Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Installation of mini-split system w/new duct work and electrical for existing sfd Date: July 2, 2015 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 24, 2015 | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd with 200a panel upgrade for existing sfd. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 30, 2015 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 16, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Installation of mini-split system w new duct work and electrical for existing sfd Date: July 2, 2015 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 24, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd with 200a panel upgrade for existing sfd. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 30, 2015 Contractor: American Solar Direct Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 16, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: November 23, 2015 Permit status: Pass | Permit id: Pds2015-Resalt- |