Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
The big ten conference will be holding their college football championship football game at lucas oi Date: September 21, 2015 Permit type: Right of way | Permit status: Review | Permit id: Sev15-01056 | |||||
SCORE 98 Dig up verizon conduit in south st between capitol ave and missouri st for cable repair/replacement Date: October 19, 2011 Contractor: Michael Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row11-06137 | |||||
Indiana state high school marching band championships for class a b c and d Date: June 10, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-03329 | |||||
Tailgating on south street - Date: October 12, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-06100 | |||||
Colts home game Date: August 2, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-04399 | |||||
(gar) 675 iac 12-4-11(a) a storage space within lucas oil stadium will be used as a place of assem Date: October 27, 2011 Permit type: State variance | Permit status: Approved | Permit id: Svr11-00313 | |||||
SCORE 89 Super bowl xlvihost committee structure #25 - pepsi stagetemporary structure - 8 sflocated in inte Date: January 17, 2012 Contractor: Mark Dodd Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str12-00169 | |||||
Colts staff and vendor parking Date: January 3, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-00014 | |||||
2003 indiana building code table 601-the seating decks will not be of two-hour fire-resistive constr Date: January 18, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 18, 2012 | Permit id: Svr05-00123 | |||||
SCORE 64 Super bowl xlvihost committee structures #1 #2 #3 #7 & #29temporary structure #1manufactured restroo Date: January 20, 2012 Contractor: Allison Melangton Permit type: Structural | Permit status: Closed | Completion date: March 29, 2012 | Expiration date: July 18, 2012 | Permit id: Str12-00269 | |||||
SCORE 98 Installing conduit for at&t; w side of capitol 380-feet s of south st & 20-feet in south st. Emergenc Date: September 2, 2010 Contractor: Michael Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row10-05170 | |||||
SCORE 86 Excavation for at&t conduitemergency contact: mike thompson 877-2318 Date: September 3, 2010 Contractor: Kathleen Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row10-05208 | |||||
SCORE 98 Excavation for at&t conduitemergency contact: mike thompson 877-2318 Date: September 3, 2010 Contractor: Michael Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row10-05208 | |||||
2008 indiana building code section 1008. 1. 8. 3 means of egress doors from pedestrian tunnel into th Date: May 10, 2011 Permit type: State variance | Permit status: Approved | Permit id: Svr11-00122 | |||||
2003 indiana building code table 1004. 2. 4-exit access travel distance from the suite level be in exc Date: January 20, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 20, 2012 | Permit id: Svr05-00126 | |||||
Colts home game Date: May 17, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-02915 | |||||
A small parade will march down south street(blue crew lot to lucas oil stadium). The parade will in Date: January 3, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-00020 | |||||
2008 indiana building code section 907. 2. 1. 1 the activation of the fire alarm system does not auto Date: November 9, 2011 Permit type: State variance | Permit status: Approved | Permit id: Svr11-00322 | |||||
Parking for colts staff and vendors Date: May 10, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-02372 | |||||
SCORE 86 Row excavation to install conduit for at&t ; ( test hole in traffic lane of capitol ave @ south st Date: August 12, 2010 Contractor: Kathleen Thompson Permit type: Right of way | Permit status: Issued | Permit id: Row10-04696 | |||||
SCORE 98 Installing at&t manhole w side of capitol s of south stemergency contact: mike thompson 877-2318 Date: August 26, 2010 Contractor: Michael Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row10-05015 | |||||
SCORE 98 Row excavation to install conduit for at&t ; ( test hole in traffic lane of capitol ave @ south st Date: August 12, 2010 Contractor: Michael Thompson Permit type: Right of way | Permit status: Issued | Permit id: Row10-04696 | |||||
Oversize/overweightemergency contact: nancy eminger 574-825-8100 Date: February 28, 2011 Permit type: Right of way | Permit status: Ready to issue | Permit id: Row11-01003 | |||||
Tailgating on south street - Date: October 6, 2011 Permit type: Right of way | Permit status: Withdrawn | Permit id: Row11-05932 | |||||
Blocking sidewalk parking lane & 3 traffic lanes on s missouri st for crane to place snow/ice guar Date: December 2, 2011 Permit type: Right of way | Permit status: Complete | Permit id: Row11-06855 | |||||
