Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Operations permit Date: November 5, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 19996 | |||||
Alteration permit Date: February 6, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 451153 | |||||
Administrative permit Date: November 1, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 111839 | |||||
Mechanical permit Date: October 25, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 299114 | |||||
Suppression permit Date: January 15, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 499698 | |||||
Alteration permit Date: July 22, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 349020 | |||||
Electrical permit Date: June 25, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 72316 | |||||
Suppression permit Date: May 27, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 601520 | |||||
Alteration permit Date: August 19, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 553066 | |||||
Electrical permit Date: September 14, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 427384 | |||||
Electrical permit Date: May 29, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 526841 | |||||
Alteration permit Date: January 18, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 125061 | |||||
Mechanical permit Date: June 7, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 399221 | |||||
Operations permit Date: July 10, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 9997 | |||||
Plumbing permit Date: November 26, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 576046 | |||||
Mechanical permit Date: March 31, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 670729 | |||||
Suppression permit Date: July 13, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 226252 | |||||
Alteration permit Date: September 21, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 407504 | |||||
Plumbing permit Date: February 12, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 453163 | |||||
Zoning/use permit Date: August 3, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 222111 | |||||
Electrical permit Date: December 2, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 293323 | |||||
Plumbing permit Date: April 1, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 593138 | |||||
Plumbing permit Date: June 7, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 399257 | |||||
Electrical permit Date: September 12, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 359756 | |||||
Suppression permit Date: September 30, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 366072 | |||||
Mechanical permit Date: March 15, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 453171 | |||||
Suppression permit Date: May 21, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 472698 | |||||
Sign permit Date: August 16, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 280728 | |||||
Suppression permit Date: August 2, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 711852 | |||||
Electrical permit Date: February 19, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 445476 | |||||
Demolition permit Date: May 10, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 690693 | |||||
Zoning/use permit Date: September 11, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 451291 | |||||
Alteration permit Date: January 20, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 581306 | |||||
Plumbing permit Date: September 2, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 360470 | |||||
Electrical permit Date: June 12, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 609311 | |||||
Administrative permit Date: March 17, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 518984 | |||||
Zoning/use permit Date: September 23, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 342681 | |||||
Electrical permit Date: December 15, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 247303 | |||||
Electrical permit Date: June 16, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 149898 | |||||
Suppression permit Date: October 9, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 99205 | |||||
Plumbing permit Date: October 21, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 243220 | |||||
Plumbing permit Date: February 28, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 133346 | |||||
Zoning/use permit Date: September 10, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 169635 | |||||
Mechanical permit Date: January 2, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 510506 | |||||
Electrical permit Date: August 5, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 704645 | |||||
Suppression permit Date: April 14, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 133215 | |||||
Zoning/use permit Date: November 9, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 245325 | |||||
Alteration permit Date: July 23, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 287360 | |||||
Alteration permit Date: August 5, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 229599 | |||||
Mechanical permit Date: March 26, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 592392 | |||||
Plumbing permit Date: January 31, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 53785 | |||||
Use permit Date: June 26, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 479812 | |||||
Mechanical permit Date: September 4, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 172650 | |||||
Plumbing permit Date: June 28, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 284819 | |||||
Zoning/use permit Date: July 2, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 404561 | |||||
Zoning/use permit Date: February 1, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 449154 | |||||
Mechanical permit Date: September 22, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 359772 | |||||
Mechanical permit Date: October 1, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 234640 | |||||
Fast form building permit Date: January 31, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 129903 | |||||
Alteration permit Date: February 7, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 53573 | |||||
Alteration permit Date: April 15, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 682684 | |||||
Zoning/use permit Date: January 24, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 51596 | |||||
Suppression permit Date: July 24, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 407510 | |||||
Sign permit Date: October 14, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 561545 | |||||
Plumbing permit Date: February 26, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 670752 | |||||
Suppression permit Date: August 12, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 296016 | |||||
Permit for the erection of three lte antennas, three gsm antennas, six rrhs (remote radio heads), three distribution boxes and two equipment cabinets for use as wireless services on an existing hospital with existing wireless services. Date: August 4, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Applicant: Neil Sklaroff, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: September 6, 2011 | Permit id: 15814 | |||||
Permit for the removal of one (1) accessory flat wall sign and for the erection of three (3) accessory signs on one building with existing other accessory signs as part of an existing hospital complex (size and location as shown in the application). Date: July 10, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Applicant: Robert D. Lane, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 21, 2013 | Permit id: 20874 | |||||
Permit for the erection of (14) signs accessory to an existing hospital campus with uses as previously approved and existing accessory parking and loading. Date: August 24, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Applicant: Robert D. Lane, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 9837 | |||||
Mechanical permit Date: October 25, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 299114 | |||||
Mechanical permit Date: June 17, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 610762 | |||||
Plumbing permit Date: July 15, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 164592 | |||||
Alteration permit Date: July 3, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 160143 | |||||
Electrical permit Date: June 12, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 609311 | |||||
Plumbing permit Date: March 31, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 207943 | |||||
Plumbing permit Date: December 21, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 647203 | |||||
Electrical permit Date: October 9, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 493307 | |||||
Electrical permit Date: January 12, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 49329 | |||||
Plumbing permit Date: February 26, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 670752 | |||||
Mechanical permit Date: August 14, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 480917 | |||||
Alteration permit Date: March 27, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 595877 | |||||
Suppression permit Date: October 7, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 566568 | |||||
Mechanical permit Date: January 2, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 510506 | |||||
Alteration permit Date: November 22, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 736213 | |||||
Alteration permit Date: October 15, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 240974 | |||||
Zoning use permit Date: September 10, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 169635 | |||||
Suppression permit Date: October 19, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 646087 | |||||
Zoning use permit Date: January 24, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 51596 | |||||
Plumbing permit Date: February 12, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 453163 | |||||
Electrical permit Date: November 25, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 569509 | |||||
Alteration permit Date: January 2, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 41487 | |||||
Electrical permit Date: June 11, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 396538 | |||||
Zoning use permit Date: August 3, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 222111 | |||||
Alteration permit Date: August 17, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 295748 | |||||
