Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 7, 2017 Contractor: T And M Solar Inc Permit type: Addn | Permit status: Completed | Completion date: June 28, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 36 sq ft re-roof and 4 sq ft built up re-roof to sfd 6-2-17 change in scope of work. See coa for details. Cdc if a re-roof project is proposed, the following specifications apply. Existing roofing material concrete tiles + build up proposed roofing material concrete tiles + build up manufacturer gaf for built-up roof brand and model ruberoid, class a color (if cool roof required) n a built-up roofing assembly system number per attached listing report (if applicable) iccesr 1274 specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: June 7, 2017 | Permit id: Pds2017-Resalt- |