Lucas oil stadium event zone used for drop off/pick up of groups as well as for loading out vendors Date: May 12, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-02608 | |||||
SCORE 64 Super bowl xlvihost committee structure #18 - verizon activation tenttemporary structure - 9 sfloc Date: January 17, 2012 Contractor: Allison Melangton Permit type: Structural | Permit status: Closed | Completion date: March 29, 2012 | Expiration date: July 18, 2012 | Permit id: Str12-00199 | |||||
Colts home game Date: July 30, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-04390 | |||||
Lucas oil stadium event zone used for drop off/pick up of groups as well as for loading out vendors Date: April 12, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-02199 | |||||
SCORE 89 4 sfinstallation date: 4/9/2014 removal date: 4/12/2014emergency contact: lynda fonde Date: April 8, 2014 Contractor: Glenn Rice Permit type: Notification | Permit status: Open | Permit id: Not14-00376 | |||||
SCORE 84 Installation of 20x & 10x tents6 sf & 1 sfinstall date: 8-6-14 removal date: 8-11-14 Date: November 5, 2014 Contractor: Nancy Angel Permit type: Notification | Permit status: Open | Permit id: Not14-02761 | |||||
SCORE 84 Installation of 20x & 10x tents6 sf & 1 sfinstall date: 8-6-14 removal date: 8-11-14 Date: November 5, 2014 Contractor: Jeff Zahner Permit type: Notification | Permit status: Open | Permit id: Not14-02761 | |||||
SCORE 89 4 sf (6)installation date: 11-24-14removal date: 11-25-14emergency contact: amy waymiretelephone # Date: November 24, 2014 Contractor: Glenn Rice Permit type: Notification | Permit status: Open | Permit id: Not14-03310 | |||||
SCORE 82 9 x canopy & 9 x canopy weightedsf: 1 and 90installation date: 9/13/14removal date: 9/13/14e Date: December 2, 2014 Contractor: Concetta Lorah Permit type: Notification | Permit status: Open | Permit id: Not14-03418 | |||||
SCORE 89 9 x canopy & 9 x canopy weightedsf: 1 and 90installation date: 9/13/14removal date: 9/13/14e Date: December 2, 2014 Contractor: Jack Hawkins Permit type: Notification | Permit status: Open | Permit id: Not14-03418 | |||||
17329 - 2 basketball games played on march 28 and to determine one of the 4 remaining teams in th Date: January 27, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-00365 | |||||
18006 - after race participants are served hot cocoa and chocolate fondue. The event benefits ronal Date: May 15, 2014 Permit type: Right of way | Permit status: Cancelled | Permit id: Row14-02612 | |||||
18015 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02632 | |||||
18018 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02634 | |||||
180 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02638 | |||||
18021 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02640 | |||||
18022 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02642 | |||||
18024 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02644 | |||||
18025 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02645 | |||||
18026 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02647 | |||||
18028 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02649 | |||||
18029 - security and vendor parking touchdown town event site (pregame fan area) Date: May 16, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02650 | |||||
180 - the issma state marching band championship for indiana high school marching bands Date: May 28, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02850 | |||||
18078 - 5k run to celebrate the start of football season. Participants will run a 5k course and fin Date: May 29, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02885 | |||||
Use of east side sidewalk and traffic lane on missouri st between merill st to south st for crane to Date: August 25, 2014 Permit type: Right of way | Permit status: Complete | Permit id: Row14-04669 | |||||
Use of curb lane on west st in front of lucas oil stadium for shuttel busses for the exact target co Date: September 5, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-04938 | |||||
18643 - national semi final and cahmpionship mens basketball games to be played at los on saturday a Date: September 9, 2014 Permit type: Right of way | Permit status: Void | Permit id: Row14-05031 | |||||
Use of east side sidewalk and traffic lane on missouri st between merill st to south st for crane to Date: September 15, 2014 Permit type: Right of way | Permit status: Complete | Permit id: Row14-05154 | |||||
18749 - lucas oil stadium event zone used for drop off/pick up of groups as well as for loading out Date: September 30, 2014 Permit type: Right of way | Permit status: Void | Permit id: Row14-05481 | |||||