Zoning use permit Date: September 11, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 451291 | |||||
Plumbing permit Date: January 31, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 53785 | |||||
Zoning use permit Date: September 23, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 342681 | |||||
Suppression permit Date: August 2, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 711852 | |||||
Mechanical permit Date: October 1, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 234640 | |||||
Mechanical permit Date: August 19, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 163990 | |||||
Alteration permit Date: October 18, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 417332 | |||||
Alteration permit Date: August 8, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 354036 | |||||
Alteration permit Date: November 6, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 496614 | |||||
Electrical permit Date: July 22, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 163652 | |||||
Suppression permit Date: September 3, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 173543 | |||||
Administrative permit Date: November 1, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 111839 | |||||
Plumbing permit Date: October 1, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 564880 | |||||
Plumbing permit Date: September 2, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 360470 | |||||
Plumbing permit Date: June 28, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 284819 | |||||
Fast form building permit Date: January 31, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 129903 | |||||
Sign permit Date: October 14, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 561545 | |||||
Electrical permit Date: November 14, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 725920 | |||||
Demolition permit Date: May 10, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 690693 | |||||
Operations permit Date: November 5, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 19996 | |||||
Electrical permit Date: November 4, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 303383 | |||||
Electrical permit Date: December 15, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 247303 | |||||
Suppression permit Date: August 12, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 296016 | |||||
Electrical permit Date: October 21, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 363465 | |||||
Alteration permit Date: October 15, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 566954 | |||||
Administrative permit Date: March 17, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 518984 | |||||
Operations permit Date: July 10, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 9997 | |||||
Mechanical permit Date: October 14, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 361555 | |||||
Suppression permit Date: July 13, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 226252 | |||||
Suppression permit Date: July 29, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 485877 | |||||
Suppression permit Date: December 16, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Expired | Permit id: 373178 | |||||
Suppression permit Date: July 24, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 407510 | |||||
Plumbing permit Date: June 7, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 399257 | |||||
Sign permit Date: August 16, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 280728 | |||||
Suppression permit Date: October 9, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 99205 | |||||
Mechanical permit Date: June 7, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 399221 | |||||
Zoning use permit Date: July 2, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 404561 | |||||
Zoning use permit Date: February 1, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 449154 | |||||
Mechanical permit Date: March 31, 2016 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 670729 | |||||
Mechanical permit Date: January 27, 2017 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 754640 | |||||
Alteration permit Date: January 9, 2017 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Active | Permit id: 747993 | |||||
Zoning use permit Date: November 9, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 245325 | |||||
Use permit Date: June 26, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Permit id: 479812 | |||||
Permit for the removal of one (1) accessory flat wall sign and for the erection of three (3) accessory signs on one building with existing other accessory signs as part of an existing hospital complex (size and location as shown in the application). Date: July 10, 2013 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Applicant: Robert D. Lane, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 21, 2013 | Permit id: 20874 | |||||
Permit for the erection of three lte antennas, three gsm antennas, six rrhs (remote radio heads), three distribution boxes and two equipment cabinets for use as wireless services on an existing hospital with existing wireless services. Date: August 4, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Applicant: Neil Sklaroff, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: September 6, 2011 | Permit id: 15814 | |||||
Permit for the erection of (14) signs accessory to an existing hospital campus with uses as previously approved and existing accessory parking and loading. Date: August 24, 2009 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Applicant: Robert D. Lane, Esquire | Permit type: Appeal | Permit status: Granted/prov | Permit id: 9837 | |||||
SCORE 100 Renovate existing bathrooms no change in fixture counts or added load to prangle system. Included water closets, lavs, showers and sinks (health care) scope of work is continued from permit 564880 Date: February 26, 2016 Contractor: Pmc Mechanical Contractors Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 3, 2017 | Permit id: 670752 | |||||
SCORE 100 Install 139 plenum category 6a computer cables to 76-work station location - some locations get more than 1 cable longest run length 195 as per nec 2008 north district Date: April 19, 2017 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: July 11, 2017 | Permit id: 768171 | |||||
SCORE 100 No change in use and occupancy classification. Interior alterations to the 2nd floor to the cardiac catheterization lab (phase 5) and minor structural work as per approved plans. Date: August 21, 2017 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Active | Completion date: November 24, 2017 | Permit id: 804555 | |||||
SCORE 100 Install plumbing work and fixtures Date: August 27, 2009 Contractor: Fluidics Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 2, 2011 | Permit id: 231828 | |||||
SCORE 100 Relocate 37 sprinklersa on the 1st floor on the bldg if the emergency dept for intech construction. Hospital Date: August 12, 2010 Contractor: Oliver Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 296016 | |||||
SCORE 100 "interior demo and fitout" permit to include minor interior demolition and the installation of non combustible partitions, soffits, and ceilings to reconfigure an existing b use office space,accessible restroom, and create a new locker area. Separate permits required for plumbing, electrical, mechanical, and fire suppression work. Date: June 25, 2010 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: March 15, 2011 | Permit id: 285910 | |||||
SCORE 89 Interior alterations for linac installation, as per plans Date: September 22, 2009 Contractor: Turnkey Construction Serv Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: March 14, 2011 | Permit id: 234638 | |||||
SCORE 100 Hvac, including ductwork. Date: October 1, 2009 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Expired | Completion date: January 17, 2015 | Permit id: 234640 | |||||
SCORE 100 Fish jack existing cat5 plenum rated data cables longest run as per 2005 nec (north district) Date: September 3, 2009 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 14, 2009 | Permit id: 235375 | |||||
SCORE 98 Install 199- cat 6a and fiber backbone plenum cables between the floors... In accordance with 2008 nec (health care) Date: March 17, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 17, 2017 | Permit id: 756719 | |||||
SCORE 100 Relocate (25) existing sprinkler heads in order to accommodate tenant layouts as per nfpa no. 13 and local codes. No changes to exterior. Date: January 31, 2017 Contractor: A And S Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: March 9, 2017 | Permit id: 755751 | |||||
SCORE 95 For the installation of an automatic fire suppression system in accordance with nfpa 13 on existing second floor of the sley building. System to tie into existing fire suppression system installed within the buidling. Date: March 6, 2017 Contractor: Preferred Fire Protection Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Active | Completion date: October 30, 2017 | Permit id: 756210 | |||||
SCORE 98 Install 94- cat 6a and fiber backbone plenum cables between the floors... In accordance with 2008 nec (health care) Date: April 18, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: April 18, 2017 | Permit id: 756718 | |||||
For the erection of three antennas(not more than 15 feet in any one direction)erection of one(1) gps antenna, erection of equipment cabinet inside an existing shelter(size and location as shown on the application). For use as a wireless telecommunications facility in the same building with existing wireless telecommunications facility with other previously approved uses. Date: September 10, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 23, 2013 | Permit id: 169635 | |||||
SCORE 100 F&i 11-speaker strobe, 10-strobes, 20-smoke detectors & 21-pull stations as per nfpa 72 north district Date: January 15, 2016 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: January 15, 2016 | Permit id: 657569 | |||||
SCORE 96 Demolition of suspended ceilings & drywall partitions. Interior renovations as per attached plans. Date: February 6, 2013 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 451153 | |||||
SCORE 96 Selective demolition of gwb walls and doors (non bearing walls) floor finishes and ceiling (act) new finishes, 4 phased project as per plans. Date: January 2, 2013 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 443070 | |||||
SCORE 100 Add panel, update lighting, update branch power, add stub-up for tele data & replace f a devices as per nec 2008 & nfpa 72 Date: February 19, 2013 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: August 3, 2013 | Permit id: 445476 | |||||
