SCORE 77 Emergency gas leak repair Date: January 8, 2015 Contractor: James Caccia Plumbing Inc Permit status: Permit issued | Permit id: 15000-00065 | |||||
U & o only for new tenant "simply be" on 1st and 2nd 14 sf Date: May 22, 2015 Permit status: Permit issued | Permit id: 15000-01291 | |||||
Reroof ( squares) of tpo o (e) sheathing Date: March 10, 2017 Value: $24,000 Permit status: Permit issued | Permit id: 17000-00523 | |||||
16000-01863: revision to add a conference room to the 2nd floor. Date: April 27, 2017 Permit status: In plan check | Permit id: 17rev-00256 | |||||
SCORE 100 14000-01153: revision changes to work in right of way. Sidewalk at university and cowper to replace existing pavers, revised water service. Date: May 4, 2017 Contractor: Devcon Construction Incorporated Permit status: Approved with conditions | Permit id: 17rev-00270 | |||||
Demo existing 16,606 sq ft single story commercial building 14000-01153: foundation and below-grade parking (56,4 sf) for future new 3-story office retail building with (~ 5,7 sf) occupied roof deck and (2) split level of below grade parking with 62 parking spaces. (plans for office building will be submitted as a revision to this permit) Date: May 28, 2014 Permit status: In plan check | Permit id: 14000-01248 | |||||
SCORE 100 14000-01153: deferred submittal for exterior mental stud framing and connection structure Date: February 3, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00057 | |||||
SCORE 100 14000-01153: revise architectural layout and design of skylights at stairways 1 and 2 to be a double gable skylight. Add a beam at stairways 1 & 2 to support the double gabled skylight. Skylight, framing, and attachment to be a separate deferred submittal. Date: March 30, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00195 | |||||
SCORE 58 Replace approx. 2ft of drain line underground in the rear of the building Date: March 6, 2017 Contractor: Discount Plumbing And Heating Inc Permit status: Permit issued | Permit id: 17000-00455 | |||||
Simply be salon and spa: u&o only. U&o sent 06 02 17 Date: December 13, 2016 Permit status: Finaled | Permit id: 16000-03107 | |||||
SCORE 100 14000-01153: revision includes updates to skylight fraiming and structural support updates Date: May 30, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00309 | |||||
14000-01153: deferred submittal design built skylight Date: June 21, 2017 Permit status: Completed | Permit id: 17rev-00365 | |||||
16000-03018: interior layout changes Date: June 29, 2017 Value: $2,029,761 Permit status: Permit issued | Permit id: 17rev-00395 | |||||
14000-01153: revision to add egress barrier at the first floor of stair # 2 Date: July 27, 2017 Permit status: Completed | Permit id: 17rev-00451 | |||||
SCORE 100 Ti and u&o for new tenant "accel partners" 27,398 sf on the 1st, 2nd, 3rd floors. New interior parition, mep, new restrooms. Exterior improvements to roof deck, new pedestal system, gas fire place Permit status: Permit issued | Permit id: 16000-03018 | |||||
16000-03018: revision ground floor direct access to an electricity room, lobby tgp fireframes and av wall Date: November 30, 2017 Permit status: Permit issued | Permit id: 17rev-00753 | |||||
SCORE 100 New 3-story office retail building with (~ 5,7 sf) occupied roof deck and (2) split level of below grade parking (56,4 sf) with 62 parking spaces. (foundation and below-grade parking issued first & plans for office building will be submitted as a revision to this permit) Permit status: Permit issued | Permit id: 14000-01153 | |||||
14000-01153: revision for technical infeasibility (handrail extension) per robert dunbar Date: December 22, 2017 Permit status: Completed | Permit id: 17rev-00806 | |||||
16000-03018: revision deferred submittal install evse on level 1 and 2 below grade parking. Includes (4) dual charge level 2, (6) single charge level 3 Date: December 21, 2017 Permit status: In plan check | Permit id: 17rev-00799 |