Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Re-wire from fire damage, top (2) flrs. Date: July 14, 2004 Contractor: R And R Electric Services Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: November 1, 2004 | Expiration date: July 14, 2005 | Current use: Single family / duplex | Permit id: 6038682 | |||||
SCORE 100 Install temporary outlets & check out existing service panel of 200a Date: March 4, 2004 Contractor: Boyer Electric Company Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: April 23, 2004 | Expiration date: March 4, 2005 | Current use: Single family / duplex | Permit id: 6031160 | |||||
SCORE 100 Replace boiler Date: November 3, 2004 Contractor: Heat N Air Techs Applicant: Heat N Air Techs | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: September 8, 2006 | Expiration date: May 3, 2006 | Current use: Single family / duplex | Permit id: 6045934 | |||||
SCORE 86 Installation of 350watt expandable photovoltaic system. 3/18/ jcb; revised permit to reflect solar. Date: March 4, 2010 Contractor: Solar Epiphany Llc Permit type: Electrical | Permit status: Permit closed | Completion date: March 18, 2010 | Expiration date: March 4, 2011 | Current use: Single family / duplex | Permit id: 6242292 |