SCORE 100 For selective interior demolition and for level ii alterations to an existing hopsital to include structural work, as per approved plans. Removal of asbestos required prior to commencement of work Date: November 22, 2016 Contractor: Hsc Builders And Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Active | Completion date: June 13, 2017 | Permit id: 736213 | |||||
SCORE 100 Relocate (5) sprinkler heads to conform with new ceilings per nfpa 13 requirements Date: October 27, 2016 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Active | Completion date: September 5, 2017 | Permit id: 732315 | |||||
SCORE 100 Interior demo and alterations, upgrades to finishses, new layout of existing space and use, structural work and modifications to framing for new roof and loading conditions, as per submitted plans. No changes to exterior windows, doors. Date: August 5, 2009 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 229599 | |||||
SCORE 100 Replace one wall hung lavatory Date: July 20, 2009 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 17, 2009 | Permit id: 227186 | |||||
SCORE 100 7 fixtures with piping for tower 1 emergency dept Date: September 16, 2010 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 20, 2015 | Permit id: 299934 | |||||
For the erection of a one (1) story lobby area and a three (3) story elevator (additions). Size and location as shown in the application. Additions to the korman research building with existing medical research as part of an existing hospital complex with existing uses, signage and parking as previously approved. No signs this permit. Date: October 27, 2010 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 23, 2013 | Permit id: 302636 | |||||
SCORE 100 Installation of water supply piping to fixtues, soil & waste piping from fixtures, 6 fl drains, 2 mop sinks, 2 wc, 7 lavs, 8 sinks (hospital) Date: August 6, 2013 Contractor: Jr Mcgee Plumbing Llc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 30, 2015 | Permit id: 481065 | |||||
SCORE 100 New office area 12 new lights switches receptacles and replace 2 panels per 2008 nec (health care facility) Date: March 5, 2013 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 5, 2013 | Permit id: 452619 | |||||
SCORE 100 Install 3 signs in accordance with the zoning approve plans and historical commission requirements Date: October 14, 2014 Contractor: Signage Unlimited Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Sign permit | Permit status: Completed | Completion date: December 14, 2015 | Permit id: 561545 | |||||
SCORE 92 Mechanical demo and alterations to existing system in conjunction with alterations renovations permit. New ductwork, diffusers, fan coil units in patient rooms bathrooms as per plans and schedules. Date: October 22, 2014 Contractor: Environmental Construction Srv Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 25, 2015 | Permit id: 564662 | |||||
SCORE 100 Furnish and install receptacles,5 gfci receptacles,12 2x4 fixtures,13 2x2 fixtures,6 sensors as per 2008 nec Date: June 29, 2011 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 9, 2011 | Permit id: 346690 | |||||
SCORE 100 Install 3 speaker strobes, 5 strobes, 8 smoke detectors & 2 doorholders. Date: November 23, 2010 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 8, 2010 | Permit id: 312410 | |||||
SCORE 98 Install 404- cat 6a and fiber backbone plenum cables between the floors... In accordance with 2008 nec (health care) Date: May 10, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: May 10, 2017 | Permit id: 756722 | |||||
SCORE 98 Install 24 cat-6a plenum cables between floors 1 & 2. Install plenum fiber backbone cable per 2008 nec (health care) Date: March 17, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 17, 2017 | Permit id: 756723 | |||||
SCORE 98 Install 89 cat-6a & fiber backbone plenum cables between the 5 floors per 2008 nec (health care) Date: April 18, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: April 18, 2017 | Permit id: 756724 | |||||
SCORE 98 Install 99 cat-6a & fiber backbone plenum cables between the 4th floors per 2008 nec (health care) Date: March 17, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 17, 2017 | Permit id: 756725 | |||||
SCORE 100 159 new recepts, 28 switches, 123 lights, 3 new electric panels and feeders, additional nurse call equipment as per 2008 nec (north district) Date: December 31, 2013 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: January 6, 2015 | Permit id: 509979 | |||||
SCORE 100 Install water & drain lines to serve sink & washer box (medical offices) Date: June 25, 2013 Contractor: Pmc Mechanical Contractors Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 8, 2015 | Permit id: 479544 | |||||
SCORE 100 Relocate 4 existing diffusers Date: June 25, 2013 Contractor: Pmc Mechanical Contractors Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 13, 2014 | Permit id: 479566 | |||||
SCORE 100 Fit out for dr office insluding 4-wc, 4-lav & 4-sink (medical office) Date: August 29, 2014 Contractor: E J Raith Mechanical Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 12, 2015 | Permit id: 558792 | |||||
SCORE 100 Install automatic sprinkler system on 5th floor and penhouse. Includes standpipe alterations. Date: December 18, 2009 Contractor: Majek Fire Protection, Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: February 7, 2012 | Permit id: 249495 | |||||
SCORE 100 Exterior signage as per plans. Date: August 16, 2010 Contractor: Signage Unlimited Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Sign permit | Permit status: Completed | Completion date: June 11, 2014 | Permit id: 280728 | |||||
SCORE 100 Fixture installation Date: October 21, 2009 Contractor: John Uebele Jr Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 22, 2010 | Permit id: 243220 | |||||
SCORE 100 For the erection of a double faced free standing ( # "t-4") directional sign with logo accessory to an , the erection of (30) free standing signs with no logo, the erection of (7) flat wall signs with no logo, the erection of (3) projecting signs with no logo, the erection of (3) free standing signs within the streets deptartment jurisdiction, size and location as shown in application. Signs all accessory to an existing hospital complex with existing uses, signage and parking as previously approved. Date: November 9, 2009 Contractor: Signage Unlimited Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 23, 2013 | Permit id: 245325 | |||||
SCORE 100 Installation of ductwork, mechanicals, piping and all incidental work. Date: June 7, 2012 Contractor: Pmc Mechanical Contractors Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 23, 2015 | Permit id: 399221 | |||||
SCORE 100 Renovations of waiting room locker room, lunch room and corridor for cath lab as part of hospital. Date: May 19, 2011 Contractor: Florkowski Builders Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 340642 | |||||
SCORE 100 Landscaping, site work for relocating outdoor sculptures for medical center. Date: June 29, 2011 Contractor: Intech Construction Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: November 1, 2012 | Permit id: 342203 | |||||
SCORE 100 New light fixtures (63),new exit signs (5), single pole switches (8),dimmers (2), new nurse call, new panels (2), transformer (1),duplex receptacles (82),seco job #1142, as per 2008 nec (north dist) Date: October 1, 2010 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 8, 2010 | Permit id: 303754 | |||||
SCORE 100 Install water & drain lines to serve water closet, lav,mop receptor and sinks for albert einstein hospital. Date: June 7, 2012 Contractor: Pmc Mechanical Contractors Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 3, 2015 | Permit id: 399257 | |||||
SCORE 100 Remove existing light fixtures, install new light fixtures, install new ats switch, install 3 new panels and feeders, support the installation of new specialized hospital equipment, install new receptacles, remove some existing fire alarm devices, install some new fire alarm devices Date: August 22, 2012 Contractor: J J White Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: November 5, 2012 | Permit id: 399873 | |||||
SCORE 100 Installing an automatic clean agent fire suppression system Date: September 30, 2015 Contractor: Suppression Systems Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 30, 2017 | Permit id: 634028 | |||||
SCORE 100 Hvac,including ductwork as per plans Date: October 25, 2010 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 13, 2014 | Permit id: 299114 | |||||
SCORE 100 Install 13 heat detectors, 7 monitor modules and tie into existing system as per nfpa72 (north district) Date: January 29, 2008 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: January 22, 2009 | Permit id: 126682 | |||||
SCORE 100 New lights, recepts, switches, panels no fire alarm work as per 2005 nec (north district) Date: February 1, 2008 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 2, 2009 | Permit id: 129388 | |||||
SCORE 100 Fast form building permit Date: January 31, 2008 Contractor: Oliver Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit status: Completed | Completion date: December 20, 2009 | Permit id: 129903 | |||||
SCORE 100 Furnish and install new smoke detectors, 2 door holders, 4 a v devices and 3 storbes as per nfpa72 (north district) Date: October 21, 2011 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: October 21, 2011 | Permit id: 363465 | |||||
SCORE 100 Relocate 39-existing plenum cat 5 cable to new location, fish-label-jack & test, install new cat 6 plenum cables for 6-work station as per nec 2008 north dist. Installation to comply with articles 300. 21, 300. 22 & 8 of the 2008 nec. Date: January 7, 2015 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: June 24, 2016 | Permit id: 571170 | |||||
SCORE 100 Hvac including ductwork & mechanical units with piping as per plans. (32) registers diffusers Date: August 4, 2010 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2012 | Permit id: 285981 | |||||
SCORE 100 Install category 5 computer wiring plenum rated , 34 stations as per 2008 nec Date: August 18, 2010 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: October 27, 2010 | Permit id: 291634 | |||||
SCORE 89 Alterations to include renovations to elevators and window replacement, as per plans Date: July 23, 2010 Contractor: Turnkey Construction Serv Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 287360 | |||||