18788 - championship football game to determine winner of the big ten conference regular season and Date: October 6, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-05584 | |||||
Installation of roman numerals on sidewalk in front of lucas oil stadium sw corner of capitol ave & Date: November 17, 2014 Permit type: Right of way | Permit status: Complete | Permit id: Row14-06343 | |||||
SCORE 89 Partial closure of sidewalk on the southeast corner of south st & missouri st 11/21 thru 12/5 for se Date: November 20, 2014 Contractor: Rich Schroeder Permit type: Right of way | Permit status: Complete | Permit id: Row14-06443 | |||||
SCORE 89 Partial closure of sidewalk on the southeast corner of south st & missouri st 11/21 thru 12/5 for se Date: November 20, 2014 Contractor: Charles Mcauley Permit type: Right of way | Permit status: Complete | Permit id: Row14-06443 | |||||
18914- touchdown town will be held from 10am to 12:30pm Date: December 2, 2014 Permit type: Right of way | Permit status: Ready to issue | Permit id: Sev14-10024 | |||||
18643 - national semi final and championship mens basketball games to be played at los on saturday a Date: December 5, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Sev14-10052 | |||||
Lucas oil stadium event zone used for drop off/pick up of groups as well as for loading out vendors Date: December 8, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Sev14-10079 | |||||
SCORE 84 Installation of x x tents weighted Date: August 4, 2015 Contractor: Nancy Angel Permit type: Notification | Permit status: Submitted | Permit id: Not15-01745 | |||||
SCORE 84 Installation of x x tents weighted Date: August 4, 2015 Contractor: Jeff Zahner Permit type: Notification | Permit status: Submitted | Permit id: Not15-01745 | |||||
SCORE 89 (2) x frame tents weighted w/ concrete weights nfl 5k fun run Date: August 4, 2015 Contractor: Glenn Rice Permit type: Notification | Permit status: Submitted | Permit id: Not15-01747 | |||||
SCORE 89 (2) x (3) x (1) x weighted Date: September 9, 2015 Contractor: Glenn Rice Permit type: Notification | Permit status: Submitted | Permit id: Not15-02197 | |||||
SCORE 89 (5) x weighted Date: October 8, 2015 Contractor: Glenn Rice Permit type: Notification | Permit status: Submitted | Permit id: Not15-02597 | |||||
SCORE 96 Vertical soil boring for the lower pogues run tunnel on south st from 1/8/15 thru 1/23/15; emergency Date: January 8, 2015 Contractor: Richard Olson Permit type: Right of way | Permit status: Complete | Permit id: Row15-00066 | |||||
SCORE 96 Vertical soil boring for the lower pogues run tunnel on south st from 1/8/15 thru 1/23/15; emergency Date: January 8, 2015 Contractor: Mark Knuttel Permit type: Right of way | Permit status: Complete | Permit id: Row15-00066 | |||||
Use of east side sidewalk and traffic lane on missouri st between merill st to south st for crane to Date: January 23, 2015 Permit type: Right of way | Permit status: Complete | Permit id: Row15-00343 | |||||
SCORE 94 Obtain measurements on the exiting regulator wall (elevations) flow line and rim elevations and pipe Date: July 23, 2015 Contractor: Mark Mason Permit type: Right of way | Permit status: Issued | Permit id: Row15-03797 | |||||
SCORE 86 Obtain measurements on the exiting regulator wall (elevations) flow line and rim elevations and pipe Date: July 23, 2015 Contractor: Kristina Walters Permit type: Right of way | Permit status: Issued | Permit id: Row15-03797 | |||||
SCORE 96 Repair sinking manhole cover tim salts 317-607-3797 Date: October 5, 2015 Contractor: Scott Herald Permit type: Right of way | Permit status: Complete | Permit id: Row15-05059 | |||||
Lucas oil stadium event zone used for drop off/pick up of groups as well as for loading out vendors Date: September 24, 2015 Permit type: Right of way | Permit status: Review | Permit id: Sev15-01068 | |||||
College football game between ball state university and indiana university Date: July 28, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-04255 | |||||
Concert Date: March 23, 2012 Permit type: Right of way | Permit status: Denied | Permit id: Row12-01809 | |||||
2003 indiana building code table 1008. 6-the maximum travel distance 2 feet at the terrace concours Date: January 20, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 20, 2012 | Permit id: Svr05-00127 | |||||
Right of way Date: August 13, 2010 Permit status: Issued | Permit id: Row10-04709 | |||||
2003 indiana building code table 1004. 2. 4-the maximum travel distance for the lower suite level will Date: January 23, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 23, 2012 | Permit id: Svr05-00128 | |||||
2003 indiana building code sections 403. 2 903. 2. 1. 3 1008. 5. 2. 3-automatic sprinklers will not be prov Date: January 12, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 12, 2012 | Permit id: Svr05-00121 | |||||
