Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Ez interior alterations. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to start Date: April 28, 2017 Client: Phelan Claire Price Gary | Permit type: Alteration permit | Permit status: Completed | Completion date: November 6, 2017 | Permit id: 779111 | |||||
SCORE 97 Replace stack, run pvc, install toilet, shower, vanity- 2 each. Pick up washing machine stand pipe, laundry tub, replace drain lines. New drain and water lines. Date: May 1, 2017 Contractor: Raymond Ross Client: Phelan Claire Price Gary | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 6, 2017 | Permit id: 778373 | |||||
Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: March 23, 2017 Client: Phelan Claire Price Gary | Permit type: Demolition permit | Permit status: Completed | Completion date: May 10, 2017 | Permit id: 768850 | |||||
SCORE 100 Change 100a panel, install 30- outlets, 10- switches, 4- gfis, 5- smokes and 2- carbon detectors... In accordance with 2008 nec for a one family building Date: May 9, 2017 Contractor: Rnv Electric Contractors Client: Phelan Claire Price Gary | Permit type: Electrical permit | Permit status: Completed | Completion date: September 20, 2017 | Permit id: 781781 |