SCORE 95 No new bulk, riser or feed main, new 2-1 2" crossmain, new 1-1 2" branchlines, 36 sprinklers. Date: February 11, 2015 Contractor: Preferred Fire Protection Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 580080 | |||||
SCORE 100 Install receptacles, light fixtures, switches, dimmers, panel, 45kva transformer & feeder per plans. Date: June 24, 2010 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 30, 2015 | Permit id: 282625 | |||||
SCORE 100 Installation of lavs, sinks, wc, ur, mr for the urology office space on the 3rd floor Date: January 21, 2014 Contractor: E J Raith Mechanical Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 15, 2015 | Permit id: 511091 | |||||
SCORE 100 Install plenum cat 5e computer cable to 51 work stations per 2008 nec (health care facility) see log installation to comply with articles 300. 21 & 8 of the 2008 nec. Date: March 5, 2014 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 21, 2014 | Permit id: 515134 | |||||
For the erection of twenty (20) antennas mounted on the roof of an existing structure and for the installation of accessory equipment within an existing penthouse structure. Size and location as shown on the application. For antennas and accessory equipment for use as a wireless service in the same building and lot as an existing wireless services facility and an existing hopsital complex with uses as previously approved. Date: January 24, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 23, 2013 | Permit id: 51596 | |||||
SCORE 100 Relocate(3) sprinkler heads on walls and ceiling as part of hospital Date: September 30, 2011 Contractor: Majek Fire Protection, Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 366072 | |||||
SCORE 100 Convert existing dry standpipe to wet for hospital as per plans. Date: December 16, 2011 Contractor: Simplexgrinnell Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: December 17, 2012 | Permit id: 373172 | |||||
SCORE 100 2 toilets, 2 lavs, 7 sinks, 1 mop sink, 1 washer outlet box, and 2 floor basins(hospital) Date: July 6, 2012 Contractor: Joseph Rosati Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 28, 2015 | Permit id: 412253 | |||||
SCORE 67 Interior renovations to 3rd floor hospital as per plans Date: January 2, 2007 Contractor: W G Hinman Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: May 2, 2007 | Permit id: 41487 | |||||
Erect 3 antennas, erect accessory equipment Date: October 18, 2012 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: February 23, 2016 | Permit id: 417332 | |||||
SCORE 100 Remove communication wire, pull all exist re-usable cat 5 plemum phone comp wire up into ceil, after new walls built fish exist down walls plus add new wire for 11 work stations as per nec 2008 (health fac) Date: August 24, 2012 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: September 27, 2013 | Permit id: 416083 | |||||
SCORE 100 Demolition and installation of ductwork and mechanicals including vavs, ductwork modifications, registers diffusers, exhaust fan and related piping Date: September 22, 2011 Contractor: Dwd Mechanical Contractor Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 13, 2014 | Permit id: 359772 | |||||
SCORE 100 Install plenum cat 5 cable for phones and computeres, to 104 work station locations as per 2005 nec (north dist) Date: December 15, 2009 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: June 28, 2010 | Permit id: 247303 | |||||
SCORE 100 Move existing cat 5 cable to new locations to match new wall layouts, approximately 31 locations, as per 2005 nec (north dist) Date: December 15, 2009 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: June 16, 2010 | Permit id: 247304 | |||||
SCORE 100 Furnish & install new receptacles & switches & lights for new pre-opp recovery area as per nec 2008 north district Date: November 13, 2015 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 25, 2016 | Permit id: 644950 | |||||
SCORE 100 Alterations to an existing mechanical system as per approved plans. Work to include new registers diffusers, supply exhaust ductwork, and all other associated work. Date: December 14, 2015 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 2, 2017 | Permit id: 645465 | |||||
SCORE 100 Relocate 43 sprinkler heads to conform with new ceilings Date: October 19, 2015 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: May 11, 2016 | Permit id: 646087 | |||||
SCORE 100 Relocate three (3) sprinkler heads Date: July 13, 2009 Contractor: Oliver Sprinkler Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: February 9, 2010 | Permit id: 226252 | |||||
SCORE 100 Provide lighting fixtures, provide 1 circuit breaker 2 enclosed breakers, provide raceways to cabling, provide devices as per 2005 nec (north dist) Date: August 4, 2009 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 226957 | |||||
SCORE 100 Interior alterations as per plans. Date: August 17, 2010 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 295748 | |||||
SCORE 100 F & i new switches, recpts, lgts & 4-new jpanels for new offices & waiting room as per nec 2008 (hospital) Date: July 26, 2013 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: March 26, 2014 | Permit id: 481185 | |||||
SCORE 100 Furnish & install new lights, switches & receptacles as per nec 2008 north district Date: May 26, 2015 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 605302 | |||||
SCORE 100 Rough and finish plumbing to 1 wc, 3 lavs and 7 exam sinks (all work to comply with the 2004 ppc) Date: May 26, 2015 Contractor: Joseph Rosati Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 606348 | |||||
SCORE 100 Furnish and install new strobes, smoke detectors, a v devices adn nac panel as per 2008 nec and nfpa 72. (north district) Date: June 12, 2015 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 609311 | |||||
SCORE 93 For alterations to an existing hvac mechanical system to include new return and supply registers diffusers grilles and associated ductwork. Date: June 17, 2015 Contractor: Allstates Mechanical Ltd Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 21, 2016 | Permit id: 610762 | |||||
SCORE 99 For level ii alterations to an existing health facility to include expansion of the existing pharmacy to create a new reception area and new drug distribution area. Alterations to include the erection of partition walls, provide finishes and furnishings throughout. All work to be done per approved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for all other work. Date: June 19, 2015 Contractor: Wm Steele And Sons Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: August 29, 2015 | Permit id: 613364 | |||||
SCORE 95 Relocate 38 existing sprinkler heads(commercial) Date: June 1, 2015 Contractor: Preferred Fire Protection Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 614030 | |||||
SCORE 100 Install plenum cat5e cable to 31 stations, approximately 1 3 of cable are existing and being reused as per nec 2008 (health care facility) north district Date: July 2, 2015 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: January 25, 2016 | Permit id: 614529 | |||||
SCORE 100 Install cat 5e plenum computer wire to 45- work stations.. Length- 200.... In accordance with 2008 nec (hospital) Date: February 15, 2017 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 8, 2017 | Permit id: 757922 | |||||
SCORE 100 Mackin borg clinic 2nd floor - aka 1100-1348 tabor road - furnish and install luminaires, switches, receptacles and panels per plans - all work will be in compliance with the 2008 nec and the approved plans Date: September 24, 2014 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 8, 2015 | Permit id: 559022 | |||||
SCORE 100 3rd & 4th floors - interior electrical alterations - furnish and install luminaires, switches, receptacles and panel per plans - all work will comply with the 2008 nec and the approved plans Date: September 24, 2014 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 8, 2015 | Permit id: 559023 | |||||
SCORE 100 Water meter reductions: tower building, lifter building, levey building, hagenburg building Date: October 8, 2008 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 30, 2008 | Permit id: 181437 | |||||
SCORE 88 Upgrade wiring to #6 and breaker from amp to amp... In accordance with 2008 nec Date: December 17, 2012 Contractor: Hunter Electric Llc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: August 17, 2013 | Permit id: 441980 | |||||
SCORE 100 Black iron exhaust ductwork Date: September 4, 2008 Contractor: Edward B Oreilly And Assoc Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 9, 2010 | Permit id: 172650 | |||||
SCORE 100 3 commercial kitchen fire suppression systems; 1-ansul r-102 3gal; 1-ansul-r-102 3 gal; 1-ansul-r-102-4. 5 gal Date: September 3, 2008 Contractor: Atlantic Fire Equipment Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: August 11, 2009 | Permit id: 173543 | |||||
SCORE 100 Renovations to existing cafeteria, 9 sinks, 8 floor drains Date: July 15, 2008 Contractor: John Uebele Jr Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 16, 2008 | Permit id: 164592 | |||||
SCORE 100 Furnish and install new audio strobe, strobe, smoke detectors, booster panel and duct detector per nfpa 72 (health care) Date: February 10, 2017 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: March 8, 2017 | Permit id: 748246 | |||||
SCORE 100 F&i new lights and relocate existing lights, new receptacles & sensors to existing panels. Date: February 17, 2017 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: March 8, 2017 | Permit id: 749781 | |||||
SCORE 100 Replacing toilets,faucets,sinks and showers-the installation will comply with the philadelphia plumbing code 2004 Date: April 1, 2015 Contractor: West Chester Mechanical Contr Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 27, 2016 | Permit id: 593138 | |||||
SCORE 100 Interior alterations ,interior demo and renovations of existing hospital space, new partitions, bathrooms, ceilings, floor layout, as indicated per plans. Additional permits req; for meps. Date: March 27, 2015 Contractor: P Agnes Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 27, 2016 | Permit id: 595877 | |||||
SCORE 100 For the installation of fire suppressions system on 2nd floor to tie into existing fire supression system in accordance with nfpa 13 as per approved plans. Date: May 27, 2015 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 601520 | |||||
