Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Installation of a flush mount 9. 8 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Date: January 31, 2014 Contractor: Custom Solar Llc Client: Derek Olson,Beth R | Applicant: Custom Solar Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 13, 2014 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount 9. 8 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Derek Olson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 13, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00548 | |||||
SCORE 95 In property in the front yard with clean outs Date: January 3, 2017 Contractor: Trench Right Llc Client: Derek Olson | Permit type: Wastewater | Permit status: Iss | Permit id: Pmt2017-00001 |