate of completion | Current use: Business use |
SCORE 96 Tenant renovation Permit type: Renovation (non-structural) | Permit status: Certificate of occupancy | Current use: Business use |
SCORE 96 Suite 2 rework switches and outlets ![]() ![]() Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Current use: Business use |
SCORE 59 Atrium railing stabilization and retrofit. Permit type: Renovation (non-structural) | Permit status: Permit issued | Current use: Business use |
SCORE 59 Atrium railing stabilization and retrofit. Permit type: Renovation (non-structural) | Permit status: Certificate of occupancy | Current use: Business use |