Content |
---|
At apt # h ---- as per the requirement contract with hpd and hpd doh guidelines, install six (6) new window guards complete and repair one (1) wind ![]() Permit type: Gc | Permit id: Ei04600 |
At apt# 3h, at kitchen and bathroom. Broken ceramic tiles and wooden floor. At kitchen. Broken defective ceramic floor tiles. Replace with n ![]() Permit type: Gc | Permit id: Eh18524 |
At north section bldg., at apartment # 3h , at bathroom :- supply,install and replace with new the broken frosted glass pane at lower window sash. ![]() Permit type: Gc | Permit id: Eh11743 |
At apt #d, at kitchen and bathroom. Broken / defective plastered ceiling due to water leak. Trace, locate, repair and concealed water leak at ![]() Permit type: Gc | Permit id: Eh02292 |
At apt #d, at kitchen and bathroom. Broken defective plastered ceiling due to water leak. Trace, locate, repair and concealed water leak at ![]() Permit type: Gc | Permit id: Eh02292 |
At apt # 1i -at bathroom: demo the entire floor approx. Sq. Ft. And remove sinking tub. Locate source of floor deflection and make proper repairs. V ![]() Permit type: Gc | Permit id: Ef19900 |
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti ![]() Permit type: Delead | Permit id: Ef08568 |
As per the requirement contract with hpd. Apartment # 3h: ==> supply and install total (2) new window guards complete as follows: living room (1 ![]() Permit type: Gc | Permit id: Ef05226 |
At public parts :- supply, install and replace with new the broken 3rd. And 4th. Metal angle iron up from 5th. Story intermediate landing to the roof, ![]() Permit type: Gc | Permit id: Ef00398 |
At public parts :- supply , install and replace with new total of two, the broken wire glass pane at both lower windows sash on 2nd. And 3rd. Stories ![]() Permit type: Gc | Permit id: Ef00395 |