Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Remove 2 chimneys till 2nd floor level. Remove wall,ceiling finishes at 3rd floor bathroom, hallway,office. Comlete renovations at 3rd floor bathroom, new tile and fixtures. New 1/2" bluebords with plaster at new areas. Frame 4 new closets at 3rd floor. Insulate attick with closed cell insulation. Replace doors and window casings at 2nd floor only. Remove existing hardwood floor at 2nd floor and install new oak h. Wood floor. Paint the whole 2-3rd floors. Install 2 kitchen base cabinets with counter top. New h. V. A. C. System at 2-3rd floor. New electrical work at 3rd floor bathroom. Re rough bathroom plumbing at 3rd floor. Permit type: Addition/alteration | Completion date: October 2, 2013 | Current use: Two-family | Parcel: 20034 | |||||
SCORE 100 Remove 2 chimneys till 2nd floor level. Remove wall,ceiling finishes at 3rd floor bathroom, hallway,office. Comlete renovations at 3rd floor bathroom, new tile and fixtures. New 1 2" bluebords with plaster at new areas. Frame 4 new closets at 3rd floor. Insulate attick with closed cell insulation. Replace doors and window casings at 2nd floor only. Remove existing hardwood floor at 2nd floor and install new oak h. Wood floor. Paint the whole 2-3rd floors. Install 2 kitchen base cabinets with counter top. New h. V. A. C. System at 2-3rd floor. New electrical work at 3rd floor bathroom. Re rough bathroom plumbing at 3rd floor. Permit type: Addition/alteration | Completion date: October 2, 2013 | Current use: Two-family | Permit id: 0 | Parcel: 20034 |