Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: March 21, 2016 Permit status: Completed | Permit id: 672156 | |||||
Use permit Date: March 21, 2016 Permit status: Completed | Permit id: 675883 | |||||
Mechanical permit Date: December 2, 2015 Permit status: Completed | Permit id: 654497 | |||||
Electrical permit Date: April 5, 2016 Permit status: Active | Permit id: 681611 | |||||
Use permit Date: September 16, 2015 Permit status: Completed | Permit id: 639006 | |||||
Electrical permit Date: November 13, 2015 Permit status: Completed | Permit id: 646281 | |||||
Plumbing permit Date: February 1, 2016 Permit status: Completed | Permit id: 646276 | |||||
Plumbing permit Date: September 16, 2015 Permit status: Completed | Permit id: 639163 | |||||
Alteration permit Date: October 15, 2015 Permit status: Completed | Permit id: 645411 | |||||
Demolition permit Date: September 29, 2015 Permit status: Completed | Permit id: 641473 | |||||
Suppression permit Date: December 18, 2015 Permit status: Completed | Permit id: 651903 | |||||
Electrical permit Date: April 5, 2016 Permit status: Expired | Permit id: 681611 | |||||
Alteration permit Date: March 21, 2016 Permit status: Completed | Permit id: 672156 | |||||
Alteration permit Date: October 15, 2015 Permit status: Completed | Permit id: 645411 | |||||
Mechanical permit Date: December 18, 2015 Permit status: Completed | Permit id: 651900 | |||||
Plumbing permit Date: September 16, 2015 Permit status: Completed | Permit id: 639163 | |||||
Use permit Date: March 21, 2016 Permit status: Completed | Permit id: 675883 | |||||
Demolition permit Date: September 29, 2015 Permit status: Completed | Permit id: 641473 | |||||
Electrical permit Date: November 13, 2015 Permit status: Completed | Permit id: 646281 | |||||
Use permit Date: September 16, 2015 Permit status: Completed | Permit id: 639006 | |||||
Suppression permit Date: December 18, 2015 Permit status: Completed | Permit id: 651903 | |||||
Plumbing permit Date: February 1, 2016 Permit status: Completed | Permit id: 646276 | |||||
SCORE 100 Use registration of the first floor space to a restaurant with less than occupants and with take out available. Primary use is a sit-down restaurant (no sign on this application) Date: September 16, 2015 Contractor: Orens Brothers Inc Permit type: Use permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 639006 | |||||
SCORE 100 For installation of a fire suppression system for commercial kitchen hood. Date: December 18, 2015 Contractor: East Coast Business Fire Inc Permit type: Suppression permit | Permit status: Completed | Completion date: February 10, 2016 | Permit id: 651903 | |||||
SCORE 100 For installation of commercial kitchen exhaust hood system and associated ductwork as per plans. Date: December 18, 2015 Contractor: East Coast Business Fire Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: February 10, 2016 | Permit id: 651900 | |||||
SCORE 100 Installation of 16 replacement windows into existing openings. No structural change. Date: October 15, 2015 Contractor: Orens Brothers Inc Permit type: Alteration permit | Permit status: Completed | Completion date: December 5, 2015 | Permit id: 645411 | |||||
SCORE 100 Installation of new hvac system for restaurant on first floor and basement to include installation of 5 ton heating and colling unit with associated ductwork as per approved plans. Separate permit required for installation of commercial kitchen exhaust hood system Date: November 4, 2015 Contractor: Orens Brothers Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: February 10, 2016 | Permit id: 646215 | |||||
For use as sit-down restaurant on the first floor (as previously approved) with multi-family household living (three (3) dwellings) above. No change in height or area. No signs or parking on this application. Date: March 21, 2016 Permit type: Use permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 675883 | |||||
SCORE 100 Int demo and removal of oven from 1st floor restaurant ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: September 29, 2015 Contractor: Orens Brothers Inc Permit type: Demolition permit | Permit status: Completed | Completion date: November 28, 2015 | Permit id: 641473 | |||||
SCORE 100 Fixture replacement in 2 aparmtents each unit has - 1hwh, 1 lav,1 wc,1 bath tub 1 kitchen sink and dishwasher minor additional piping may need replacement as needed (mixed use)the installation will comply with the philadelphia plumbing code 2004 Date: September 16, 2015 Contractor: Scott Orens Permit type: Plumbing permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 639163 | |||||
SCORE 100 Install 25 replacement recepts, install of new recept use existing wire. Install of 12 replacement recessed lights, install of 8 new recessed lights, install of 2 new thermostat of 6 hard smoke detectors and replacement of 2 bathroom fans as per nec 2008 Date: April 5, 2016 Contractor: Scott Orens Permit type: Electrical permit | Permit status: Expired | Completion date: April 5, 2016 | Permit id: 681611 | |||||
SCORE 100 Relocation of supply & waste piping for fixtures, 1 kitchen sink, 1 dishwasher, 1 washing machine, 1 vanity, 1wc, 1 bathtub, 1hwh. The installation will comply with the philadephia plubming code 2004 Date: November 25, 2015 Contractor: Scott Orens Permit type: Plumbing permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 654495 | |||||
SCORE 87 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: December 2, 2015 Contractor: Orens Brothers R E Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 654497 | |||||
SCORE 100 Tenant electric fit-out as per nec 2008 & fire alarm as per nfpa 72 east district Date: November 13, 2015 Contractor: Scott Orens Permit type: Electrical permit | Permit status: Completed | Completion date: January 22, 2016 | Permit id: 646281 | |||||
SCORE 100 For interior level 2 alterations of 1st floor to create restaurant as per plans. For the construction of exterior stairs and ramp as per plans. Certificate of occupancy for first floor only. Separate permite required for mechanical, electrical, and plumbing work Date: October 19, 2015 Contractor: Orens Brothers Inc Permit type: Alteration permit | Permit status: Completed | Completion date: February 10, 2016 | Permit id: 632692 | |||||
SCORE 100 Erection of a non bearing partition within a dwelling unit on the third floor of an existing structure. No change in use, no structural work. Separate permit required for any change to plumbing, mechanical, electrical. Date: March 21, 2016 Contractor: Orens Brothers Inc Permit type: Alteration permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 672156 | |||||
SCORE 100 Interior plumbing alterations to create a restaurant on the 1st floor - fixtures equipment piping will comply with tables p-811. 2 & p-904. 7 of the philadelphia plumbing code and water supply to equipment will be protected by an isolation method listed in table 608. 1 of the 2009 international plumbing code - 1-1 4" fixture trap required on ice machine and 2" fixture trap required on the food prep indirect waste lines - note: separate permit(s) required for the fuel gas piping and the installation of the backflow prevention containment device at the water meter Date: February 1, 2016 Contractor: Scott Orens Permit type: Plumbing permit | Permit status: Completed | Completion date: February 10, 2016 | Permit id: 646276 |