SCORE 100 Furnish and install new lighting fixtures and recepts in patient rooms as per 2008 nec (north district) Date: April 20, 2015 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 3, 2015 | Permit id: 597374 | |||||
SCORE 100 Amend ap # 509979 to add fire alarm system , 7 smoke detectors, 7 horn strobes and new head end fire alarm panel as per nfpa72 (north district) Date: March 17, 2014 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Administrative permit | Permit status: Completed | Completion date: February 26, 2016 | Permit id: 518984 | |||||
Removal of existing telecommunication equipment from rooftop & placement of new wireless equipment in a leased area 25x 25in the penthoyse area of a existing structure. Date: February 7, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 53573 | |||||
SCORE 91 Install 2 water closets, 2 floor drain, 1 open site, 2 showers, 2 sinks and 2 lavs Date: January 31, 2007 Contractor: Alexander Chernoff Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 13, 2007 | Permit id: 53785 | |||||
SCORE 96 Selective demolition (ceilings, drywall partitions, flooring, interior renovation (drywall partitions, flooring, act ceiling & finishes Date: August 19, 2014 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: January 17, 2017 | Permit id: 541188 | |||||
SCORE 100 Level ii interior alterations (no change of occupancy) to second floor pre-procedure and recovery areas for cardiac catheterization labs as part of existing high-rise hospital building as per approved plans and pah doh approvals. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: October 28, 2015 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: May 11, 2016 | Permit id: 643146 | |||||
SCORE 100 Install light fixtures, branch circuits and devices limited demolition per 2008 nec (health care facility) Date: July 16, 2013 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: October 3, 2013 | Permit id: 476944 | |||||
SCORE 95 Relocate 49 fire sprinklers for new wall ceiling layouts Date: January 31, 2014 Contractor: Preferred Fire Protection Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 517762 | |||||
SCORE 100 Construction of elevator shaft and minor renovations to existing lobby. Construction of new handicap ramp for hospital. Date: July 22, 2011 Contractor: Florkowski Builders Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 349020 | |||||
SCORE 100 New service for elevator and lights for lobbie as per 2008 nec Date: July 8, 2011 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: August 8, 2012 | Permit id: 348315 | |||||
SCORE 100 Fixture installation Date: March 25, 2008 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 12, 2010 | Permit id: 136617 | |||||
Install video camera & equipment on exterior as per plans axis 233d camera, videoalarm pendant mount,power box, secondary power box and alvarion subscriber unit Date: March 26, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: February 9, 2010 | Permit id: 139580 | |||||
SCORE 100 F&i new 200amp 480v panel, 75kva transformer, 208 120volt 3 phase 4w panels, new lts, switches, recepts as per 2008 nec(hospital) Date: July 19, 2012 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 5, 2012 | Permit id: 408411 | |||||
SCORE 100 7 11 08 - tent erected on site for event Date: July 10, 2008 Contractor: Select Event Rentals Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Operations permit | Permit status: Completed | Permit id: 9997 | |||||
SCORE 92 3rd & 4th floor plumbing renovations - albert einstein medical center - renovations of existing bathrooms - no change in fixture counts or additional load to the drainage system (no plans required) - relocate and replace existing (88)fixtures Date: October 1, 2014 Contractor: Environmental Construction Srv Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 25, 2016 | Permit id: 564880 | |||||
SCORE 100 For selective interior demolition and for level ii alterations to an existing hopsital to create an accessible toilet room as shown in department of health approved plans. Separate plumbing & mechanical permits required. Date: October 15, 2014 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2015 | Permit id: 566954 | |||||
SCORE 100 Relocate sprinkler heads - ground floor - willow crest wing Date: November 21, 2012 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: July 30, 2015 | Permit id: 439236 | |||||
SCORE 100 For the demolition and intallation of a mechanical system as per plans on the first floor of an existing building. Date: November 19, 2012 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 10, 2015 | Permit id: 434492 | |||||
For alterations to an existing mri suite to include rooftop alterations, new wall floor ceiling finishing, new interior wall partition installations, structural framing for equipment support. (iebc 2009, compliance path: work-area method, lvl ii alterations) separate permits required for plumbing, electrical, mechanical, and fire suppression system alterations. Date: October 13, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 637385 | |||||
SCORE 100 Hvac installation,including ductwork, for toilet room as per plans Date: December 1, 2014 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 5, 2015 | Permit id: 575982 | |||||
SCORE 100 Demo 2 walk-in cooler boxes re-use exist feeders & hook up new condenser & fan blowers demo exist 2x4 fluorescent lit fixtures & replace w t8-energy efficient 2x4 parabolic lit fixtures relocate exist amp receptacle to new location per 2008 nec (health care) Date: September 14, 2012 Contractor: Current Electrical Solutions Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: September 14, 2012 | Permit id: 427384 | |||||
SCORE 100 Interior demo and alterations, renovations, structural modifications and work, millwork, new finishes, new partitions,floor reconfiguration and fit out for pulmonary suite, and exterior roof structural work. Addl permits req: electrical, plumbing, hvac, sprinklers. Date: August 19, 2014 Contractor: Canuso Jorden Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: May 2, 2015 | Permit id: 553066 | |||||
SCORE 100 Install 1-sink, install condensate drain for 2-hvac units & install 1-medical gas outlet (oxygen Date: June 8, 2015 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 15, 2017 | Permit id: 615779 | |||||
SCORE 100 Alterations to an existing hvac system to include new return and supply registers diffusers grilles and associated ductwork for ct room 102 as per approved plans. Date: July 3, 2015 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 615181 | |||||
SCORE 100 Re-locate 42 sprinkler heads Date: June 24, 2015 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: September 11, 2015 | Permit id: 620017 | |||||
SCORE 100 Moving existing stacks out of new door ways opening. Remove one wall hung sink. Date: June 25, 2015 Contractor: Kevin Mcginn Plumbing And Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 29, 2015 | Permit id: 620279 | |||||
SCORE 100 Install plenum cat 5e phone & computer wire to 59 work station locatiions most cables existing to be reused install new as needed to fulfill customer requirments as per nec 2008 north district Date: August 25, 2015 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: August 25, 2015 | Permit id: 622058 | |||||
SCORE 100 For use as group medical, dental and health practitioner office on the third floor of the moss building in an existing detached structure. Date: June 26, 2013 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Use permit | Permit status: Completed | Completion date: November 23, 2013 | Permit id: 479812 | |||||
SCORE 81 Installation of hvac as per plan. Date: October 1, 2009 Contractor: Jack Arkin Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 15, 2011 | Permit id: 231812 | |||||
SCORE 100 Install 4 smoke detector. Install 2 relay modules, install 3 supervised module as per nfpa72 Date: October 6, 2015 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: March 16, 2016 | Permit id: 636215 | |||||
SCORE 100 Furnish and install ductwork grds total of 108 mechanical piping insulation, automated controls, balancing, two energy recovery units, two cabinet unit heaters and variable refrigerant system consisting of the following nine inline ahus twenty ceiling cassette ahus and two exterior mounted heat pumps as per plans. Date: August 14, 2013 Contractor: Limbach Company Llc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 26, 2016 | Permit id: 480917 | |||||
SCORE 100 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: January 27, 2017 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 9, 2017 | Permit id: 754640 | |||||
SCORE 100 Level ii interior alterations (no change of occupancy) for renovations to existing outpatient cardiology suite on the 3rd floor of moss building as per approved plans and pa doh approval. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: January 9, 2017 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: March 8, 2017 | Permit id: 747993 | |||||
SCORE 100 Installing 1 sump pump in elevator pit Date: July 7, 2011 Contractor: Fluidics Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 351424 | |||||
SCORE 96 For interior demolition of partition walls & for a partial change of occupancy classification w. Level ii alterations within an exist. Medical complex to create outpatient urology suite & for erection of partitions for waiting, conference, examination, procedure, & toilet room spaces; work area is fully sprinklered. All permitted work in accordance with plans approved by phc dated 11. 21. 13 & scope of work approved by cmmnwlth of pa doh dated 08. 22. 13. Asbestos abatement to be completed prior to commencement of permitted work. Date: December 19, 2013 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: August 25, 2016 | Permit id: 507620 | |||||
SCORE 100 Alterations: interior plumbing;outpatient cardiology suite on the 3rd floor of moss building - the installation will compy with the philadelphia plumbing code 2004 Date: February 22, 2017 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 8, 2017 | Permit id: 755508 | |||||
SCORE 100 11 3 09-erection of (1)-30x assembly use tent to be used for additional space for treating h1n1 patients Date: November 5, 2009 Contractor: Knight Enterprises Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Operations permit | Permit status: Completed | Permit id: 19996 | |||||
SCORE 100 Hvac Date: August 19, 2008 Contractor: Edward B Oreilly And Assoc Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 13, 2014 | Permit id: 163990 | |||||
