Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Remove and plug the sprinkler heads throughout the 3rd floor during a heat treatment. Re-install sprinkler heads once treatment is finished. Date: June 12, 2017 Contractor: Trey Sparks Permit type: Bfd sprinkler system | Permit id: Sprk707882 | |||||
SCORE 82 Remove and plug the sprinkler heads throughout the 3rd floor during a heat treatment. Re-install sprinkler heads once treatment is finished.; to follow redhawk;impairment letter dated 2 24 17 and bfd (ff w radio);detail. Bfd paid detail required Date: February 28, 2017 Contractor: Trey Sparks Permit type: Bfd sprinkler system | Permit id: Sprk683637 |