Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Replace house trap, fai, and drain into basement. Connect above floor. Date: December 5, 2016 Contractor: City Plumbing Llc Client: Lena Church Associates Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 25, 2016 | Permit id: 741241 | |||||
SCORE 89 Replace 5" lateral-pa1#20163400824-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: December 13, 2016 Contractor: City Plumbing Llc Client: Lena Church Associates Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 743125 | |||||
For the erection of a two story addition to an existing building for use as a previously approved manufacturing facility (f-2), addition for the use of a care taker quarter. Addition to be fully sprinklered. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for mecahnical, electrical, plumbing and fire suppression work. Date: March 31, 2016 Client: Lena Church Associates Ll | Permit type: Addition permit | Permit status: Completed | Completion date: March 19, 2017 | Permit id: 643391 | |||||
SCORE 100 Adding a 100a single phase power to building with existing 3- phase service. Service disconnects to be grouped in accordance with article 230. 72 of the 2008 nec. Date: November 18, 2013 Contractor: Curcio Enterprises Ltd Client: Lena Church Associates Ll | Permit type: Electrical permit | Permit status: Expired | Completion date: November 18, 2013 | Permit id: 506470 | |||||
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: June 9, 2016 Client: Lena Church Associates Ll | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 8, 2016 | Permit id: 698778 | |||||
SCORE 96 Install a new 200amp meter socket and 42 circuit electrical panel,install receptacles and wiring. Install recessed lights with led trims,wire and install smokes and install a 30amp 240v service disconnect for ac units per 2008 nec (commercial)north district Date: July 28, 2016 Contractor: Advanced Electrical Contractor Client: Lena Church Associates Ll | Permit type: Electrical permit | Permit status: Completed | Completion date: March 14, 2017 | Permit id: 688295 | |||||
SCORE 100 For the installation of a nfpa 13d system that is supplied by a tank in accordance with section 6. 2. 2 of the 2007 nfpa 13 d standard for a live work unit. The method for refilling the tank shall be piped to the tank. All work and connection details to be completed as per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with nfpa 13d. Date: July 18, 2016 Contractor: Metropolitan Fire Protection Client: Lena Church Associates Ll | Permit type: Suppression permit | Permit status: Completed | Completion date: December 8, 2016 | Permit id: 694894 | |||||
SCORE 100 Alteration: addition; interior (commercial); backflow protection required the installation will compy with the philadelphia plumbing code 2004 Date: July 20, 2016 Contractor: Suburban Heating And Plumbing Client: Lena Church Associates Ll | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 22, 2016 | Permit id: 684892 | |||||
For the erection of an addition to an existing semi-detached structure. Size and location as shown per application plan. Addition for use as a caretaker quarters to previously approved use of a general industial in the existing building. Date: March 31, 2016 Client: Lena Church Associates Ll | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 31, 2016 | Permit id: 643392 | |||||
For the lot adjustment to create one lot from two existing lots (5529-35 lena street and 5539-41 lena street- opa # 882971025, 884342061). Size and location as shown per application plan. Date: March 21, 2016 Client: Lena Church Associates Ll | Permit type: Zoning permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 677846 |