Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: November 4, 2010 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 310002 | |||||
Administrative permit Date: March 7, 2011 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 325816 | |||||
Mechanical permit Date: January 31, 2011 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 302453 | |||||
Electrical permit Date: March 2, 2011 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 326150 | |||||
Mechanical permit Date: January 31, 2011 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 302453 | |||||
Alteration permit Date: September 17, 2010 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 297157 | |||||
Administrative permit Date: March 7, 2011 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 325816 | |||||
Electrical permit Date: March 2, 2011 Client: Infinity Capital Partners | Permit status: Completed | Permit id: 326150 | |||||
This permit serves as documentation that a certificate of occupancy is not required for the location of work and occupancy listed above. This is not a certificate of occupancy or a permit authorizing construction. This is a pre-code use (five family dwelling) permit #24550. Date: March 7, 2011 Client: Nfinity Capital Partners | Permit type: Administrative permit | Permit status: Completed | Completion date: October 12, 2011 | Permit id: 325816 | |||||
SCORE 71 Interior alterations to include (8) new windows inexisting window openings, ceramic tile, sheetrock and new toilets. No structure work is in this application. Separate permit for co. Date: September 17, 2010 Contractor: Hargraves Contracting Client: Nfinity Capital Partners | Permit type: Alteration permit | Permit status: Completed | Completion date: September 20, 2011 | Permit id: 297157 | |||||
SCORE 71 Stucco area along side of bldg. Multi family work to be done in the soffit area Date: November 4, 2010 Contractor: Hargraves Contracting Client: Nfinity Capital Partners | Permit type: Alteration permit | Permit status: Completed | Completion date: March 1, 2011 | Permit id: 310002 | |||||
SCORE 100 Unit#1 installation of new electric warm air heater on the 1st flr with connected d w in the basemnet all within the same tenant space 15 kw and 3ton ac. Unit #2 2nd floor rear 10kw with 2ton ac. Unit #3 2nd floor front 3 4 ton ductless heatpump system. Unit #4 3rd floor rear 10kw w 1. 5 ac unit. Unit #5 combination 3rd flr. Front and 4th floor 15 kw w 2ton ac. All unit are within separate tenant spaces no penetration through fire rated assemblies. Date: January 31, 2011 Contractor: Clyde Mccoy Client: Nfinity Capital Partners | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 30, 2011 | Permit id: 302453 | |||||
SCORE 100 400amp service new,3 new 100amp sub panel,replace all existing receptacles and switches rewire 1st floor apartment,install 12 gfci 3 30amp 6 50amp lines,replace 2 existing 24v smoke detectors & 2 existing horns,fa sys existing,install 12 110v smokes alarms as per 2008 nec,nfpa-72 Date: March 2, 2011 Contractor: Willie Welcome Client: Nfinity Capital Partners | Permit type: Electrical permit | Permit status: Completed | Completion date: March 14, 2011 | Permit id: 326150 | |||||
SCORE 71 Rebuild porch floor with 2" x 10" and 5 4" planking. Rebuild side and rear bay to match original in size and location. Date: July 9, 2010 Contractor: Hargraves Contracting Client: Nfinity Capital Partners | Permit type: Alteration permit | Permit status: Expired | Completion date: August 3, 2010 | Permit id: 290079 |