Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Install of wireless microcell antenna microcell equipment cable & cable tray. No batteries. ![]() ![]() Current use: Office | Permit id: #200702154245 | |||||
New wine bar with prep kitchen. Rebuild exterior deck. Hvac under sep permit. Sidewalk work under separate permit ![]() Current use: Office | Permit id: #201011154938 | |||||
SCORE 100 New wine bar with prep kitchen. Rebuild exterior deck. Hvac under sep permit. Sidewalk work under separate permit. Current use: Food/beverage h | Permit id: #201011154938 | |||||
SCORE 100 Interior demolition of 3rd floor construction of new offices & conference room. Restroom and breakroom upgrades. Current use: Office | Permit id: #201108051829 | |||||
SCORE 86 Replace interior ductwork on 4-5 ton hvac systems Current use: Office | Permit id: #201202093883 | |||||
SCORE 100 Add new fire alarm devices to existing fire alarm system in new ti space. Includes 8 horn strobes 2 strobes 1 bps 1 smoke detector Current use: Office | Permit id: #201203135950 | |||||
SCORE 86 Replace 2 rooftop hvac units Current use: Office | Permit id: #201204037412 | |||||
SCORE 99 Like for like voluntary system replacement (n) facp in non-sprinklered bldg-replace (e) 4 smokes & 5 pull stations with new devices at the same location. (e) horn strobes remain the same. Current use: Office | Permit id: #201310290508 | |||||
2nd floor interior tenant improvement including interior doors walls glazing coffee rooms ada restroom upgrades. ![]() ![]() Current use: Office | Permit id: #201308083815 | |||||
SCORE 67 2nd floor interior tenant improvement including interior doors walls glazing coffee rooms ada restroom upgrades; compliance with ord 155-13 not required Current use: Office | Permit id: #201308083815 | |||||
SCORE 67 2nd floor: revision to appl #2013. 0808. 3815 - remove shower from scope reconfigure restrooms & office partitions. Compliance with ordinance #155-13 not required Current use: Office | Permit id: #201402198825 | |||||
SCORE 86 New duct work. Reference#2013-03-08-3815 & 2014-02-19-8825. (new duct work) compliance with maher ordinance # 155-13 does not apply Current use: Office | Permit id: #201403059926 | |||||
1st floor: as built plans to reflect change 3 wall mount devices. To ceiling mount devices. No change in calls. Ref app#201310290508. N/a for maher. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 3, 2016 | Expiration date: July 3, 2016 | Current use: Office | Permit id: 201603031070 | |||||
Replace interior ductwork on 4-5 ton hvac systems ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 9, 2012 | Expiration date: February 17, 2013 | Current use: Office | Permit id: 201202093883 | |||||
3rd fl: full floor ti . Demolition of no9n structural finishes new partitoins at same location than existing new finishes and millwork new lighting and elec distribution new plumbing under another permit life safety in kind new exit signs. Maher not req ![]() Permit type: Building permit | Current use: Office | Permit id: #201505065475 | |||||
SCORE 99 Third floor: 35 lights 16 switches 23 receptacles. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E20120126390 | |||||
SCORE 100 3rd fl: full floor ti . Demolition of no9n structural finishes new partitoins at same location than existing new finishes and millwork new lighting and elec distribution new plumbing under another permit life safety in kind new exit signs. Maher not req Permit type: Building permit | Current use: Office | Permit id: #201505065475 | |||||
New tbar ceiling lighting cabinet paint elec outlet. Interior remodel only ![]() Permit type: Building permit | Current use: Retail sales | Permit id: #201510139551 | |||||
SCORE 95 New kitchen 3 conference rooms replace existing fixtures ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150724981 | |||||
SCORE 93 Installations of 56 modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20120314461 | |||||
SCORE 95 Fire alarm system like for like replacement. Life safety witness test ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20131024001 | |||||
SCORE 95 8 work stations ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20151026781 | |||||
Non structural partitions ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: December 27, 1991 | Expiration date: May 8, 1992 | Current use: Office | Permit id: 9124233 | |||||
