Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Upgrade 1 amp zinco sub-panel to 1 amp ge sub-panel and to relocate sub-panel from inside a closet to the hallway. Date: August 9, 2012 Contractor: Briggs John Permit status: Finaled | Permit id: B12-2716 |