Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Electric heat pump and/or air conditioner replacement, no modifications or alterations to existing system Date: August 27, 2015 Contractor: H V A C Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 20, 2016 | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: August 7, 2017 Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 2, 2017 Contractor: Integrity Solar Electric Corp Permit type: Addn | Permit status: Completed | Completion date: November 15, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: April 18, 2016 Permit status: Pass | Permit id: Pds2015-Resalt- |