Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
This project will construct civil infrastructure necessary as part of the dc power line undergrounding (dc plug) initiative. Work includes excavation within public right-of-way for new electric utility trenches and manholes. Work is proposed within the following blocks: faraday pl, nw from 44 faraday pl, nw to 44th st, nw; garrison st, nw from 45 garrison st, nw to 4408 garrison st, nw; 45th st, nw from 5016 45th st, nw to harrison st, nw; harrison st, nw from 4523 harrison st, nw to 4403 harrison st, nw. Date: September 24, 2015 Permit type: Excavation; electric ml conduit (trench), mega projects; dc plug | Permit status: Issued | Expiration date: March 27, 2017 | Permit id: Pa116604 | |||||
SCORE 79 This project will construct civil infrastructure necessary as part of the dc power line undergrounding (dc plug) initiative. Work includes excavation within public right-of-way for new electric utility trenches and manholes. Work is proposed within the following blocks: faraday pl, nw from 44 faraday pl, nw to 44th st, nw; garrison st, nw from 45 garrison st, nw to 4408 garrison st, nw; 45th st, nw from 5016 45th st, nw to harrison st, nw; harrison st, nw from 4523 harrison st, nw to 4403 harrison st, nw. Date: September 24, 2015 Contractor: Dc Plug Ddot Pepco Partnership Kyle Ohlson Permit type: Excavation; electric ml conduit (trench), mega projects; dc plug | Permit status: Issued | Expiration date: March 27, 2017 | Permit id: Pa116604 |