Indiana state high school marching band championships for class a b c and d Date: August 30, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-05192 | |||||
Home game Date: July 17, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-04032 | |||||
Indiana state high school marching band championships for class a b c and d Date: June 10, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-03242 | |||||
Installation of roman numerals on sidewalk in front of lucas oil stadium sw corner of capitol ave & Date: November 19, 2012 Permit type: Right of way | Permit status: Complete | Permit id: Row12-06718 | |||||
SCORE 64 Super bowl xlvihost committee structure #18 - verizon activation tenttemporary structure - 9 sfloc Date: January 17, 2012 Contractor: Shawn Hitchcock Permit type: Structural | Permit status: Closed | Completion date: March 29, 2012 | Expiration date: July 18, 2012 | Permit id: Str12-00199 | |||||
SCORE 89 Super bowl xlvihost committee structure #26 - verizon stagetemporary structure - 16 sflocated in i Date: January 17, 2012 Contractor: Mark Dodd Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str12-00171 | |||||
SCORE 96 Gratis permit for united water per j. Lopez repair broken basin lead mark smith 317-223-1661 Date: September 7, 2012 Contractor: Jennifer Phillippi Permit type: Right of way | Permit status: Complete | Permit id: Row12-05324 | |||||
2003 indiana building code section 1005. 3. 2. 5-except for stair no. 3 and stair no. 8 the stairway en Date: January 12, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 12, 2012 | Permit id: Svr05-00120 | |||||
SCORE 64 Super bowl xlvihost committee structures #1 #2 #3 #7 & #29temporary structure #1manufactured restroo Date: January 20, 2012 Contractor: Shawn Hitchcock Permit type: Structural | Permit status: Closed | Completion date: March 29, 2012 | Expiration date: July 18, 2012 | Permit id: Str12-00269 | |||||
SCORE 96 Gratis permit for united water per j. Lopez repair broken basin lead mark smith 317-223-1661 Date: September 7, 2012 Contractor: Neil Phillippi Permit type: Right of way | Permit status: Complete | Permit id: Row12-05324 | |||||
Colts home game Date: August 3, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-04412 | |||||
SCORE 96 Hydrant repair Date: September 23, 2010 Contractor: Sandy Briggs Permit type: Right of way | Permit status: Issued | Permit id: Row10-05610 | |||||
The first day of 2013 will be one to remember. In a city near you thousands of people will set out Date: November 5, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-06394 | |||||
Concert featuring kenny chesny and tom mcgraw Date: July 24, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-04412 | |||||
Super bowl xlvi Date: January 4, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-00032 | |||||
Blocking sidewalk parking lane & 3 traffic lanes on s capitol ave for crane to place snow/ice guar Date: December 2, 2011 Permit type: Right of way | Permit status: Complete | Permit id: Row11-06854 | |||||
SCORE 86 Installing conduit for at&t; w side of capitol 380-feet s of south st & 20-feet in south st. Emergenc Date: September 2, 2010 Contractor: Kathleen Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row10-05170 | |||||
2003 indiana building code table 601-the fourteen super columns and 12 sponser columns will not comp Date: January 20, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 20, 2012 | Permit id: Svr05-00124 | |||||
2003 indiana building code table 1004. 2. 4-the exit access travel distance for the press level will e Date: January 20, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 20, 2012 | Permit id: Svr05-00125 | |||||
2003 indiana building code section 1005. 2. 1 nine suites with a calculated occupant load requiring Date: August 11, 2011 Permit type: State variance | Permit status: Approved | Permit id: Svr11-00225 | |||||
Concert Date: May 11, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-02790 | |||||
2008 indiana fire code section 3503. 1. 1 lp gas will be used inside the building for entertainment Date: February 16, 2011 Permit type: State variance | Permit status: Denied | Permit id: Svr11-00072 | |||||
2003 indiana building code section 1005. 3. 4-roll-up doors at twelve locations will open directly int Date: January 18, 2012 Permit type: State variance | Permit status: Closed | Completion date: January 18, 2012 | Permit id: Svr05-00122 | |||||
SCORE 86 Installing at&t manhole w side of capitol s of south stemergency contact: mike thompson 877-2318 Date: August 26, 2010 Contractor: Kathleen Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row10-05015 | |||||
Concert Date: April 19, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-02364 | |||||
