Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Add foam insulated patio cover to the back of the house. 34x8 build overhang at the front of the house to cover an exsiting porch... Tie in about 8 up into existing hip roof with new rafters, and carry overhang about 6-8 in front of the house. Permit type: Renovation (structural) | Permit status: Permit issued | Current use: Single family | |||||
SCORE 89 Add foam insulated patio cover to the back of the house. 34x8 build overhang at the front of the house to cover an exsiting porch... Tie in about 8 up into existing hip roof with new rafters, and carry overhang about 6-8 in front of the house. Permit type: Renovation (structural) | Permit status: Permit issued | Current use: Single family |