SCORE 95 Tenant improvement: install new light fixtures and receptacles ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201602015896 | |||||
SCORE 95 Fire alarm system add-on with life safety witness test ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201602116202 | |||||
SCORE 65 Data cables will be installed from network rack to field locations for data. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201602236431 | |||||
SCORE 89 New t-bar ceiling lighting cabinet paint elec outlet. Interior remodel only Permit type: Building permit | Current use: Retail sales | Permit id: #201510139551 | |||||
Add new fire alarm devices to existing fire alarm system in new ti space. Includes 8 horn strobes 2 strobes 1 bps 1 smoke detector ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 13, 2012 | Expiration date: March 8, 2013 | Current use: Office | Permit id: 201203135950 | |||||
Electrical lighting & power supplement to #8613481 ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: May 27, 1987 | Current use: Office | Permit id: 8707166 | |||||
Parapet safety section file #1848 parapet reinforcement ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 19, 1986 | Expiration date: November 12, 1986 | Current use: Office | Permit id: 8603094 | |||||
2nd floor interior tenant improvement including interior doors walls glazing coffee rooms ada restroom upgrades. ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201308083815 | |||||
SCORE 86 Replace 2 rooftop hvac units Permit type: Building permit | Expiration date: October 3, 2012 | Current use: Office | Permit id: #201204037412 | |||||
Fabricate & install awning ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: July 27, 1987 | Expiration date: December 5, 1987 | Current use: Retail sales | Permit id: 8710465 | |||||
2nd floor interior tenant improvement including interior doors walls glazing coffee rooms ada restroom upgrades; compliance with ord 155-13 not required ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 8, 2013 | Expiration date: January 14, 2017 | Current use: Office | Permit id: 201308083815 | |||||
SCORE 86 Replace interior ductwork on 4-5 ton hvac systems Permit type: Building permit | Expiration date: August 23, 2012 | Current use: Office | Permit id: #201202093883 | |||||
SCORE 100 Work category: 5p; remodel handicap bathroom and kitchen. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20120201065 | |||||
SCORE 100 Replace 2 (e) hvac units on roof with same size units (5 ton). ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20120224721 | |||||
SCORE 67 2nd floor: revision to appl #2013. 0808. 3815 - remove shower from scope reconfigure restrooms & office partitions. Compliance with ordinance #155-13 not required Permit type: Building permit | Expiration date: June 20, 2014 | Current use: Office | Permit id: #201402198825 | |||||
SCORE 98 Work category: 2pb; rough and finish plumbing for four a. D. A. Water closets one urinal two lavatory sinks two drinking fountains and two floor drains one existing sink ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140218072 | |||||
New wine bar with prep kitchen. Rebuild exterior deck. Hvac under sep permit. Sidewalk work under separate permit. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: November 15, 2010 | Expiration date: May 21, 2014 | Current use: Office | Permit id: 201011154938 | |||||
SCORE 67 2nd floor interior tenant improvement including interior doors walls glazing coffee rooms ada restroom upgrades; compliance with ord 155-13 not required Permit type: Building permit | Expiration date: January 30, 2015 | Current use: Office | Permit id: #201308083815 | |||||
Earthquake retrofit -umb special procedure ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: November 23, 1998 | Expiration date: February 17, 2000 | Current use: Office | Permit id: 9824233 | |||||
Alter office layout remodel toilet rms add entrance ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: October 24, 1986 | Expiration date: December 11, 1987 | Current use: Office | Permit id: 8613481 | |||||
SCORE 100 New wine bar with prep kitchen. Rebuild exterior deck. Hvac under sep permit. Sidewalk work under separate permit. Permit type: Building permit | Expiration date: June 6, 2012 | Current use: Food/beverage hndlng | Permit id: #201011154938 | |||||