Single football game - champion of the big ten conference will be chosen at this game. Winners of t Date: October 29, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-06205 | |||||
SCORE 97 Sf 6 20x frame tent installation date: 10-16-12 & removal date: 10-6-12 emergency contact: anita Date: September 20, 2012 Contractor: Bruce Jones Permit type: Notification | Permit status: Open | Permit id: Not12-02060 | |||||
Concert Date: December 2, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-06845 | |||||
SCORE 86 Dig up verizon conduit in south st between capitol ave and missouri st for cable repair/replacement Date: October 19, 2011 Contractor: Kathleen Thompson Permit type: Right of way | Permit status: Complete | Permit id: Row11-06137 | |||||
Super bowl xlvihost committee structure #27 - verizon stage mix location (media production)temporary Date: January 17, 2012 Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str12-00176 | |||||
SCORE 93 4 sfinstallation date: 8/8/2012 removal date: 8/10/2012emergency contact: shelley telephone: Date: August 8, 2012 Contractor: Jeff Zaher Permit type: Notification | Permit status: Open | Permit id: Not12-01655 | |||||
Single football game - champion of the big ten conference will be chosen at this game. Winners of t Date: November 2, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-06359 | |||||
SCORE 97 6 sfinstallation date: 8/17/13 removal date: 8/8/13emergency contact: whitney wolf Date: August 5, 2013 Contractor: Bruce Jones Permit type: Notification | Permit id: Not13-01544 | |||||
SCORE 93 6 sfinstallation date: 8/17/13 removal date: 8/8/13emergency contact: whitney wolf Date: August 5, 2013 Contractor: Jeff Zaher Permit type: Notification | Permit id: Not13-01544 | |||||
SCORE 89 Two 4 sfinstallation date: 12/8/2013 removal date: 12/13/2013emergency contact: tory Date: December 6, 2013 Contractor: Glenn Rice Permit type: Notification | Permit status: Open | Permit id: Not13-02453 | |||||
4 of the remaining 16 basketball teams in the ncaa tournament will play 3 games at los to determine Date: February 15, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-00889 | |||||
4 teams - 2 games Date: April 11, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-01953 | |||||
Erect large aluminum/fabric fdic letter on ne corner of lucas oil stadium on 4/19/13; emergency cont Date: April 16, 2013 Permit type: Right of way | Permit status: Complete | Permit id: Row13-02074 | |||||
Remove large aluminum/fabric fdic letter on ne corner of lucas oil stadium on 4/29/13; emergency con Date: April 16, 2013 Permit type: Right of way | Permit status: Complete | Permit id: Row13-02075 | |||||
16412 - 5k running race partnership with the indianapolis colts taht will start and finish at lucas Date: May 10, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02532 | |||||
16403 - lucas oil stadium event zone used for drop off/pick up of groups as well as for loading out Date: May 13, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02558 | |||||
16487 - parking Date: May 16, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02612 | |||||
16489 - parking Date: May 16, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02613 | |||||
16490- parking Date: May 16, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02615 | |||||
16491- parking Date: May 16, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02616 | |||||
SCORE 97 Excavating sidewalk for irrigation repair approx ft north of merrill on w side of capitol in fron Date: May 17, 2013 Contractor: John Williamson Permit type: Right of way | Permit status: Issued | Permit id: Row13-02655 | |||||
16492- parking Date: May 20, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02695 | |||||
16493- parking Date: May 20, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02696 | |||||
16494- parking Date: May 20, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02697 | |||||
16495 - parking Date: May 20, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02698 | |||||
16496 - parking Date: May 20, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02699 | |||||
16497 - parking Date: May 20, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-02700 | |||||
16719 - the issma state marching band championship for indiana high school marching bands Date: June 25, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-03515 | |||||
Use of curb ln/traffic ln in front of lucas oil stadium on south st for loading/unloading of shuttle Date: July 3, 2013 Permit type: Right of way | Permit status: Complete | Permit id: Row13-03672 | |||||
SCORE 97 Relocation of signs in front of lucas oil stadium on 8/5/13; emergency contact: john williamson 506- Date: August 1, 2013 Contractor: John Williamson Permit type: Right of way | Permit status: Issued | Permit id: Row13-04248 | |||||