SCORE 100 9 horn strobe, 6 door held, 1 pull station, 5 tri module as per nfpa72 (north district) Date: August 22, 2008 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: October 9, 2008 | Permit id: 169654 | |||||
For alterations to an existing hvac mechanical system to include new exhaust ventilation piping for cryogenic gas ventilation, new ductwork to include diffusers registers grilles, packaged rooftop air conditioning units, condenser units, and insulated refrigerant piping installation. (see mechanical plans under ap#637385.) Date: October 13, 2015 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 28, 2016 | Permit id: 640008 | |||||
SCORE 100 Interior plumbing alteration work to health care facility. The installation will comply with the philadelphia plumbing code 2004 Date: December 21, 2015 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 11, 2016 | Permit id: 647203 | |||||
SCORE 67 Install empty electrical raceway for new mri equipment. Install new lights, wire new hvac equipment install new sub panel 100a 480v per 2008 nec (health care facility) Date: November 10, 2015 Contractor: Coolidge Electric Llc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: November 10, 2015 | Permit id: 647454 | |||||
SCORE 100 Provide branch power and lighting,provide panels,light fixtures and provide nurse call and replace devices on existing fire alarm per 2008 nec & nfpa 72 (health care facility) Date: January 17, 2014 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 22, 2014 | Permit id: 511022 | |||||
SCORE 86 For the installation of an hvac system (to tie into existing system) throughout 12 rooms in an existing hospital. Work to include registers diffusers, exhausts, and supplemental ductwork as shown in approved plans. All work to be performed in accordance with plans approved by philadelphia historical commission 02. 18. 16) Date: March 31, 2016 Contractor: Pmc Mechanical Lp Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 20, 2016 | Permit id: 670729 | |||||
Amend permit #99205 to downsize the fire pump due to low flow condition. Date: November 1, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Administrative permit | Permit status: Completed | Completion date: August 5, 2009 | Permit id: 111839 | |||||
Interior renovations to the labor and delivery program as per plans Date: January 18, 2008 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: December 11, 2009 | Permit id: 125061 | |||||
SCORE 100 Remove and replace 6 antennas, install 3 lines of outedoor rated fiber optic cables #1ph6461b as per 2008 nec(cell site)(north dist) Date: July 24, 2012 Contractor: Landair Wireless Ltd Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: July 24, 2012 | Permit id: 418132 | |||||
SCORE 100 Renovation of single bathroom,2 light fixture,1 gfi receptacles,2 switches and 1 fire strobe and 1 nurse call pull station per 2008 nec & nfpa 72(health care facility) Date: November 25, 2014 Contractor: Mirarchi Brothers Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: March 11, 2015 | Permit id: 569509 | |||||
SCORE 100 Move existing plenum cat 5 computer cables to 11 new work stations as per 2008 new Date: September 8, 2011 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 17, 2012 | Permit id: 361552 | |||||
SCORE 96 Level ii interior alterations (no change of occupancy) to ground floor linear accelerator room as part of existing high-rise hospital building (levy building) as per approved plans and pah doh approvals. Existing building fully sprinklered. Separate permits required for any mep or fire suppression work Date: October 20, 2016 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Expired | Completion date: December 29, 2016 | Permit id: 728327 | |||||
SCORE 100 Install drain & water lines to new toilet, lav, and sink (connect to existing service inside the building) Date: February 12, 2013 Contractor: Pmc Mechanical Contractors Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 24, 2015 | Permit id: 453163 | |||||
SCORE 100 Alterations of existing system, installation of new piping,heads, lines connecting to existing main. Date: February 27, 2014 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 520209 | |||||
SCORE 100 Install plenum cat 5 computer and phone wire to 49 location per 2008 nec. Installation to comply with articles 300. 21 & 8 of the 2008 nec. Date: May 29, 2014 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: June 24, 2016 | Permit id: 526841 | |||||
SCORE 100 Interior renovations Date: July 3, 2008 Contractor: Intech Construction Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: October 7, 2008 | Permit id: 160143 | |||||
SCORE 89 Install (15) switches, (119) duplex receptacles, (81) lt fixtures, (6) exit signs, (7) exhaust fans, (2) supply fans, replace (4) existing panels, no fire alarm work, all as per 2005 nec (north dist) Date: July 22, 2008 Contractor: Shelly Bruce D Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: October 9, 2008 | Permit id: 163652 | |||||
SCORE 100 Building maintenance, replace existing 2x4 & 2x2 lights with new. Install new cover plates on all devices, replace any damaged or discolored devices, replace 1 defective light switch and possibly install 1 new switch. Add emergency battery ballast to 4 lights as per 2005 nec (north district) Date: May 30, 2008 Contractor: Raff Electric Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: May 30, 2008 | Permit id: 155275 | |||||
SCORE 100 Water distribution line w bypass and 2 rpzs Date: March 31, 2009 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 207943 | |||||
SCORE 100 Relocate and replace 12 fixtures, add 15 recepts, and 4 tele data stub ups as per 2005 nec (north district) Date: May 22, 2009 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 14, 2009 | Permit id: 211629 | |||||
SCORE 99 Interior alterations for non load bearing assemblies including floor, wall, and ceilings in an existing medical suite. Electrical, plumbing, mechanical, and fire suppression work requires additional permits. Call the inspector prior to starting work. Date: September 30, 2011 Contractor: Wm Steele And Sons Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: December 17, 2012 | Permit id: 364991 | |||||
SCORE 100 Electrical alterations in an office space & pharmacy - relocate existing luminaires and receptacles to accomodate the new design layout - furnish and install new luminaires and receptacles per the approved plan and the 2008 nec - all circuits are existing Date: August 14, 2015 Contractor: Electracom Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 5, 2015 | Permit id: 615263 | |||||
SCORE 100 New panel, lights, sws, recepts in offices and exam rooms. (radiology dept). (north dist) Date: April 9, 2008 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: September 2, 2008 | Permit id: 139628 | |||||
SCORE 100 Relocation of existing sprinkler heads to accomodate new ceilings - 22 sprinkler heads on the 4th floor, 4 heads on the 3rd floor. Date: January 16, 2013 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 448455 | |||||
SCORE 100 Before demo pull all existing cat5 phone & computer wire to safe location, reinstall existing wire to new locations at approx 45 stations as per nec 2008. Installation to comply with articles 300. 21, 300. 22 & 8 of the 2008 nec. Date: May 13, 2015 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 2, 2015 | Permit id: 601598 | |||||
SCORE 99 Install fiber optic line in existing conduit per 2008 nec (health care facility) Date: September 6, 2013 Contractor: Skinner And Cook Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: April 14, 2014 | Permit id: 493244 | |||||
SCORE 100 Hospital grade recepts (35), hosptial grade recepts gfi (3), lgiht fixtures (29), single pole switches (11), electrical panel (1), no fire alarm on project Date: January 12, 2007 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 3, 2007 | Permit id: 49329 | |||||
SCORE 100 Install plenum cat 5e computer wire to 86 station as per nec 2008. Installation to comply with articles 300. 21 & 8 of the 2008 nec. Date: October 9, 2013 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: May 21, 2014 | Permit id: 493307 | |||||
SCORE 100 Level ii alterations on 3rd floor of moss building to include partial change of occupancy to outpatient medical offices as per approved plans. Date: June 26, 2013 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: March 5, 2014 | Permit id: 477239 | |||||
SCORE 96 Ez interior demolition - for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 10, 2016 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Demolition permit | Permit status: Completed | Completion date: December 3, 2016 | Permit id: 690693 | |||||
SCORE 100 Hvac, including ductwork and mechanical equipment, as per plans. Date: January 2, 2014 Contractor: Ramm Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 8, 2015 | Permit id: 510506 | |||||
SCORE 100 Furnish & install 1-wc, 1-lav, 6-exam room sink, 1-scrub sink, 1-flushing sink & 1-mop sink (medical center) Date: January 8, 2014 Contractor: Lormar Mechanical Services Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 30, 2015 | Permit id: 509414 | |||||
SCORE 100 For the installation of a fire suppression system tied into an existing system on the 3rd flr of an existing structure, in conformance with nfpa 2007, standard 13, with a service line of 6-in diameter. Date: January 15, 2014 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 20, 2015 | Permit id: 499698 | |||||
SCORE 100 Tower 3 restroom - relocation 3 sprinkler heads Date: January 15, 2015 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 16, 2015 | Permit id: 584868 | |||||
SCORE 100 Extend normal and emerg power to new fire pump to replace existing system (north distrist) Date: October 22, 2007 Contractor: William Lex Jr Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: October 22, 2007 | Permit id: 104593 | |||||
SCORE 100 Install plenum cat5e cable for 58 workstations per 2008 nec (health care) Date: December 30, 2015 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: December 30, 2015 | Permit id: 654994 | |||||
SCORE 100 Install lights, switches, receptacles &feeders to new ct equipment as per nec 2008 north district Date: August 26, 2015 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 16, 2016 | Permit id: 628126 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 11, 2015 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 631343 | |||||
