Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Use permit Date: February 28, 2014 Client: Wpre Inventory Llc | Permit status: Completed | Permit id: 502429 | |||||
Alteration permit Date: August 18, 2016 Client: Wpre Inventory Llc | Permit status: Active | Permit id: 690486 | |||||
Permit for a single family dwelling in an existing attached structure Date: December 18, 2013 Client: Wpre Inventory Llc | Applicant: Darwin R. Beauvais, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: March 3, 2014 | Permit id: 21919 | |||||
Alteration permit Date: August 18, 2016 Client: Wpre Inventory Llc | Permit status: Active | Permit id: 690486 | |||||
Use permit Date: February 28, 2014 Client: Wpre Inventory Llc | Permit status: Completed | Permit id: 502429 | |||||
Permit for a single family dwelling in an existing attached structure Date: December 18, 2013 Client: Wpre Inventory Llc | Applicant: Darwin R. Beauvais, Esquire | Permit type: Appeal | Permit status: Granted | Completion date: March 3, 2014 | Permit id: 21919 | |||||
Use change to sfd Date: February 28, 2014 Client: Wpre Iv Lp | Permit type: Use permit | Permit status: Completed | Completion date: February 28, 2014 | Permit id: 502429 | |||||
SCORE 93 The home to be rehabilitated will be gutted down to the bearign walls, floor and roof joists, repaired as necessary (with less than 25% of anticipated joist replacement ): and rebuilt with all new systems, including new roof and new windows and doors. Gross square footage and building footprint is unchanged. The basement will remain unfinished, but walls floor will be repaired as necessary, sealed, and insulated. All utility connections (including water, sewer, gas, and electric) will be replaced a rear 6 perimeter chain link fence willsurround the rear yard. B-0601-r2-single family dwelling with uninhabitable basement Date: August 18, 2016 Contractor: Wp Construction Llc Client: Wpre Iv Lp | Permit type: Alteration permit | Permit status: Active | Completion date: November 10, 2017 | Permit id: 690486 | |||||
SCORE 100 Replace 3 4" water service,house trap,house drain,stack,fai,install 2-toilets,2-lavs,1-bath tub,1-kitchen sink,1-water heater and 1-washing machine.-pa1#20173210708-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"the installation will comply with the philadephia plubming code 2004 Date: December 14, 2017 Contractor: Richards Barrymore Client: Wpre Iv Lp | Permit type: Plumbing permit | Permit status: Active | Completion date: December 14, 2017 | Permit id: 839642 |