SCORE 96 Emergency steam mh repair per dan frye at northwest corner of lucas oil stadium mark smith 317-223-1 Date: September 5, 2013 Contractor: Neil Phillippi Permit type: Right of way | Permit status: Complete | Permit id: Row13-04859 | |||||
SCORE 96 Emergency steam mh repair per dan frye at northwest corner of lucas oil stadium mark smith 317-223-1 Date: September 5, 2013 Contractor: Jennifer Phillippi Permit type: Right of way | Permit status: Complete | Permit id: Row13-04859 | |||||
17083 - championship football game to determine winner of the big ten conference regular season and Date: October 2, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-05324 | |||||
17119 - lucas oil stadium event zone used for drop off/pick up of groups as well as for loading out Date: October 22, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-05693 | |||||
Installation of roman numerals on sidewalk in front of lucas oil stadium sw corner of capitol ave & Date: November 19, 2013 Permit type: Right of way | Permit status: Complete | Permit id: Row13-06160 | |||||
SCORE 96 Exploratory dig in south traffic lane of south st between missouri and senateleak affecting steam li Date: December 12, 2013 Contractor: Roy Lanham Permit type: Right of way | Permit status: Complete | Permit id: Row13-06578 | |||||
SCORE 89 Exploratory dig in south traffic lane of south st between missouri and senateleak affecting steam li Date: December 12, 2013 Contractor: Lois Lanham Permit type: Right of way | Permit status: Complete | Permit id: Row13-06578 | |||||
17257- parking for impd ifd code enforcement homeland security event vendors and possible location f Date: December 17, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-06636 | |||||
SCORE 98 Dig up verizon conduit in south st between capitol ave and missouri st for cable repair replacement Date: October 19, 2011 Contractor: Michael Thompson Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06137 | |||||
SCORE 98 Installing conduit for at&t; w side of capitol 380-feet s of south st & 20-feet in south st. Emergenc Date: September 2, 2010 Contractor: Michael Thompson Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05170 | |||||
SCORE 98 Excavation for at&t conduitemergency contact: mike thompson 877-2318 Date: September 3, 2010 Contractor: Michael Thompson Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05208 | |||||
SCORE 98 Installing at&t manhole w side of capitol s of south stemergency contact: mike thompson 877-2318 Date: August 26, 2010 Contractor: Michael Thompson Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05015 | |||||
SCORE 98 Row excavation to install conduit for at&t ; ( test hole in traffic lane of capitol ave @ south st Date: August 12, 2010 Contractor: Michael Thompson Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Issued | Permit id: Row10-04696 | |||||
Oversize overweightemergency contact: nancy eminger 574-825-8100 Date: February 28, 2011 Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Ready to issue | Permit id: Row11-01003 | |||||
Blocking sidewalk parking lane & 3 traffic lanes on s missouri st for crane to place snow ice guar Date: December 2, 2011 Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06855 | |||||
Lucas oil stadium event zone used for drop off pick up of groups as well as for loading out vendors Date: May 12, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-02608 | |||||
Lucas oil stadium event zone used for drop off pick up of groups as well as for loading out vendors Date: April 12, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-02199 | |||||
SCORE 96 Gratis permit for united water per j. Lopez repair broken basin lead mark smith 317-223-1661 Date: September 7, 2012 Contractor: Jennifer Phillippi Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row12-05324 | |||||
SCORE 96 Gratis permit for united water per j. Lopez repair broken basin lead mark smith 317-223-1661 Date: September 7, 2012 Contractor: Neil Phillippi Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row12-05324 | |||||
Blocking sidewalk parking lane & 3 traffic lanes on s capitol ave for crane to place snow ice guar Date: December 2, 2011 Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06854 | |||||
SCORE 97 4 sfinstallation date: 8/8/2012 removal date: 8/10/2012emergency contact: shelley telephone: Date: August 8, 2012 Contractor: Bruce Jones Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Notification | Permit status: Open | Permit id: Not12-01655 | |||||
SCORE 89 16 sfinstallation date: 7/18/12 removal: 7/19/12 Date: July 17, 2012 Contractor: Glenn Rice Client: Indiana Stadium & Convention Building Authority % Ice Miller | Permit type: Notification | Permit status: Open | Permit id: Not12-01425 |