Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: September 8, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 235801 | |||||
Mechanical permit Date: October 8, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 241543 | |||||
Plumbing permit Date: September 16, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 237463 | |||||
Electrical permit Date: September 22, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 237136 | |||||
Electrical permit Date: September 22, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 237136 | |||||
Mechanical permit Date: October 8, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 241543 | |||||
Electrical permit Date: October 24, 2016 Client: Roth Michael B Roth Kimberly J | Permit status: Active | Permit id: 723181 | |||||
Alteration permit Date: September 8, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 235801 | |||||
Plumbing permit Date: September 16, 2009 Client: Roth Michael B Roth Kimberly J | Permit status: Completed | Permit id: 237463 | |||||
SCORE 100 Replacing 2 amp service drop with panel and 1 amp sub-panel for third floor, for future use, no branch circuits, or wiring to sub panel. This work only, additional work requires additional permits..... 2005 nec Date: September 22, 2009 Contractor: Andros Joseph Client: Roth Michael B Roth Kimberly J | Permit type: Electrical permit | Permit status: Completed | Completion date: July 24, 2014 | Permit id: 237136 | |||||
SCORE 100 Replace soil stack,with 2 fixtures Date: September 16, 2009 Contractor: Ingrams Drain And Sewer Cleaning Client: Roth Michael B Roth Kimberly J | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 3, 2010 | Permit id: 237463 | |||||
SCORE 99 Install two (2) gas fired, 95% efficiency, warm air furnaces within a single family dwelling. Permit to include related ductwork. Date: October 8, 2009 Contractor: Sila Heating And Ac Inc Client: Roth Michael B Roth Kimberly J | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 6, 2013 | Permit id: 241543 | |||||
SCORE 88 To install 5. 04 solar array consisting of 16 lg 315 pv modules. As per nec 2008 north district Date: October 24, 2016 Contractor: Solar States Llc Client: Roth Michael B Roth Kimberly J | Permit type: Electrical permit | Permit status: Completed | Completion date: June 22, 2017 | Permit id: 723181 | |||||
General rehab. Of single family dwelling - remove non-bearing partition betweem kitchen and dining room to open floor plan. New gwb on wall as required - new gwb ceilings throughout - new tile bathroom overlay - refinish wood floors - smoke detectors to be installed in the following locations 1. Each bed room 2. In common areas of each floor including basement. - carbon monoxide ( c o ) detectors to be installed in the following locations: 1. Each room where there is a fossil fuel or wood burning appliance. 2. Hall area in vicinity of the bedrooms - no structural work, structural work is not approved Date: September 8, 2009 Client: Roth Michael B Roth Kimberly J | Permit type: Alteration permit | Permit status: Completed | Completion date: August 3, 2013 | Permit id: 235801 |