Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
As per the requirement contract with hpd, provide and install 6 window guards throughout entire apartment 3f. Remove all work related debris note: Date: January 23, 2013 Permit type: Gc | Permit id: Ed13640 | |||||
Perform total lead analysis of 12 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 5, 2010 Permit type: Delead | Permit id: Ea34693 | |||||
Perform total lead analysis of 01 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 5, 2010 Permit type: Delead | Permit id: Ea34692 | |||||
(bkwest) local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-20 Date: October 2, 2007 Permit type: Delead | Permit id: E808223 | |||||
At apt #3r: repair the defective/ leaky bathtub faucets in the bathroom. Remove all work related debris. Non s. W. P required. Note: contractor Date: March 13, 2013 Permit type: Plumb | Permit id: Ed17992 | |||||
At apt #3r: repair the defective leaky bathtub faucets in the bathroom. Remove all work related debris. Non s. W. P required. Note: contractor Date: March 13, 2013 Permit type: Plumb | Permit id: Ed17992 | |||||
L/l 38 abate: abate as per rc # 0040076. Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: October 23, 2000 Permit type: Delead | Permit id: E107595 | |||||
L l 38 abate: abate as per rc # 0040076. Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: October 23, 2000 Permit type: Delead | Permit id: E107595 | |||||
Apartment # 2r: supply and install new window guards in living room (1) bedroom #2 -(1) and bathroom (1) reinstall with one -way screws and stops Date: December 6, 2001 Permit type: Gc | Permit id: E209402 | |||||
SCORE 95 Equipment work Date: December 18, 2003 Contractor: Kamal Construction Permit status: Permit issued | Permit id: 30164122101 | |||||
Restore electricity to the entire public hall from first (1st) to third (3rd) story, restore all light fixture to proper working order. Public hall el Date: March 23, 2005 Permit type: Elec | Permit id: E525489 | |||||
Demo defective tile floor by staircase at 1st floor sqft. Patch sub-floor as needed. Concrete patch floor. Install tile floor sqft and grout Date: May 13, 1999 Permit type: Gc | Permit id: E007197 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: May 6, 2010 Permit type: Delead | Permit id: Ea34803 | |||||
Public area ) at 1st and 3rd fl ; install missing balusters Date: October 25, 2007 Value: $272 Permit type: Gc | Permit id: E810507 | |||||
Apt 2f) at 1st and 2nd bedroom install window guard Date: December 11, 2007 Value: $66 Permit type: Gc | Permit id: E814632 | |||||
Apt 2f) at bathroom install window guard complete, at kitchen and bedroom re-install bedroom Date: September 14, 2007 Value: $184 Permit type: Gc | Permit id: E806690 | |||||
Apt 1r) at kitchen: install window with stop and one way screws, and at bathroom re-install (2) window with stop and one way screws. Remove all wor Date: February 2, 2007 Value: $126 Permit type: Gc | Permit id: E720806 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: January 25, 2007 Permit type: Delead | Permit id: E720024 | |||||
P/a 3rd sty: capsheet roof north of bulkhead 1 sqft. South of bulkhead 144 sqft. And west of bulkhead sqft. P/a 2nd sty: cover floor wit Date: October 13, 2000 Value: $892 Permit type: Gc | Permit id: E107124 | |||||
P/a 1st story: install glass at transom of vestibule door. Date: October 13, 2000 Value: $199 Permit type: Gc | Permit id: E107111 | |||||
P/a 2nd sty: patch concrete floor 3 sqft. Remove rubbish to street. Date: October 13, 2000 Value: $366 Permit type: Gc | Permit id: E107109 | |||||
2nd floor p/h: remove damage tile and grout. Date: September 29, 2000 Value: $242 Permit type: Gc | Permit id: E106127 | |||||
Remove loose plaster iand patch damage area. Date: September 29, 2000 Value: $207 Permit type: Gc | Permit id: E106121 | |||||
P/a: patch (2) sub-floor as needed. Concrete patch floor. Install (2) tile floor sq. Ft.. Exit 1st flr: demo defective 2 tiles floor by stair c Date: April 20, 1999 Permit type: Gc | Permit id: E006652 | |||||
SCORE 100 Date: August 15, 1995 Contractor: Reginald Minor Client: Rodia Kalamaris | Client Address: 947 Hylan Blvd Staten Island Ny 10305 | Client Phone: (718) 273-2128 | Client Company: Na | Permit status: Initial | Permit id: 300441243 | |||||
SCORE 100 Date: December 14, 2007 Contractor: Michael Santoro Client: Stanley Roinstad | Client Address: 5 82 Street Brooklyn Ny 11209 | Client Phone: (718) 680-0351 | Permit status: Initial | Permit id: 310069626 | |||||
SCORE 100 Date: August 14, 1995 Contractor: Gerald Steuer Client: Rodia Kalamaris | Client Address: 947 Hylan Blvd Staten Island Ny 10305 | Client Phone: (718) 273-2128 | Client Company: Na | Permit status: Initial | Permit id: 300441243 | |||||
Date: December 18, 2003 Client: Fouad Twait | Client Address: 5 82 Street Brooklyn Ny 11209 | Client Phone: (718) 449-5808 | Permit status: Initial | Permit id: 301641221 | |||||
SCORE 99 Date: December 18, 2003 Contractor: Mohammed Kamal Client: Fouad Twait | Client Address: 5 82 Street Brooklyn Ny 11209 | Client Phone: (718) 449-5808 | Permit status: Initial | Permit id: 301641221 | |||||
P a: patch (2) sub-floor as needed. Concrete patch floor. Install (2) tile floor sq. Ft.. Exit 1st flr: demo defective 2 tiles floor by stair c Date: April 20, 1999 Permit type: Gc | Permit id: E006652 | |||||
2nd floor p h: remove damage tile and grout. Date: September 29, 2000 Value: $242 Permit type: Gc | Permit id: E106127 | |||||
P a 2nd sty: patch concrete floor 3 sqft. Remove rubbish to street. Date: October 13, 2000 Value: $366 Permit type: Gc | Permit id: E107109 | |||||
P a 1st story: install glass at transom of vestibule door. Date: October 13, 2000 Value: $199 Permit type: Gc | Permit id: E107111 | |||||
P a 3rd sty: capsheet roof north of bulkhead 1 sqft. South of bulkhead 144 sqft. And west of bulkhead sqft. P a 2nd sty: cover floor wit Date: October 13, 2000 Value: $892 Permit type: Gc | Permit id: E107124 | |||||
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 10, 2010 Permit type: Delead | Permit id: Ea38418 | |||||
As per rc #2007001232501 (enviro-probe, inc.), perform total lead analysis of 4 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: February 14, 2007 Permit type: Delead | Permit id: E721547 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 24, 2010 Permit type: Delead | Permit id: Ea36500 |