SCORE 100 Add new fire alarm devices to existing fire alarm system in new ti space. Includes 8 horn strobes 2 strobes 1 bps 1 smoke detector Permit type: Building permit | Expiration date: September 13, 2012 | Current use: Office | Permit id: #201203135950 | |||||
New duct work. Reference#2013-03-08-3815 & 2014-02-19-8825. (new duct work) compliance with maher ordinance # 155-13 does not apply ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: March 5, 2014 | Expiration date: February 28, 2015 | Current use: Office | Permit id: 201403059926 | |||||
Fabricate & install awning ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 8, 1987 | Expiration date: November 15, 1987 | Current use: Food/beverage hndlng | Permit id: 8707940 | |||||
New wine bar with prep kitchen. Rebuild exterior deck. Hvac under sep permit. Sidewalk work under separate permit ![]() Permit type: Building permit | Current use: Office | Permit id: #201011154938 | |||||
Like for like voluntary system replacement (n) facp in non-sprinklered bldg-replace (e) 4 smokes & 5 pull stations with new devices at the same location. (e) horn/strobes remain the same. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 29, 2013 | Expiration date: October 24, 2014 | Current use: Office | Permit id: 201310290508 | |||||
SCORE 100 Work category: 5p; change fixtures in same location ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150911184 | |||||
Bldg use: office ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: August 11, 1982 | Expiration date: January 21, 1983 | Permit id: 8206577 | |||||
Street space Permit type: Otc alterations permit | Permit status: Issued | Completion date: July 6, 2015 | Permit id: M600067 | |||||
Due to the interior remodeling on 1st flr 1 pull stn will be installed new notification appliances new devices will be tie in to (e)control panel in the lobby t. I. Pa 201510139551 fa 201310290508; maher n/a ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 10, 2016 | Expiration date: June 10, 2016 | Current use: Office | Permit id: 201602109246 | |||||
To comply with umb ordinance ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 19, 1996 | Expiration date: April 15, 1998 | Current use: Office | Permit id: 9610935 | |||||
Re - roofing ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: April 17, 1989 | Expiration date: April 17, 1990 | Current use: Office | Permit id: 8906297 | |||||
Replace 2 rooftop hvac units ![]() Permit type: Otc alterations permit | Permit status: Issued | Completion date: April 3, 2012 | Expiration date: March 29, 2013 | Current use: Office | Permit id: 201204037412 | |||||
Tenant improvement ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: April 1, 1988 | Expiration date: October 22, 1988 | Current use: Office | Permit id: 8804215 | |||||
Interior demolition of 3rd floor construction of new offices & conference room. Restroom and breakroom upgrades. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 5, 2011 | Expiration date: December 19, 2014 | Current use: Office | Permit id: 201108051829 | |||||
Install of wireless microcell antenna microcell equipment cable & cable tray. No batteries. ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: February 15, 2007 | Current use: Office | Permit id: 200702154245 | |||||
Erect sign ![]() Permit type: Sign-errect | Permit status: Complete | Completion date: February 26, 1987 | Expiration date: July 17, 1987 | Current use: Not applicable | Permit id: 8702557 | |||||
New t-bar ceiling lighting cabinet paint elec outlet. Interior remodel only ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: October 13, 2015 | Expiration date: January 29, 2017 | Current use: Retail sales | Permit id: 201510139551 | |||||
To erect single-faced electrical sign on wall ![]() Permit type: Sign-errect | Permit status: Expired | Completion date: May 4, 1998 | Expiration date: September 4, 1998 | Current use: Not applicable | Permit id: 9807960 | |||||
3rd fl: full floor ti . Demolition of no9n structural finishes new partitoins at same location than existing new finishes and millwork new lighting and elec distribution new plumbing under another permit life safety in kind new exit signs. Maher not req ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: May 6, 2015 | Expiration date: June 24, 2016 | Current use: Office | Permit id: 201505065475 | |||||
Street space & mta parking meter Permit type: Otc alterations permit | Permit status: Issued | Completion date: February 13, 2012 | Permit id: M301347 | |||||