SCORE 100 For the erection of (14) signs, size and location as shown in application. Signs accessory to an existing hospital campus with existing uses as previously approve and existing accessory parking. Date: August 3, 2010 Contractor: Signage Unlimited Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 23, 2013 | Permit id: 222111 | |||||
SCORE 100 F& i new fire alarm strobes on 3rd & 4th floor (health care) as per nec 2008 & nfpa 72 Date: December 12, 2014 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: June 23, 2017 | Permit id: 571815 | |||||
SCORE 100 Furnish & install duct detectors,7 visual and 2 av per 2008 nec & nfpa 72(health care facility Date: December 12, 2014 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 3, 2015 | Permit id: 572857 | |||||
SCORE 100 Renovation to existing elevator machine room. Include related work: installation of air cooled system. Relocate existing ventilation duct Date: August 9, 2011 Contractor: Fluidics Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: March 25, 2014 | Permit id: 351441 | |||||
Interior demo & alterations to gi suite . Date: August 8, 2011 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 354036 | |||||
SCORE 100 Install new elevator with fire alarm elevator recall as per nfpa72 (north district) Date: September 9, 2011 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: September 9, 2011 | Permit id: 357928 | |||||
SCORE 73 Interior renovations to 2nd and 3rd floor in existing korman research building per plans. Date: October 15, 2009 Contractor: Elizabeth Pisano Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 22, 2010 | Permit id: 240974 | |||||
SCORE 100 1)install new light fixtures (180) 2) install new switching 3) install duplex receptacle (89) 4) electric panels (2) seco # 98 as per 2005 nec (north district) Date: October 21, 2009 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 243161 | |||||
SCORE 96 Partial interior demolition of non-bearing elements on the third floor of an existing hospital complex as shown in approved plans by philadelphia historic commission (09. 24. 2013) and in accordance with department of health letter. Alterations to be performed under permit #477239. Date: November 6, 2013 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 496614 | |||||
SCORE 96 Level ii interior alterations (no change of occupancy) to existing ct room 102 in levy building of existing hospital complex as per approved plans. Separate permits required for any mep or fire suppression work Date: June 11, 2015 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: November 18, 2016 | Permit id: 602649 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: October 25, 2017 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Active | Completion date: October 25, 2017 | Permit id: 826796 | |||||
SCORE 100 Installation of new hvac system on the 2nd floor for the cardiac catheterization lab (phase 5). All work to be done in accordance with approved plans. Date: November 29, 2017 Contractor: Chadwick Service Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 827241 | |||||
SCORE 100 Install a 2 amp service for the relocated verizon equipment, ground all relocated equipment. (north dist) Date: August 15, 2007 Contractor: Carr And Duff Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: January 24, 2008 | Permit id: 89580 | |||||
SCORE 95 Interior alterations to cardiac catheterization lab, as per plans Date: April 25, 2012 Contractor: Skanska Usa Building Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: December 17, 2012 | Permit id: 395251 | |||||
SCORE 100 Installation of sanitary waste and vent piping, installation of water supply piping, installation of fixtures Date: June 28, 2010 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 16, 2011 | Permit id: 284819 | |||||
SCORE 100 New ductwork within renovated space. New system to connect to existing system. Date: March 15, 2013 Contractor: Pmc Mechanical Contractors Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Expired | Completion date: March 31, 2016 | Permit id: 453171 | |||||
SCORE 100 Relocate sprinkler heads Date: July 29, 2013 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 485877 | |||||
SCORE 100 Remove tile on roof and underlayment. Replace with new tile as per plans install ice shield ludowici tile to match existing -clay red original color new pipe vent work to be done at the direction of the historical commission Date: August 11, 2008 Contractor: Belcher Roofing Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: February 19, 2010 | Permit id: 170230 | |||||
SCORE 100 Alteration: interior plumbing for a fit-out of the 2nd floor of an existing hospital endoscopy unit. The installation will comply with the philadelphia plumbing code, 2004. Medical gas vacuum piping and equipment is not part of this permit. Date: February 7, 2017 Contractor: West Chester Mechanical Contr Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Active | Completion date: August 11, 2017 | Permit id: 742309 | |||||
SCORE 100 Installation of hvac system to second floor and basement of the sley building as per approved plans. Date: February 15, 2017 Contractor: West Chester Mechanical Contr Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Active | Completion date: October 10, 2017 | Permit id: 741915 | |||||
SCORE 100 Renovation 7th floor replace lights, receptacles, & replace 2-old panel interior & 1-sub-panel as per nec 2008 (health care facility) Date: June 12, 2015 Contractor: Raff Electric Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 605139 | |||||
SCORE 100 Replace fire alarm system with new (north dist) Date: June 25, 2007 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 13, 2009 | Permit id: 72316 | |||||
SCORE 100 Install plenum cat 5e phone & computer cabling to 17 work stations, drops with 2 being the longest run as per 2008 nec (north district) Date: November 14, 2016 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 25, 2016 | Permit id: 725920 | |||||
SCORE 86 Install 2 2" conduit from ppl cabinet to 2 dish below roof line. (north dist) Date: April 11, 2007 Contractor: Dennis Bradley Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: February 28, 2008 | Permit id: 67952 | |||||
SCORE 99 Install sprinkler system Date: October 9, 2007 Contractor: Northstar Fire Protection Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: August 5, 2009 | Permit id: 99205 | |||||
SCORE 100 Relocate 22 sprinkler heads (4th floor) Date: February 28, 2013 Contractor: Fire Protection Industries Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: October 11, 2014 | Permit id: 454175 | |||||
SCORE 100 Add 3 horn strobes as per 2008 nec & nfpa 72 (health care facility) Date: March 27, 2013 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 455040 | |||||
SCORE 100 Relocation of existing heads to accomodate new ceilings, 8 sprinkler heads Date: May 21, 2013 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: August 19, 2015 | Permit id: 472698 | |||||
SCORE 100 Install plenum cat5e phone & computer wire for 14 workstations approx half will be new cables & the other half reuse of existing as per nec 2008 north district (health care) Date: August 25, 2015 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: October 3, 2015 | Permit id: 622696 | |||||
SCORE 89 Install 1 single pole switch, install 7 duplex receptacles, install 9 double duplex receptacles, install 3 gfci receptacle install 9 new light fixtures,install 4 new existing 4 new exist signs,install pull cord and 2 dome lights as per 2008 nec Date: September 23, 2011 Contractor: Shelly Bruce D Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 7, 2011 | Permit id: 362007 | |||||
SCORE 100 Supply and installation of hvac runouts from existing mains ductwork Date: October 14, 2011 Contractor: Chadwick Service Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 17, 2012 | Permit id: 361555 | |||||
SCORE 100 Install eleven (11) fixtures Date: September 2, 2011 Contractor: Dwd Mechanical Contractor Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 7, 2015 | Permit id: 360470 | |||||
SCORE 100 Furnish & install new liths, switches, recepts & power feeder for cath lab equipment and iso panel as per 2008 nec (north district) Date: November 22, 2017 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Active | Completion date: November 22, 2017 | Permit id: 825600 | |||||
SCORE 100 For level ii alterations to an existing building for use as a health facility. Alterations to include the removal installation of registers, diffusers and mechanical equipment with associated ductwork. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for electrical work. Date: March 26, 2015 Contractor: West Chester Mechanical Contr Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 13, 2016 | Permit id: 592392 | |||||
SCORE 100 Installation of electrical panels, transformers, disconnect switches and amp 5 wire receptacles as per plans in the existing kitchen area, install rj45 jacks, all as per 2008 nec (north dist) Date: November 4, 2010 Contractor: Current Electrical Solutions Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: November 4, 2010 | Permit id: 303383 | |||||
SCORE 95 Relocate 87 fire sprinklers to accomodate new wall and ceiling changes Date: October 7, 2014 Contractor: Preferred Fire Protection Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 566568 | |||||
SCORE 100 Fixture installation Date: February 28, 2008 Contractor: Fluidics Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 5, 2009 | Permit id: 133346 | |||||
SCORE 96 Selective demolition and interior renovations of existing office space, upgrades to finishes, millwork, flooring, interior doors and non load bearing partitions, floor reconfiguration. No changes in use occupancy classification. Building fully sprinklered. Limited scope of mechanical alterations : re-ducting existing vav boxes. Additional permits req: electrical, plumbing, hvac, sprinklers. Date: June 19, 2013 Contractor: Dupuy Construction Service Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 476144 | |||||
SCORE 100 Level ii interior alterations to fit out interventional radiology suite in existing hospital as per approved plans and doh approvals. Separate mep permits required Date: December 2, 2013 Contractor: Canuso Jorden Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: March 27, 2015 | Permit id: 505516 | |||||
SCORE 83 60amp breakers that have been upgraded to 100amp breakers keeping the existing babinets and swapping out the old antennas to air-21 antennas Date: November 5, 2013 Contractor: Ja Lee Electric Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: November 5, 2013 | Permit id: 504432 | |||||
