Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Freestanding dialysis facility Date: May 17, 2012 Permit type: License | Permit status: Accepting application | Permit id: Zla-201202114 | |||||
SCORE 56 Wall sign Date: March 21, 2012 Contractor: Southern Graphic Design Permit type: Business | Permit status: Issued | Permit id: Bs-201200130 | |||||
SCORE 62 Low voltage service needed Date: February 3, 2012 Contractor: Dynamic Techology Services Permit type: Low voltage | Permit status: Issued | Permit id: Be-201200937 | |||||
SCORE 61 Installation of (6) new gas fired rtu heat cool units as per approved specification- Date: November 22, 2011 Contractor: Richard F. Martin Jr Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102811 | |||||
SCORE 61 Direct replacement of ton rtu heatpump- oringinal unit vandalized- Date: November 22, 2011 Contractor: Richard F. Martin Jr Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102810 | |||||
SCORE 61 Electrical work-disconnect reconnect of service Date: November 18, 2011 Contractor: Partitions Permit type: Electrical | Permit status: Issued | Permit id: Be-201108246 | |||||
SCORE 62 Low voltage; fire alarm; security system, intercom and emergency call Date: November 8, 2011 Contractor: Willard Crame Permit type: Low voltage | Permit status: Issued | Permit id: Be-201107966 | |||||
SCORE 64 Plumbing service needed at dialysis clinic 3 connection equipments, 22 p. O. Boxes, 1 eye wash Date: November 2, 2011 Contractor: Waymon Eugene Ragan Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201103170 | |||||
SCORE 64 Renovation of existing plumbing- (1)-backflow preventer (4)-basin (8)-floor drain (1)-drinking fountain (1)-service sink (22)-sink (4)-water closet (2)-water heater (3)-connection equipment (22)- r. O. Boxes (1)-eye wash Date: November 1, 2011 Contractor: Waymon Eugene Ragan Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201103162 | |||||
SCORE 93 Hvac work Date: October 28, 2011 Contractor: Mckenneys Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201102577 | |||||
SCORE 61 Interior remodel of existing space- Date: October 26, 2011 Contractor: Partitions Permit type: Electrical | Permit status: Issued | Permit id: Be-201107649 | |||||
Plan review Date: October 18, 2011 Permit status: Closed - approved | Permit id: Ba-201106242 | |||||
SCORE 56 Conversion of an existing space to a dialysis clinic, with no alteration to building shell; excepting installation of some windows, new exit doors, and ramp. No site work. Tl melton -revisions 12-2-2011 Date: September 20, 2011 Contractor: Bricco Construction Permit type: Conversion | Permit status: Co issued | Permit id: Bb-201104355 |