2nd floor: revision to appl #2013. 0808. 3815 - remove shower from scope reconfigure restrooms & office partitions. Compliance with ordinance #155-13 not required ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: February 19, 2014 | Expiration date: February 15, 2015 | Current use: Office | Permit id: 201402198825 | |||||
Due to the interior remodeling on 1st flr 1 pull stn will be installed new notification appliances new devices will be tie in to (e)control panel in the lobby t. I. Pa 201510139551 fa 201310290508; maher n a ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: February 10, 2016 | Current use: Office | Permit id: 201602109246 | |||||
1st floor: as built plans to reflect change 3 wall mount devices. To ceiling mount devices. No change in calls. Ref app#201310290508. N a for maher. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: March 3, 2016 | Current use: Office | Permit id: 201603031070 | |||||
Like for like voluntary system replacement (n) facp in non-sprinklered bldg-replace (e) 4 smokes & 5 pull stations with new devices at the same location. (e) horn strobes remain the same. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: October 29, 2013 | Current use: Office | Permit id: 201310290508 | |||||
Installations of 56 modular workstations Permit status: Complete | Permit id: Ew20120314461 | |||||
Fire alarm system add-on with life safety witness test Permit status: Complete | Permit id: Ew201602116202 | |||||
Tenant improvement: install new light fixtures and receptacles Permit status: Complete | Permit id: Ew201602015896 | |||||
Third floor: 35 lights 16 switches 23 receptacles. Permit status: Complete | Permit id: E20120126390 | |||||
Data cables will be installed from network rack to field locations for data. Permit status: Complete | Permit id: Ew201602236431 | |||||
8 work stations Permit status: Complete | Permit id: Ew20151026781 | |||||
Installed data cable terminated tested labled all data calbes approx data cables Permit status: Issued | Permit id: E201511022656 | |||||
Fire alarm system like for like replacement. Life safety witness test Permit status: Complete | Permit id: Ew20131024001 | |||||
2nd floor office - 38 lights 12 switches 16 receptacles dishwasher microwave Permit status: Complete | Permit id: E201402187396 | |||||
New kitchen 3 conference rooms replace existing fixtures Permit status: Complete | Permit id: Ew20150724981 | |||||
Workcategory:5p;remodelhandicapbathroomandkitchen. ![]() Permit status: Complete | Expiration date: February 1, 2012 | Permit id: Pw20120201065 | |||||
Workcategory:2pb;roughandfinishplumbingforfoura. D. A. Waterclosets oneurinal twolavatorysinks twodrinkingfountains andtwofloordrains oneexistingsink ![]() Permit status: Complete | Expiration date: February 18, 2014 | Permit id: Pw20140218072 | |||||
Workcategory:5p;changefixturesinsamelocation ![]() Permit status: Complete | Expiration date: September 11, 2015 | Permit id: Pw20150911184 | |||||
Installnewfiredampers heatingcoiles outsideairfan controls. ![]() Permit status: Complete | Expiration date: March 5, 2014 | Permit id: Pm20140305731 | |||||
Replacesupplyandreturnairdiffusersforcosmeticreasonsinconjunctionwithbuildingeprmit201510139551. ![]() Permit status: Complete | Expiration date: February 8, 2016 | Permit id: Pm20160208720 | |||||
Replace2(e)hvacunitsonroofwithsamesizeunits(5ton). ![]() Permit status: Expired | Expiration date: February 24, 2012 | Permit id: Pm20120224721 | |||||
Installed data cable terminated tested labled all data calbes approx data cables Permit status: Issued | Permit id: E201511022656 | |||||
8 work stations Permit status: Complete | Permit id: Ew20151026781 | |||||
Data cables will be installed from network rack to field locations for data. Permit status: Complete | Permit id: Ew201602236431 | |||||
Third floor: 35 lights 16 switches 23 receptacles. Permit status: Complete | Permit id: E20120126390 | |||||
Fire alarm system add-on with life safety witness test Permit status: Complete | Permit id: Ew201602116202 | |||||
Tenant improvement: install new light fixtures and receptacles Permit status: Complete | Permit id: Ew201602015896 | |||||
Installations of 56 modular workstations Permit status: Complete | Permit id: Ew20120314461 | |||||