SCORE 100 Level ii alterations to include interior demo and renovations to existing space,as per drawings. Date: February 19, 2015 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2015 | Permit id: 584793 | |||||
SCORE 100 Level ii interior alterations (no change of occupancy) to existing patient rooms and nurses station med room on 7th floor of an existing hospital to include incidental 6th floor work to 7th floor ceiling assembly as per approved plans and pa doh approvals. Separate permits required for mep and fire suppression work Date: January 20, 2015 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: September 11, 2015 | Permit id: 581306 | |||||
SCORE 100 Install sanitary waste and vent pipe. Install domestic hot and cold water piping and install (2)two fixtures - the installation will compy with the philadephia plubming code 2004 Date: November 26, 2014 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 22, 2015 | Permit id: 576046 | |||||
SCORE 100 Add 6 heat detectors, 8 strobes, 9 smoke detectors, 3 a v units, 2 door holders & 2 door detectors. Date: May 21, 2008 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: May 21, 2008 | Permit id: 149494 | |||||
SCORE 100 Install plenum cat 5e computer wire to 21 station as per nec 2008 (health care facility) Date: October 9, 2013 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: April 30, 2014 | Permit id: 493317 | |||||
SCORE 98 Install 137 cat-6a & fiber backbone plenum cables between the 5th floors per 2008 nec (health care) Date: March 17, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 17, 2017 | Permit id: 756726 | |||||
SCORE 98 Install 81 cat-6a & fiber backbone plenum cables between the 4th floors per 2008 nec (health care) Date: March 17, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 17, 2017 | Permit id: 756727 | |||||
SCORE 100 Update existing f a system and nurse call as per nfpa 72, update lighting and branch power, add panels and meter transformer as per 2008 nec (north district) hospital Date: June 11, 2012 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: June 11, 2012 | Permit id: 396538 | |||||
SCORE 89 Interior alterations as per plans Date: February 27, 2008 Contractor: Turnkey Construction Serv Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 133049 | |||||
SCORE 100 Hvac including ductwork Date: March 5, 2008 Contractor: Herman Goldner Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 11, 2009 | Permit id: 133054 | |||||
SCORE 100 Remove and install new sprinkler system for mri room Date: April 14, 2008 Contractor: Simplexgrinnell Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: March 14, 2011 | Permit id: 133215 | |||||
SCORE 99 Install new fire alarm control panel upgrades to existing head and equipment. As per nfpa 72 north district Date: October 28, 2016 Contractor: J P Rainey And Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: October 28, 2016 | Permit id: 722076 | |||||
SCORE 100 Renovation of existing space to create infusion suite. Date: September 21, 2012 Contractor: Florkowski Builders Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 407504 | |||||
SCORE 100 Alterations for sprinkler system, tie into existing wet combination riser and fully sprinkler the third floor of klein bldg. Date: July 24, 2012 Contractor: Simplexgrinnell Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 407510 | |||||
SCORE 100 Install category 5 computer wiring plenum rated. 43 stations as per 2008 nec Date: August 18, 2010 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: January 12, 2011 | Permit id: 291635 | |||||
SCORE 100 Provide new panel and disconnects, provide new feeders, and light fixtures connect 3 disconnects for controllers as per 2008 nec (north district) provide fire alarm devices as per nfpa72 Date: December 2, 2010 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: August 22, 2011 | Permit id: 293323 | |||||
For partial demo of existing telecommunication equipment from the rooftop and for placement of the same within an existing penthouse on the roof and for 2 hvac units attached to the penthouse, for use as telecommunication services on an existing hospital building in an existing hospital complex with uses as previously approved (size and location as shown in the application). Wireless services on an existing hospital complex. Date: January 30, 2007 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 23, 2013 | Permit id: 27747 | |||||
SCORE 100 Branch lighting power - lights - disconnects - power feed - as per plans - per 2008 nec Date: September 12, 2011 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: October 20, 2011 | Permit id: 359756 | |||||
SCORE 100 Phase 4. Continued level ii interior alterations demo and fitout of space per attached plans on the second floor of the heart center(no change of occupancy), additional support framing to existing framing for new lab equipment. Existing building fully sprinklered. No changes to smoke compartments. Separate permits required for any mep or fire suppression work Date: April 15, 2016 Contractor: Target Building Construction Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: December 3, 2016 | Permit id: 682684 | |||||
SCORE 100 Install feeders, branch circuits for lighting devices, sound system & nurse call system as per plans. Date: August 14, 2007 Contractor: Union Electric Contracting Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 8, 2007 | Permit id: 94939 | |||||
SCORE 98 Install 122- cat 6a and fiber backbone plenum cables between the floors... In accordance with 2008 nec (health care) Date: March 17, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: March 17, 2017 | Permit id: 756720 | |||||
SCORE 98 Install 25- cat 6a and fiber backbone plenum cables between the floors... In accordance with 2008 nec (health care) Date: May 10, 2017 Contractor: Coastal Communications Group I Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: May 10, 2017 | Permit id: 756721 | |||||
SCORE 100 Install new fire alarm devices on floors 1st,2nd,3rd and 4th, litter building, se job#9300, as per nfpa-72 (north dist) Date: June 16, 2008 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 149898 | |||||
SCORE 100 Relocate existing plenum cat5 wire to 26 new work station locations as per nec 2008 (hospital) Date: March 1, 2013 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: September 11, 2013 | Permit id: 451592 | |||||
SCORE 100 Relocate existing plenum cat5 wire to 22 new work station locations as per nec 2008 (hospital) Date: March 1, 2013 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: September 11, 2013 | Permit id: 451593 | |||||
SCORE 100 Install 200amp feeder, 48 fixtures, 6 switches, 15 recepts and 2 smoke detectors as per 2008 nec (north district) Date: November 7, 2016 Contractor: Shelly Electric Co Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: July 31, 2017 | Permit id: 730318 | |||||
SCORE 100 Furnish and install new lights, switches, recepts, 125amp feeder for new cath lab equipment as per 2008 nec (north district) Date: August 5, 2016 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 704645 | |||||
SCORE 100 F&i 6 smoke detectors, 3 strobes and 1 speaker strobe per nfpa 72 (health care)north district Date: September 16, 2016 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: March 2, 2017 | Permit id: 714406 | |||||
SCORE 100 Furnish and install 45 visual device,2 wf ts,2 pull station and 4 door holder per 2008 nec & nfpa 72 (health care facility) Date: October 2, 2013 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: March 26, 2014 | Permit id: 492185 | |||||
SCORE 99 Erect(3) lte antennas, (3) gsm antennas, (6) rrhs, (3) distribution boxes and erect(2)equipment cabinets., Date: October 11, 2011 Contractor: Telecommunications Contracting Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Alteration permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 366034 | |||||
SCORE 100 Fire and electric:renovation of the existing pharmacy including but not limited to lights, receptacles, fire alarm relocations and demolition of existing devices in the area. Please see the attached drawings. Date: January 30, 2007 Contractor: Raff Electric Inc Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Expired | Completion date: January 30, 2007 | Permit id: 38759 | |||||
SCORE 100 Replace (1) sink existing. The installation will comply with the philadephia plumbing code 2004 Date: July 7, 2016 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 25, 2016 | Permit id: 705373 | |||||
SCORE 100 Install 15 grd-ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Ez Date: July 20, 2016 Contractor: Elliott Lewis Corporation Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 3, 2016 | Permit id: 708627 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: August 2, 2016 Contractor: Independence Fire Sprinkler Co Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Suppression permit | Permit status: Completed | Completion date: December 3, 2016 | Permit id: 711852 | |||||
SCORE 100 Furnish and install panels, feeders, lights, switches and recepts as per 2008 nec (north district) no fire alarm on this permit Date: December 22, 2016 Contractor: Michael Kowal Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: August 14, 2017 | Permit id: 739170 | |||||
SCORE 100 For part. Demo. Of exist. Hvac system & for the installation of (39) terminal grilles, registers, & diffusors (grds), new rooftop unit supported by steel dunnage, & all associated supply, return, & exhaust ductwork to serve a previously approved clinic within an exist. Medical complex. Date: December 3, 2014 Contractor: Chadwick Service Company Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 25, 2015 | Permit id: 560801 | |||||
SCORE 100 Before demo - pul all existing cat5 plenum phone and computer wire up into ceilings after new walls built, fish existing down walls to 56 work stations as per 2008 nec (hospital) Date: July 13, 2012 Contractor: Focus Communications Nj Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 409271 | |||||
For the removal of one flat wall sign and for the erection of (per proviso plan 1 accessory flatwall sign -35x17, 2 accessory flat wall signs @ 17x17) accessory to an existing hospital Date: September 11, 2014 Client: Albert Einstein Medical Center | Client Company: Director Of Finance | Permit type: Zoning/use permit | Permit status: Expired | Completion date: September 11, 2014 | Permit id: 451291 |