Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Re-roof existing warehouse (uwajimaya) including seismic improvements & new rooftop mechanical equipment, per plan. Applicant: Heinen, David | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6282827 | |||||
SCORE 91 New led retrofit, all fixtures retrofited 52 fixtures (city light rebate). Date: May 17, 2016 Contractor: M Jones Electric Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2016 | Expiration date: May 17, 2017 | Current use: Commercial | Permit id: 6535339 | |||||
Project cancelled 1/10/2011 -- sepa. Possible change of use to research and development. Ti to existing warehouse. Applicant: Belcher, Craig | Permit status: Cancelled | Permit id: 3005667 | |||||
SCORE 95 New controller, pump unit, new jack, signal fixtures, traveller & hoistway wiring, selector, door operator Applicant: Thyssenkrupp Elevator Corp | Permit type: Conveyance | Permit status: Permit closed | Completion date: October 6, 2011 | Expiration date: January 22, 2013 | Permit id: 6289434 | |||||
Project cancelled 1 10 2011 -- sepa. Possible change of use to research and development. Ti to existing warehouse. Applicant: Belcher, Craig | Permit status: Cancelled | Permit id: 3005667 | |||||
SCORE 95 Scl lighting retrofit program Date: September 30, 2011 Contractor: Capital Lighting Company Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 10, 2011 | Expiration date: September 30, 2012 | Current use: Commercial | Permit id: 6297263 | |||||
SCORE 100 Wire new hvac units, elevator equipment, plus misc. Repairs. Date: September 19, 2011 Contractor: Davis Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: September 20, 2011 | Expiration date: September 18, 2012 | Current use: Commercial | Permit id: 6296072 | |||||
SCORE 100 Fire alarm installation. 8 31 11 elevator recall only system, there is no f a in bldg. Remove facp from within stairwell, change as valve tamper to operate shunt trip breaker, delete heat in elevator room to opeate shunt trip breaker. Date: September 7, 2011 Contractor: Protection And Communications Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2011 | Expiration date: September 7, 2012 | Current use: Commercial | Permit id: 6293187 | |||||
SCORE 100 Installation of wire for elevator upgrade9 21 2012 jnl - about to expire letter mailed Date: August 24, 2011 Contractor: Protection And Communications Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 3, 2012 | Expiration date: August 23, 2012 | Current use: Commercial | Permit id: 6293578 | |||||
SCORE 100 Wire new hvac units, misc. Repairs and additions Date: August 11, 2011 Contractor: Davis Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: September 20, 2011 | Expiration date: August 10, 2012 | Current use: Industrial | Permit id: 6292355 | |||||
SCORE 95 Install (14) control units Date: June 21, 2011 Contractor: Evergreen Refrigeration Llc Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2011 | Expiration date: June 21, 2012 | Current use: Commercial | Permit id: 6286857 | |||||
Project cancelled 1 10 2011 -- sepa. Possible change of use to research and development. Ti to existing warehouse. Applicant: Belcher, Craig | Permit status: Cancelled | Permit id: 3005667 | |||||
SCORE 100 Swap out (6) metal halide high bays for (6) t8 high bays. Swap out (19) hid in coolers & freezers for 4t5 vapor tight fixtures, swap out (8) 2f96 strips for 2t5 vapor tight fixtures Date: October 11, 2011 Contractor: Southgate Electric Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 17, 2011 | Expiration date: October 10, 2012 | Current use: Commercial | Permit id: 6298341 |