Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. ![]() ![]() Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 10, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 86 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. ![]() ![]() Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 10, 2015 | Permit id: Pds2015-Resalt- | |||||
2 sq. Ft. Addition to detached 6 sq. Ft. Garage, convert all to guest living quarters and storage. ![]() ![]() Permit type: Residential alteration-addn | Permit status: Open | Permit id: Pds2017-Resalt- | |||||
SCORE 59 3,5 sqft re-roof to sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material 25 year comp proposed roofing material comp shingles manufacturer gaf brand and model timberline ultra hd birchwood color (if cool roof required) grey built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: June 8, 2017 | Permit id: Pds2017-Resalt- | |||||
Final ![]() Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final ![]() Permit status: Fail | Permit id: Pds2008-1009-20 |