Fire alarm system like for like replacement. Life safety witness test Permit status: Complete | Permit id: Ew20131024001 | |||||
New kitchen 3 conference rooms replace existing fixtures Permit status: Complete | Permit id: Ew20150724981 | |||||
2nd floor office - 38 lights 12 switches 16 receptacles dishwasher microwave Permit status: Complete | Permit id: E201402187396 | |||||
Install of wireless microcell antenna, microcell equipment, cable & cable tray. No batteries. ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: February 15, 2007 | Current use: Office | Permit id: 200702154245 | |||||
Alter office layout, remodel toilet rms, add entrance ![]() ![]() Permit type: Additions alterations or repairs | Completion date: September 24, 1987 | Expiration date: October 24, 1986 | Current use: Office | Permit id: 8613481 | |||||
Electrical lighting & power, supplement to #8613481 ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: May 27, 1987 | Current use: Office | Permit id: 8707166 | |||||
Non structural partitions ![]() ![]() Permit type: Additions alterations or repairs | Completion date: January 29, 1992 | Expiration date: December 27, 1991 | Current use: Office | Permit id: 9124233 | |||||
To comply with umb ordinance ![]() ![]() Permit type: Additions alterations or repairs | Completion date: June 22, 1999 | Expiration date: June 19, 1996 | Current use: Office | Permit id: 9610935 | |||||
Earthquake retrofit -umb special procedure ![]() ![]() Permit type: Additions alterations or repairs | Completion date: June 22, 1999 | Expiration date: November 23, 1998 | Current use: Office | Permit id: 9824233 | |||||
New wine bar with prep kitchen. Rebuild exterior deck. Hvac under sep permit. Sidewalk work under separate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: November 29, 2011 | Expiration date: November 15, 2010 | Current use: Office | Permit id: 201011154938 | |||||
Interior demolition of 3rd floor, construction of new offices & conference room. Restroom and breakroom upgrades. ![]() ![]() Permit type: Otc alterations permit | Completion date: October 9, 2012 | Expiration date: August 5, 2011 | Current use: Office | Permit id: 201108051829 | |||||
Add new fire alarm devices to existing fire alarm system in new ti space. Includes 8 horn strobes, 2 strobes, 1 bps, 1 smoke detector ![]() ![]() Permit type: Otc alterations permit | Completion date: September 11, 2012 | Expiration date: March 13, 2012 | Current use: Office | Permit id: 201203135950 | |||||
2nd floor interior tenant improvement including interior doors, walls, glazing, coffee rooms, ada restroom upgrades; compliance with ord 155-13 not required ![]() ![]() Permit type: Otc alterations permit | Completion date: July 10, 2014 | Expiration date: August 8, 2013 | Current use: Office | Permit id: 201308083815 | |||||
3rd fl: full floor ti . Demolition of no9n structural finishes, new partitoins at same location than existing, new finishes and millwork, new lighting, and elec distribution, new plumbing under another permit, life safety in kind, new exit signs. Maher not req ![]() ![]() Permit type: Otc alterations permit | Completion date: January 6, 2016 | Expiration date: May 6, 2015 | Current use: Office | Permit id: 201505065475 | |||||
New t-bar ceiling, lighting, cabinet, paint, elec, outlet. Interior remodel only ![]() ![]() Permit type: Otc alterations permit | Completion date: March 4, 2016 | Expiration date: October 13, 2015 | Current use: Retail sales | Permit id: 201510139551 | |||||
Due to the interior remodeling on 1st flr,1 pull stn will be installed,new notification appliances,new devices will be tie in to (e)control panel in the lobby,t. I. Pa 201510139551, fa 201310290508; maher n a ![]() ![]() Permit type: Otc alterations permit | Completion date: March 4, 2016 | Expiration date: February 10, 2016 | Current use: Office | Permit id: 201602109246 | |||||
Data cables will be installed from network rack to field locations for data. ![]() Permit status: Complete | Completion date: March 3, 2016 | Permit id: Ew201602236431 | |||||
2nd floor office - 38 lights, 12 switches, 16 receptacles, dishwasher, microwave ![]() Permit status: Complete | Completion date: July 7, 2014 | Permit id: E201402187396 | |||||
Installed data cable, terminated, tested, labled all data calbes, approx data cables ![]() Permit status: Expired | Permit id: E201511022656 | |||||
