Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Internal remodel to create additional bathroom and office space. Date: April 29, 2014 Contractor: Waltz Kim Permit type: Pool/spa | Permit status: Finaled | Permit id: B13-3111 | |||||
SCORE 92 Remodel of existing commercial building to include 4,618 sf restaurant, 8,227 sf museum, and 8,922 sf garage; shell space and lobby only; addition of residential floors (43 units); demo permit to be submitted separately. Permit scope revised june 27, 2013 Permit type: Pool/spa | Permit status: Issued | Permit id: B11-3998 | |||||
SCORE 56 Install soil vapor extraction (sve) and air-sparging system (as). Vapor phase carbon vessels (3) in series will be used to abate extracted organic compounds prior to being vented to the atmosphere. Date: September 6, 2012 Contractor: Innovative Construction Solutions Norcal Permit type: Pool/spa | Permit status: Issued | Permit id: B12-1782 | |||||
SCORE 97 Remodel conference to offices, add bathroom and redo lighting. Date: April 29, 2014 Contractor: Sierra Group Permit status: Finaled | Permit id: B14-1230 | |||||
SCORE 84 Fabricate & install (3) new internally illuminated signs onto building. Date: September 19, 2012 Contractor: Scott A G Llc Permit status: Finaled | Permit id: B12-3081 |