New kitchen, 3 conference rooms, replace existing fixtures ![]() Permit status: Complete | Completion date: July 20, 2016 | Permit id: Ew20150724981 | |||||
Tenant improvement: install new light fixtures and receptacles ![]() Permit status: Complete | Completion date: March 3, 2016 | Permit id: Ew201602015896 | |||||
Installations of 56 modular workstations ![]() Permit status: Complete | Completion date: March 21, 2012 | Permit id: Ew20120314461 | |||||
Fire alarm system like for like replacement. Life safety witness test ![]() Permit status: Complete | Completion date: July 7, 2014 | Permit id: Ew20131024001 | |||||
8 work stations ![]() Permit status: Complete | Completion date: November 23, 2015 | Permit id: Ew20151026781 | |||||
Fire alarm system add-on with life safety witness test ![]() Permit status: Complete | Completion date: March 4, 2016 | Permit id: Ew201602116202 | |||||
Third floor: 35 lights, 16 switches, 23 receptacles. ![]() Permit status: Complete | Completion date: June 23, 2016 | Permit id: E20120126390 | |||||
Work category: 5p; change fixtures in same location ![]() Permit status: Complete | Completion date: September 14, 2015 | Expiration date: September 11, 2015 | Permit id: Pw20150911184 | |||||
Replace 2 (e) hvac units on roof with same size units (5 ton). ![]() Permit status: Expired | Expiration date: February 24, 2012 | Permit id: Pm20120224721 | |||||
Work category: 5p; remodel handicap bathroom and kitchen. ![]() Permit status: Complete | Completion date: March 29, 2012 | Expiration date: February 1, 2012 | Permit id: Pw20120201065 | |||||
Install new fire dampers, heating coiles, outside air fan, controls. ![]() Permit status: Complete | Completion date: July 9, 2014 | Expiration date: March 5, 2014 | Permit id: Pm20140305731 | |||||
Replace supply and return air diffusers for cosmetic reasons in conjunction with building eprmit 201510139551. ![]() Permit status: Complete | Completion date: February 24, 2016 | Expiration date: February 8, 2016 | Permit id: Pm20160208720 | |||||
Work category: 2pb; rough and finish plumbing for four a. D. A. Water closets,one urinal,two lavatory sinks,two drinking fountains,and two floor drains ,one existing sink ![]() Permit status: Complete | Completion date: July 9, 2014 | Expiration date: February 18, 2014 | Permit id: Pw20140218072 | |||||
SCORE 99 1st floor: as built plans to reflect change 3 wall mount devices. To ceiling mount devices. No change in calls. Ref app#201310290508. N/a for maher. Permit type: Building permit | Expiration date: July 3, 2016 | Current use: Office | Permit id: #201603031070 | |||||
SCORE 99 2nd floor office - 38 lights 12 switches 16 receptacles dishwasher microwave ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201402187396 | |||||
SCORE 75 Installed data cable terminated tested labled all data calbes approx data cables ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201511022656 | |||||
SCORE 100 Replace supply and return air diffusers for cosmetic reasons in conjunction with building eprmit 201510139551. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pm20160208720 | |||||
SCORE 100 Interior demolition of 3rd floor construction of new offices & conference room. Restroom and breakroom upgrades. Permit type: Building permit | Expiration date: January 4, 2013 | Current use: Office | Permit id: #201108051829 | |||||
SCORE 86 New duct work. Reference#2013-03-08-3815 & 2014-02-19-8825. (new duct work) compliance with maher ordinance # 155-13 does not apply Permit type: Building permit | Expiration date: September 5, 2014 | Current use: Office | Permit id: #201403059926 | |||||
SCORE 100 Install new fire dampers heating coiles outside air fan controls. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20140305731 | |||||
SCORE 99 Due to the interior remodeling on 1st flr 1 pull stn will be installed new notification appliances new devices will be tie in to (e)control panel in the lobby t. I. Pa 201510139551 fa 201310290508; maher n/a Permit type: Building permit | Expiration date: June 10, 2016 | Current use: Office | Permit id: #201602109246 | |||||
SCORE 99 Like for like voluntary system replacement (n) facp in non-sprinklered bldg-replace (e) 4 smokes & 5 pull stations with new devices at the same location. (e) horn/strobes remain the same. Permit type: Building permit | Expiration date: February 28, 2014 | Current use: Office | Permit id: #201310290508 |